| 1 | Earth work in excavation of foundation in all kind of soil within 50 m initial loead and initieal lift, including dressing and levelling the bed etc. complete |
| 2 | Supplying and filling foundation and plinth with sand wall watered and rammed with cost conveyance and royality, taxes of all materials and labour (T&P) etc. complete. |
| 3 | Cement Concrete (1:3:6) in Foundation using 4 cm size bhg metal including watering, curing with cost, conveyance, royalty and taxes of all materials and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. |
| 4 | Fly Ash Brick masonry with CM (1:6) in Foundation & Plinth including watering, curing with cost, conveyance, royalty and taxes of all materials & labour (T&P) etc. complete as per the direction of Engineer-in-Charge. |
| 5 | Fly Ash Brick masonry with C.M. (1:6) in Superstructure using Fly Ash Bricks including watering and curing with cost, conveyance, royalty and all taxes of materials and labour (T&P) required for the work etc. complete as per direction of Engineer-in-Charge. |
| 6 | Ground floor |
| 7 | First Floor |
| 8 | Second Floor |
| 9 | R.C.C. M-20 using 20 mm & down size h.g.c.b chips including watering, curing with cost, conveyance, taxes and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. |
| 10 | Ground floor |
| 11 | First Floor |
| 12 | Second Floor |
| 13 | Cutting, Bending, binding and tying the grills and placing in position including cost, conveyance, taxes of all materials and cost of all labour (T&P) etc. complete as per the direction of Engineer-in-Charge. |
| 14 | Ground floor |
| 15 | First Floor |
| 16 | Second Floor |
| 17 | Rigid smooth centering & shuttering to R.C.C.work including falsework & dismentaling them after casting including cost of materials comp |
| 18 | Ground floor |
| 19 | Column base footing |
| 20 | Plinth Band |
| 21 | Lintel Band |
| 22 | Beam and Column |
| 23 | Roof Slab,Chajja |
| 24 | Staircase |
| 25 | First Floor |
| 26 | Lintel Band |
| 27 | Beam and Column |
| 28 | Roof Slab,Chajja |
| 29 | Staircase |
| 30 | Second Floor |
| 31 | Lintel Band |
| 32 | Beam and Column |
| 33 | Roof Slab,Chajja |
| 34 | 12mm thick C.P. (1:6) over brick walls finished smooth including watering & curing with cost, conveyance, royality & all taxes of materials & labour with T&P required for the work etc. complete as per direction of Engineer-in- |
| 35 | Ground floor |
| 36 | First Floor |
| 37 | Second floor |
| 38 | 16 mm (5/8\") thick cement plaster (1:6) over brick walls finished smooth including watering & curing with cost, conveyance, royality & all taxes of materials & labour with T&P required for the work etc. complete as per direction of Engineer-in-Charge. |
| 39 | Ground floor |
| 40 | First floor |
| 41 | Second floor |
| 42 | 6mm thick C.P. (1:4) as ceiling plaster including watering, curing, conveyance, royality & all taxes of materials & labour with T&P required for the work etc. complete as per direction of Engineer-in-Charge. |
| 43 | Ground floor |
| 44 | First Floor |
| 45 | Second floor |
| 46 | Supplying, fitting and fixing vitrified tile (Printed) in floors of size 600mm x 600mm of approved make conformaing to IS : 13755 laid on 20 mm thick cement mortar (1:4) (1 cement :4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of E.I.C. (For New work only) |
| 47 | Ground floor |
| 48 | First Floor |
| 49 | Fixing Vitrified tiles (size 600mmx600mm) (Printed) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including cost, carriage, cost of all labour etc. complete. |
| 50 | Ground floor |
| 51 | First Floor |
| 52 | Supplying, fitting and fixing vitrified Industrial tile in floors , treads or steps and 20 mm thick bed of cement mortar 1:4 ( 1cement : 4 sand) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including cost carriage royalty & taxes of all materilas ,cost of all labours T&P etc complete |
| 53 | Ground floor |
| 54 | First Floor |
| 55 | Supplying, fitting and fixing Industrial tile in dados skirting and risers of steps on 12 mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including cost carriage royalty & taxes of all materilas ,cost of all labours T&P etc complete |
| 56 | Ground floor |
| 57 | First Floor |
| 58 | Priming one coat with wall primer water bond cement primer to give an even shade including cost of weather coat, all dlabour,materials, T&P etc complete |
| 59 | Ground floor |
| 60 | First Floor |
| 61 | second floor |
| 62 | Finishing wall surface of wall with Acrylic wall putty (Waterbased) of approved make and finishing smooth and even sutface to receive paintingincluding cost of scaffolding staging charges with cost of materials taxes, labour ,T&P etc comp. |
| 63 | Ground floor |
| 64 | First Floor |
| 65 | second floor |
| 66 | Wall painting two coats with plastic emulsion paints of approved shade on new work to give an even shade including cost of paint all labour,materials, T&P etc complete |
| 67 | Ground floor |
| 68 | First Floor |
| 69 | second floor |
| 70 | Finishing to the exposed surfaces of Wall with weather coat of any approved shade on new work two coat to give an even shade including cost of weather coat, all labour,materials, T&P etc complete. |
| 71 | Ground floor |
| 72 | First Floor |
| 73 | second floor |
| 74 | Supplying of MS sheet and angle welded doors and windows with all fittings of approved design and size at worksite including all cost of materials , loading , unloading , transporting charges & priming one coats with approved primer etc complete |
| 75 | window |
| 76 | Grills |
| 77 | collapsible gate (2.4 mtr x 2.1 mtr) |
| 78 | priming one coat with approved primer on iron works with any approved paint including cost of primer , all labour,materials, T&P etc complete. |
| 79 | Ground floor |
| 80 | First Floor |
| 81 | second floor |
| 82 | Painting two coat with enamel paint of approved quality including sand paper,polishing surfaces,cost of paints,cost of all labours, T&P, etc completed in all floors as per directionof Engineer- in - charge |
| 83 | Ground floor |
| 84 | First Floor |
| 85 | second floor |
| 86 | Fitting , fixing,of iron doors / windows shutter with frame of approved design and size with all labour and T&P required for the work etc complete as per the direction of EIC |
| 87 | supplying fitting and fixing of 32 mm thick flush door shutter with approved quality of 30 mm thick BWR block board pasted with 1 mm thick sunmica on both sides of approved design and quality including cost of all door fittings and features etc complete. |
| 88 | supplying fitting and fixing of two track UPVC sliding window of approved make with 6 mm thick glass of approved quality complete with frame shutters and all fittings and fixtures |
| 89 | 2.50cm thick grading concrete (1:2:2) on roof slab with 6mm size hard grainite(CB) chips on new work of approved quality from approved quarry including laying, hire charges of concrete mixture,curing, cost of all materials , water -proofing compounds ,carriage,royalty ,cost of all labour, T&P etc completed and as per direction of Engineer- in charge |
| 90 | First Floor |
| 91 | second floor |
| 92 | Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm diaof 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost,conveyance, taxes of all materials, T&P etc. required for the complete in alll respect. |
| 93 | Add for electrification |
| 94 | Add for photography, site clearance etc. |
| 95 | Add towards fire fighting arrangments (fire exhauster) |
| 96 | Add for anti-termite treatment in foundatoni and flooring with approved chemicals |
| 97 | Add for transparancy board and sign board (after completion) Please Enable Macros to View BoQ information |