|
| 1 | Comprehensive maintenance of ductablesplit type Air condiioner of following capacity of any make .The job includes as under;-(i) Inspection, checking, cleaning with soap water and ALSTA SHINEto the coolingcoil and condenser unit.(ii) Inspection, checking and repair of all electrical components.(iii) Servicing of blower motors by greasing, oiling and servicing by cleaning thoroughly air filter.iv) During the servicing of the unit existing refregerant (Gas) shall be pump down and to kept safe custody for reuse. Location - PET CT, NECLEAR MEDICINE, RATINA CLINIC & CATH LAB Note :(a) Above job shall be carried out once in a every month.(b) All unsv spare parts (except from BOQ) shall be included in comprehensive maintenance. |
| 2 | (a) (c) 3 TR to 5.5 TR (cleaning of AHU filter ,grill,diffuserand outdoor unit 05Nos). |
| 3 | (b) 7.5 TR to 11 TR ( (cleaning of AHU filter ,grill,diffuserand outdoor unit 03Nos). Location CT SCAN |
| 4 | Dismantling of defective ductable split outdoor unit of any make of capacity upto 11.0 TR for thorough checking / repair of all accessories and components and reassembling the same after repair/ replacement of defective accessories / components and testing complete all as specified and directedincluding transportation to workshop and back.Note : (i) Supplying & fixing of new accessories/components required for the system shall be measured & paid separately.(ii) Replacement of seald compressor unit, painting etc shall be measured and paid separately.(iii) Old serviceable accessories / components obtained from dismantling shall be refixed as directed by Engineer -in - Charge and labour charges for refixing shall be deemed to be included in the unit of item rate. |
| 5 | S& F reciprocating/rortary /harmatically sealed/ scroll/ screw compressor suitable for capacity 3 to 5.5 TR and type ofsplit type AC including taking down unserviceable one complete all as specified and directed. |
| 6 | All as per item No 3 here-in-before but of capacity from 5.5 TR to 11.00 TR ductable type complete all as specified and directed. |
| 7 | S & F Aluminium fan blade suitable for following capacity ofsplit /megaductable split type Acincluding taking down unserviceable one complete all as specified and directed |
| 8 | upto 5.5TR(ductable ) |
| 9 | 5.5 TR to 11.00 TRductable type |
| 10 | S&F running dual capacitor of following capacityincluding taking down unserviceable onecomplete all as specified and directed. |
| 11 | 2.5 MFD |
| 12 | 4 MFD |
| 13 | 8 MFD |
| 14 | 10 MFD |
| 15 | 12 MFD |
| 16 | 36+6 MFD |
| 17 | 40+6 MFD |
| 18 | 45+6 MFD |
| 19 | 50+6 MFD |
| 20 | 60+6 MFD |
| 21 | S&F Air break contactor of following capacityincluding taking down unserviceable one complete all as specified and directed. |
| 22 | 40 Amps |
| 23 | 32 Amps |
| 24 | 25 Amps |
| 25 | 9 Amps |
| 26 | S&F MCB TPN of following capacity including taking down unserviceable one complete all as specified and directed. |
| 27 | 40 Amps |
| 28 | 32 Amps |
| 29 | Taking out unserviceable blower motor from existing location of following capacityductable outdoor unit & dismantling the blower motor, cutting/removing burnt copper wire and rewinding the same of existing gauge by super enamelled copper wire, varnishing heating and testing including replacement ofunserviceable 2 nos. bearing as adequatesize and reassembling the blower motor and fixed in the same location complete all as specified and directed |
| 30 | 5.5TR(ductable ) |
| 31 | 5.5 TR to 11.00TR (ductable ) |
| 32 | Material and labour for replacement of Sensorupto 5.5 TR capacity Split type AC complete all as specified and directed.Make: Indfoss or equivalent make as approved by GE |
| 33 | Material and labour for replacement of Sensorfrom 5.5 TR to 11 TR capacity Split type AC complete all as specified and directed.Make: Indfoss or equivalent make as approved by GE. |
| 34 | Material and labour for replacement of controllerupto 5.5 TR capacity Split type AC complete all as specified and directed.Make: Indfoss or equivalent make as approved by GE |
| 35 | Material and labour for replacement of controllerfrom 5.5 TR to 11 TR capacity Split type AC complete all as specified and directed.Make: Indfoss or equivalent make as approved by GE |
| 36 | Taking downunserviceable condensing coil from outdoor unit checking it & detecting the leakage andits necessary repair to be carried out and refixingin the same location of following capacity; |
| 37 | 5.5 TR(ductable ) |
| 38 | 5.5 to 11.0 TR (ductable ) |
| 39 | S&F V- Belt Size- A-28or as per suitable size including taking down unserviceable one complete all as specified and as directed. |
| 40 | S&Ftimer of ductable split AC of capacity up to 11.0 TR including taking down unserviceable one complete all as specified and directed. |
| 41 | Dismantling the u/s copper wire and Supply and Fixing the New copper wire of following |
| 42 | 3 Core 4 sqmm |
| 43 | 3 core 6 Sqmm |
| 44 | S&F suction/Discharge valve of following size including taking down unserviceable one complete all as specified and as directed. |
| 45 | 1 1/8\" |
| 46 | 5/8\" |
| 47 | 1/2\" |
| 48 | 3/8\" |
| 49 | 1/4\" |
| 50 | Supply & filling refrigerant gas for charging of 3 TR to 11.0 TR capacity mega and ductable split type Air Condition complete all as specified and directed. |
| 51 | S&F Copper pipecomplete all as specified and directed of following size ;- |
| 52 | 3/8” |
| 53 | 1/4” |
| 54 | 1/2” |
| 55 | 5/8 “ |
| 56 | S &FInsulation for cooling line complete all as specified and directed. |
| 57 | S & F MCCB, 3 pole, of breaking capacity 16 kA complete all as specified and as directed. |
| 58 | 63 Amps |
| 59 | 40 Amps |
| 60 | Comprehensive maintenance of cold storage/mortuary 4/6 body cabin of capacity 3 to 5 TR (motor and outdoor units - 03 Nos) of any make .The job includes as under;-(i) Inspection, checking, cleaning with soap water and ALSTA SHINEto the evaporator coils and condenser unit(ii)inspection of compressor,oil levelchecking and repair of all electrical components(iii) Servicing of blower motors by greasing, oiling and thermostat calibrationservicing by cleaning thoroughly air filter, iv) During the servicing of the unit existing refregerant (Gas) shall be pump down and to kept safe custody for re useLocation : Patient Cook House, QM Ration Store, Med Store, ECHS Med Store, Path Lab, TEEC & Mortuary. Note :(a) Above job shall be carried out once in a every month (b) All unsv spare parts (except from BOQ) shall be included in comprehensive maintenance. |
| 61 | Disconnecting defective sealed comprressor unit 2.5 to 5.5 TR from existing cold storage from thesystem and and fixing reconditioned sealed unit compressor in original position all as specified and as directed |
| 62 | Material and labour for PUF Panel Repair – Minor repairs to cracked/damaged panels using polyurethane foam and sealant complete all as specified and directed. |
| 63 | Material and labour for Sliding Door Hardware Repair – Re-alignment, wheel/ gasket/ handle replacement complete all as specified and directed. |
| 64 | Supply and fix Digital Temperature Controller suit for cold storage complete all as specified and directed. |
| 65 | Comprehensive maintenance of AC VRF Typeof capacity 25 to 48TR of of LG.The job includes as under;-(i) Inspection, checking, cleaning with soap water and ALSTA SHINE chlorite to the coolingcoils and condenser unit(ii)inspection of compressor,oil levelchecking and repair of all electrical components(iii) Servicing of blower motors by greasing, oiling and thermostat calibrationservicing by cleaning thoroughly air filter, iv) During the servicing of the unit existing refregerant (Gas) shall be pump down and to kept safe custody for re use(a) 48 TR(indoor 15 and outdoor unit 03Nos at Asha School). (b) 25 TR (Indoor 10 and outdoor unit 02 nos at OPD Block)(c) 35 TR (Indoor 10 and outdoor unit 02 nos at MI Room) Note :(a) Above job shall be carried out once in a every month(b) All spare parts (excpet mentioned in BOQ) shall be included in comprehensive maintenance. |
| 66 | Parts & Consumables items as Below: |
| 67 | Replacement of washable/reusable air filters for indoor units as required during AMC period. |
| 68 | Supply and replacement of faulty fan motor for indoor units. |
| 69 | Supply and replacement of faulty fan motor for outdoor unit. |
| 70 | Replacement of fan blade in case of breakage or imbalance (indoor/outdoor). |
| 71 | Replacement of indoor unit PCB in case of failure. |
| 72 | Replacement of outdoor unit PCB in case of failure. |
| 73 | Refrigerant gas top-up (R410A) including leak test and vacuuming as needed. |
| 74 | Minor repair and replacement of copper pipe insulation (nitrile rubber type). |
| 75 | Comprehensive maintenance of AC plant 60 TR of make Blue star at Radiation Oncology.The job includes the following;-(a) Blue Star shall check and render preventive maintenance service to all the equipmenteverymonthsduring the period of the contract. Blue Star will also attend/arrange to attend all normal break-downs if any, on call basis. CheckingthefunctioningofChillerunit/AirHandlingunit/Pumps/Coolingtower/Controlsandallsuchequipment coveredunderthecontract |
| 76 | (b) Freereplacingofdefective/wornoutpartswithneworrepairedpartsforcompressor/ thermostat/cutoutsbasedon ourassessment. |
| 77 | (c) Repairingofequipmentatsite/servicestationasthecasemaybe. |
| 78 | (d) Descaling of condenser/chemical cleaning, will be carried out once in a year, preferably during the winter months based on Blue Star engineers’ assessment on working condition of plant. Additional descaling, if required will be charged extra. Pre-filter replacement will be carried out basis Blue Star engineers’ assessment on its physical condition and working. |
| 79 | (e) Replenishing refrigerant gas and compressor oil in the system arising out of system defect, excluding sealed compressor. |
| 80 | (f) Checkingofcompressorforitsproperworking. |
| 81 | (g) Annualpumping-downandrestartingasandwhenrequired. |
| 82 | (h) Checking of Microprocessor control panel, control boards, transducers of packaged chillers/condensing unit for their correctnessandreplaceifnecessary. |
| 83 | (j) Replacingofpartsduetonormalwearandtear. |
| 84 | (k) All compressor related activities shall be carried out on chargeable basis if required for the compressor. The compressorisnotcoveredunderthecontract. |
| 85 | (l) Replacement of minor electrical components such as relays, and contactors. |
| 86 | Parts & Consumables Included Below: |
| 87 | Replacement of washable/reusable air filters for indoor units as required during AMC period. |
| 88 | Supply and replacement of sensor |
| 89 | Replacement of PCB in case of failure. |
| 90 | Refrigerant gas top-up (R410A) including leak test complete all as specified and directed. |
| 91 | Supply and fixing of thermal insulation on the sheet metal duct/pipe wrapped with Aluminium foil faced class \"O\" 25 mm thick closed cell nitrile rubber of 25 mm thickness complete all as specified and directed. |
| 92 | Compressor oil suitable for package type AC complete all as specified and directed. |
| 93 | Descaling and cleaning of AHU coils of 60 TR package AC at Radiation Oncoloty by using suitable cleaning agent from outside cooling tubes from inside by flowing suitable cleainng agentin the tubes for removing all foreign material deposited in the coils and tubes, complete all as specified and directed. |
| 94 | Supply, Installation of 24 SWG site supply/return Air Duct complete with supports complete all as specified and directed. |
| 95 | Supply, Installation & Commissioning of Aluminum power coated discrid grill complete all as specified and directed. |