| 1 | Earth work in excavation of foundation in hard soil with all lead and lift including levelling the bed of the foundation to the required width and depth & depositing the excavated earth away from works site etc.complete.as per specification and direction of the Engineer-in-charge. Ground Floor |
| 2 | Filling foundation and Plinth with sand well watered and rammed including cost carriage and royalty of sand etc.complete as per the specification and direction of the Engineer-in-charge. Ground Floor |
| 3 | Cement Concrete (1:4:8) using 40mm size C.B.H.G. chips including cost carriage royalty and taxes of all materials etc. complete as per specification and direction of the Engineer-in-charge. Ground Floor |
| 4 | Flyash Brick masonary in C.M (1:6) in foundation and plinth including cost, carriage royalty taxes all labour, T&P etc required for the work etc complete.as per specification an direction of the Engineer-in-charge. In Foundation and Plinth |
| 5 | Flyash Brick masonary in C.M (1:6) in Superstructure including cost, carriage royalty taxes all labour, T&P etc required for the work etc complete.as per specification an direction of the Engineer-in-charge. In Superstructure Ground Floor |
| 6 | First Floor |
| 7 | Second Floor |
| 8 | Third Floor |
| 9 | 16mm thick cement plaster in C.M (1:6) for brick work including cost carriage royalty and curring etc.complete as per specification and direction of the Engineer-in-charge.Ground Floor |
| 10 | First Floor |
| 11 | Second Floor |
| 12 | Third Floor |
| 13 | 12mm thick cement plaster in C.M (1:6) for brick work including cost carriage royalty and curring etc.complete as per specification and direction of the Engineer-in-charge.Ground Floor |
| 14 | First Floor |
| 15 | Second Floor |
| 16 | Third Floor |
| 17 | Fixing antiskid tiles in floors treads of steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing etc complete including cost of tile as per specification and direction of the Engineer-in-charge. Ground Floor |
| 18 | First Floor |
| 19 | Second Floor |
| 20 | Supplying, fitting and fixing antiskid tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tile as per specification and direction of the Engineer-in-charge.Ground Floor |
| 21 | First Floor |
| 22 | Second Floor |
| 23 | R.C.C. M-20 using 20mm and down graded Chips of approved quality from approved quarry for RCC works including hoisting and laying with cost, conveyance & royalty of materials T&P articles required for the work etc. complete as per direction of the Engineer-in-Charge. A. LintelGround Floor |
| 24 | A. LintelFirst Floor |
| 25 | A. LintelSecond Floor |
| 26 | A. LintelThird Floor |
| 27 | B Lintel bearing chajjaGround Floor |
| 28 | B Lintel bearing chajjaFirst Floor |
| 29 | B Lintel bearing chajjaSecond Floor |
| 30 | B Lintel bearing chajjaThird Floor |
| 31 | C. Plinth band |
| 32 | D. Column Footing |
| 33 | E. Column Sup/BeamGround Floor |
| 34 | E. Column Sup/BeamFirst Floor |
| 35 | E. Column Sup/BeamSecond Floor |
| 36 | E. Column Sup/BeamThird Floor |
| 37 | F. Roof SlabGround Floor |
| 38 | F. Roof SlabFirst Floor |
| 39 | F. Roof SlabSecond Floor |
| 40 | F. Roof SlabThird Floor |
| 41 | Staircase Ground Floor |
| 42 | Staircase First Floor |
| 43 | Staircase Second Floor |
| 44 | Supplying, fitting and placing HYSD bar reinforcement for R.C.C work including cutting,bending,binding and tying grills and placing in position including cost of steel and binding wire etc.complete as per specification and direction of the Engineer-in-charge. Ground Floor |
| 45 | First Floor |
| 46 | Second Floor |
| 47 | Third Floor |
| 48 | 2.5 cm thick grading concrete (1:2:2) on foor slab with 6 mm size H.H. Chips including cost, carrage royalty, taxes, all labour and T & P etc complete as per specification and direction of the Engineer -in- charge. Second Floor |
| 49 | Third Floor |
| 50 | Painting two coats with weather coats of approved shade on old work to give an even shade including cost of paint etc. complete as per specification and direction of the EIC.Ground Floor |
| 51 | First Floor |
| 52 | Second Floor |
| 53 | Third Floor |
| 54 | Priming one coat with approved water bound wall cement primer to the plastered surface including cost of primer and all labour T& P articles required for the wok etc.complete as per specification and direction of the Engineer-in-charge.Ground Floor |
| 55 | First Floor |
| 56 | Second Floor |
| 57 | Third Floor Please Enable Macros to View BoQ information |