| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead as per scope of work |
| 2 | Taking out doors/windows/rolling shutter and clerestory window shutters (steel or wood or aluminium) including stacking of serviceable materialas per scope of work |
| 3 | Demolishing RCC work by manually/ mechanical means including cutting reinforcement bars manually/by mechanical means in RCC works as per scope of work |
| 4 | Demolishing Brick work manually /by mechanical means including stacking of serviceable material as per scope of work |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth as per scope of work |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering as per scope of work |
| 7 | Providing and laying in position machine mixed and machinevibrated cement concrete ofM-20 gradereinforced cement concrete as per scope of work |
| 8 | Reinforcement for RCC work including supplying, straightening, cutting, bending, placing in position and binding with 22 Gauge as per scope of work |
| 9 | Brick work with bricks of minimum crushing strength 60 kg/cm2 in superstructure above plinth level as per scope of work |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for up to floor V levelas per scope of work |
| 11 | 12mm cement plaster of mix1:4(1 cement : 4 sand) for fair faces including cost and conveyance of all materials as per scope of work |
| 12 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface as per scope of work |
| 13 | Distempering with 1st quality acrylic distemper (ready mixed) of approved manufacturer,andof required shadeas per scope of work |
| 14 | Finishing walls with water proofing cement paint of required shade : (Two or more coats applied @ 3.84 kg/10 sqm) as per scope of work |
| 15 | Providing and laying premium quality polished fully vitrified floor tiles in different sizes (thickness to be specified by the manufacturer as per scope of work |
| 16 | Providing and fixing IS:3564 marked Aluminium die cast body tubular type universal hydrualic door closer as per scope of work |
| 17 | Providing and fixing aluminium hanging floor door stopper, ISI marked, anodised (anodic coating not less than grade AC 10 as per scope of work |
| 18 | Engaging one carpenter and one helper on instruction of E.I.C. to carry out urgent repair as per scope of work |
| 19 | French spirit polishing :Two or more coats on new works including a coat of wood filler as per scope of work |