| 1 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the EIC |
| 2 | Filling in foundatin and plinth with sand watered and rammed including all cost of materials, labour, conveyance, royalty, cess etc. complete |
| 3 | Cement Concrete (1:3:6) with 40 mm size hand broken granite metal ( HB ) including all cost of materials, labour, conveyance, royalty, Tools and Plants water for curing etc.all complete,as per OPWD. specification required for the work to finished items of work. |
| 4 | R.C.C. work of M20 grade with 20 mm and down grade crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, Tools and Plants water for curing etc. all complete, as per O.P.W.D. specification required for the work to finished items of work |
| 5 | Supplying ,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification |
| 6 | Brickwork with Fly ash bricks having crushing strength not less than 75 Kg/cm2 within cement mortar (1:6) in foundation and plinth including all cost of materials, labour, conveyance, royalty, cess etc. complete |
| 7 | RCC foundation, plinth band and footings bases of columns mass concrete, Drain walls & pre-cast slabs etc |
| 8 | RCC Colomn & Beam |
| 9 | RCC Lintels |
| 10 | RCC Roof Slab & Chhajja |
| 11 | Brickwork with Fly ash bricks having crushing strength not less than 75 Kg/cm2 within cement mortar (1:6) in super structure including all cost of materials, labour, conveyance, royalty, cess etc. complete |
| 12 | Cement concrete (1:2:4) with 12mm size crusher broken hard granite chips including hosting and laying all cost of materials, labour, conveyance, royalty, Tools and Plants water for curing etc.all complete,as per O.P.W.D. specification required for the work to finished items of work. (See Page no-44,Item no 7 of AoR-06) |
| 13 | Fixing marble tiles in floors treads or steps and landing on 25mm thick bed of cement mortar (1:1) (1cement : 1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles |
| 14 | Cost for Supplying, fitting & Fixing of G I Grills Gate at site |
| 15 | Add for other unforeseen Item such as Display Board & Photography etc Please Enable Macros to View BoQ information |