|
| 1 | Construction of Embankment with Material Obtained from R.O.W. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 & also including all taxes. Labour cess but excluding GST) |
| 2 | Construction of Earthen Shoulders with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 & also including all taxes. Labour cess but excluding GST) |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth MORD specificaions 401 & also including all taxes. Labour cess but excluding GST) |
| 4 | Providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes to water bound macadam specification (G-2) including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, MORD specifications 405.2 & also including all taxes. Labour cess but excluding GST) |
| 5 | Providing, laying, spreading and compacting of sukrut stone aggregates of specific sizes to water bound macadam specification (G-3) including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, MORD specifications 405.3 & also including all taxes. Labour cess but excluding GST) |
| 6 | Brick edging on both side of road with first class brick 8 cm. (3”) wide 12 cm. (4.50”) deep laid with mud mortar including all materials, lab our, T & P etc. complete. & also including all taxes. Labour cess but excluding GST) |
| 7 | Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per sqm using mechanical means as per Technical Specification Clause 502 & also including all taxes. Labour cess but excluding GST) |
| 8 | Providing and applying tack coat with Bitumen (VG-10) using distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. & also including all taxes. Labour cess but excluding GST) |
| 9 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm -11.2 mm aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, by manual MORd specific. 508. & also including all taxes. Labour cess but excluding GST) |
| 10 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 & also including all taxes. Labour cess but excluding GST) |
| 11 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with equirements of lines, grades and cross-sections, and transporting to the emba & also including all taxes. Labour cess but excluding GST) |
| 12 | Concrete with 4cm. gauge brick ballast, sand of 1.25 F.M. and cement in proportion of 8:4:1 in foundation and under floors including supply of all materials labour and tools and plants etc. required for proper completion for the work. & also including all taxes. Labour cess but excluding GST) |
| 13 | M-150 brick work in 1:4 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. & also including all taxes. Labour cess but excluding GST) |
| 14 | RCC Hume pipes 600mm dia NP-3 inculiding collars/ spigot jointed with stiff mixture of cement in the proportion of 1:2 (1 cement : 2 find sand) including testing of joints. & also including all taxes. Labour cess but excluding GST) |
| 15 | Struck pointing with cement mortar consisting 1 part cement and 2 parts of sand of 1.25 fineness modulus including supply of all materials labour and T&P etc. required for proper completion of the work. & also including all taxes. Labour cess but excluding GST) Please Enable Macros to View BoQ information |