| 1 | Earth work excavation in foundation hard soil including moorum, stoney earth mixed with boulders with all leads and lifts including dressing and levelling the bed and depositing the excavated earth away from the work site with all leads and lifts including cost of all labour and T&P and cess required for the work and etc. complete in all respect and as per the direction by the Engineer-in-charge. |
| 2 | Supplying, filling in foundation and plinth with sand in layers well watered and rammed including cost, conveyance, royalty of all the materials required for the work labour with T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. |
| 3 | Cement Concrete (1:3:6) in Foundation using 4 cm size bhg metal including watering, curing with cost, conveyance, royalty and taxes of all materials and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. |
| 4 | Cement concrete (1:2:4) with 12mm size bhg metal including watering, curing with cost, conveyance, royalty and taxes of all materials and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. |
| 5 | Fly Ash Brick masonry with CM (1:6) in Foundation & Plinth including watering, curing with cost, conveyance, royalty and taxes of all materials & labour (T&P) etc. complete as per the direction of Engineer-in-Charge. |
| 6 | Fly Ash Brick masonry with C.M. (1:6) in Superstructure using Fly Ash Bricks including watering and curing with cost, conveyance, royalty and all taxes of materials and labour (T&P) required for the work etc. complete as per direction of Engineer-in-Charge. |
| 7 | Ground floor |
| 8 | First floor |
| 9 | 16 mm (5/8\") thick cement plaster (1:6) over brick walls finished smooth including watering & curing with cost, conveyance, royality & all taxes of materials & labour with T&P required for the work etc. complete as per direction of Engineer-in-Charge. |
| 10 | Ground floor |
| 11 | First floor |
| 12 | 12mm thick C.P. (1:6) over brick walls finished smooth including watering & curing with cost, conveyance, royality & all taxes of materials & labour with T&P required for the work etc. complete as per direction of Engineer-in-Charge. |
| 13 | Ground floor |
| 14 | First floor |
| 15 | R.C.C. M-25 using 20 mm & down size b.h.g.c.b chips including watering, curing with cost, conveyance, taxes and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. |
| 16 | A) Column Base |
| 17 | B) Plinth Band |
| 18 | Column / Beam |
| 19 | Ground Floor |
| 20 | 1st Floor |
| 21 | Lintel |
| 22 | Ground Floor |
| 23 | First floor |
| 24 | Chajja |
| 25 | Ground Floor |
| 26 | First floor |
| 27 | R.C.C. at Window Sill Level |
| 28 | R.C.C. Shelves |
| 29 | Stair Case |
| 30 | Roof Slab |
| 31 | Cutting, Bending, binding and tying the grills and placing in position including cost, conveyance, taxes of all materials and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. |
| 32 | Ground Floor |
| 33 | First Floor |
| 34 | Supplying, fitting, fixing of Vetrified tile flooring on 20mm thick bed of C.M. (1:4) jointed with neat cement slurry & pigment to match the shade including watering & curing with cost, conveyance, royality & all taxes of materials & labour with T&P required for the work etc. complete as per direction of Engineer-in-Charge. |
| 35 | Supplying, fitting, fixing of Vetrified tile in dados on 12mm thick C.P. (1:3) jointed with neat cement slurry & pigment to match the shade including watering & curing with cost, conveyance, royality & all taxes of materials & labour with T&P required for the work etc. complete as per direction of Engineer-in-Charge. |
| 36 | Supplying, fitting, fixing of Ceramic Glazed Wall tile in walls on 12mm thick C.P. (1:3) jointed with neat cement slurry & pigment to match the shade including watering & curing with cost, conveyance, royality & all taxes of materials & labour with T&P required for the work etc. complete as per direction of Engineer-in-Charge. |
| 37 | Providing, supplying and fitting and fixing of M.S. Door / Window shutters, gates & M.S. grills as per approved design etc. complete. |
| 38 | Labour for fitting, fixing of M.S. Door / Window shutters, grill gates etc. including cost of all labour with T&P required for the work etc. complete as per direction of Engineer-in-Charge. |
| 39 | Supplying and fitting-fixing of Un-plasticised poly vinyl chloride (UPVC) (FENESTA / NCL / VEKA LTD.). Casement Door - 60- Series duly manufactured using UPVC reinforced profiles of 60mmx55mmx2.5mm for outer frames, 102mmx60mmx2.25mm for casement door sash profile and 74mmx60mmx2.5mm mulion profile capable of mounting single glazing system, structurally reinforced with hot dip galvanised up to 50 microns of minimum thickness of 2.0 mm prefabricated and welded through fushion welding the door sash shall be fitted with 12mm thick WPC board of green play make duly fixed with EPDM wheathering seal resistance accessories like clipping locking system made of aluminium 1 No per set of sashes and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/deglazing at site etc, including cost and conveyance of all materials, accessories , labour charges, materials and product confirming to ASTM D 638 -14, EN-477-95 and other applicable codes and standards. |
| 40 | Supplying and fitting-fixing of Un-plasticised poly vinyl chloride (UPVC) (FENESTA / NCL / VEKA LTD.). Three track -Three panel sliding window-60-series duly manufactured using UPVC reinforced profiles of 108mmx45mmx2.5mm of outer frames and window sash of 39 mmx58mmx2.5mm capable of mounting single glazing system, structurally reinforced with hot dip galvanised up to 50 microns of minimum thickness of 1.5 mm prefabricated and welded through fushion welding the window frame shall be fitted with 6mm thick clear touchenced glass of SAINT -GOBAIN make duly fixed with EPDM wheathering seal resistance and the system is to be installed using Unreinforced large coupler at the site using anchoner fasteners, silicon rubber sealant , easy glazing/deglazing at site etc, including cost and conveyance of all materials, accessories , labour charges, materials and product confirming to ASTM D 638 -14, EN-477-95 and other applicable codes and standards. |
| 41 | Structural Steel work riveted, bolted or welded in built-up section, trusses and framed work including cutting, hoisting fixing in position and applying a primer coat of approved steel primer etc. complete. |
| 42 | Supplying, fitting, fixing of Bhusan colour sheets 0.50mm in roofing including drilling holes in wind ties and fixing with \"J\" or \"L\" hooks, fixing of ridges, valleys, wind ties etc. including cost, conveyance and taxes of all materials and labour, T&P etc. as required for the work complete as per the direction of the Engineer-in-Charge. |
| 43 | Applying Acrylic Wall Putty (Water Based) to wall surface including cost of all materials and labour (T&P) etc. complete as per the direction of Engineer-in-Charge. |
| 44 | Ground Floor |
| 45 | First Floor |
| 46 | Distempering two coats to walls with distemper of approved shade on new work to give an even shade including cost of distemper etc. complete as per specification and direction of the Engineer-in-charge. |
| 47 | Ground Floor |
| 48 | First Floor |
| 49 | Finishing out side wall surface with Weather Coat (I.S.I) two coats over a coat of primer with any approved shade including cost of all materials and labour (T&P) etc. complete as per the direction of Engineer-in-Charge. |
| 50 | Ground Floor |
| 51 | First Floor |
| 52 | Painting two coats to doors & windows etc. with any approved paints including cost, conveyace of all materials and labour (T&P) etc. complete as per the direction of Engineer-in-Charge. |
| 53 | Ground Floor |
| 54 | First Floor |
| 55 | Supplying, fitting afixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc. with cost conveyance, taxes of all materials labour, T&P etc. required for the complete as per the direction of Engineer-in-Charge. Please Enable Macros to View BoQ information |