| 1 | DEDUCTION |
| 2 | Salvage value of AC sheet recovered after its removal from roofing of 4500 MT godown ( Considering 50%) |
| 3 | Salvage value of steel (wind tie + j hooks)recovered after dismantaling from the gable wall of 4500 MT godown ( Considering 50%) |
| 4 | Salvage value of Brick recovered after dismantaling from the paraphet of 4500 MT godown ( Considering 50%) |
| 5 | Supplying fitting and fixing of precoated Galvanized iron profile sheet semi gloss of total coated thickness 0.45mm in roof drilling hole in wind ties including fixing of ridges valleys, wind ties including fixing of ridges valleys,wind ties etc. complete including cost of sheet and all fitting,all taxes labour,T&P etc.complete as per direction of Engineer-in-charge. |
| 6 | Dismantling GCI or AC sheet roofing after carefully removing the bolts & nuts including stacking of the materials for reuse and removing the debris away from the working area i.e.with in 50.00mtr. Lead. , including cost of all labour and T&P required for the work etc. complete. |
| 7 | Dismantling & removing cement concrete including stacking the useful materials for reuse and removing the debris away from the working area i.e. with in 50.00mtr. Lead., including cost of all labour and T&P required for the work etc. complete. |
| 8 | Gola concrete Cement concrete (1:2:4) using 12 mm size black hard granite chips of approved quality and from approved quarry including hoisting lowering laying and compacting with watering ,curring ,cost,conveyance, royalties and taxes of all materials ,cost of all labour and T&P required for the work etc, complete |
| 9 | Dismantling brick or stone masonry in lime or cement mortar above 3.00 mtr. height including stacking the useful materials for reuse and removing the debris away from the working area i.e. with in 50. m Lead., including cost of all labour and T&P required for the work etc. complete. |
| 10 | Brick work using Fly ash B.bricks having crushing strength not less tan 75kg/cm2 in C.M (1:6) using bricks of approved quality of size 10\"x 5\"x 3\" having diamensional tolerance ± 10% after immersing the bricks 6 hours in water before use including hoisting, lowering, laying, cutting, moulding, corbelling, champering, watering, curring in Foundation & Plinth with cost conveyance taxes royalties of all materials cost of all labour and T&P required for the work etc. complete. |
| 11 | 12 mm thick Cement Plaster(1:6) over rough surface of Brick masonry including racking out joints including watering , curring, cost , conveyance, royalties and taxes of all materials,cost of all labour and T&P required for the work etc. complete . |
| 12 | Wall painting 2 coats with weather paint of approved shade on wall surface to give an even shade etc, with all cost complete. |
| 13 | Priming One Coat with Primer of approved quality etc, with all cost complete. |
| 14 | Supplying fitting and fixing of windties etc with cost of all labour and T&P required for the work etc. complete. |
| 15 | Painting Two coats with Water Proofing Cement Paint of even shade ………..etc with all cost complete. |
| 16 | Painting Two Coats with approved Synthetic Enamel Paint of approved make ………. etc with all cost complete. |
| 17 | Rolling Shutter Repair viz., Lock plate repair, Spring adjustment, Greasing, MS Strip Replacement |
| 18 | Supplying and Fixing of Fibre Glass Panes in Top Ventilators…………etc with all cost complete. |
| 19 | Supplying and Fixing of Louvers in Bottom Ventilators and MS Jally in Top Ventilators…………etc with all cost complete. |
| 20 | Sand Filling in foundation and Plinth…………..etc with all cost complete. |
| 21 | CC (1:3:6) using 4 cm size HG Metal…………..etc with all cost complete. |
| 22 | Cement Punning ……..etc with all cost complete. Please Enable Macros to View BoQ information |