Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Repair/ maintenance of of Addressible/Non addressible type/conventional auto dialer fire alarm system complete type at Akash missilebuilding single or multi stories having Heat/smoke/flame detectors and accessoriescontroled through one or more control panels of any loop for functiong of the purpose installed with all accessories, such as MCP, Hooter, detectors etc for finding out defects if any or its serviceability complete all as specified and directed. The maintenace schedule shall cover 01 preventive maintenance schedule and unlimited breakdown call by a qualified technician as aproved by GE. The spare parts required will be measured and paid seperately. No of panels - 02 , No of detectors - 70Note :(i) The Maintenance includes disconnecting of all uncleaned / dirty smoke detector from roof and make it to be cleaned with wet/dry cotton cloths , making the detectors dry and fix/connect the same and make it functionable, replacement of old unserviceable spares. (ii) The Maintenance includes checking of all disconnected circuit / wire of all the smoke detectors with the fire alarm control panel and reconnect the same and make it functionable.(iii)The maintenance includesTesting of fire alarm system as per relevant IS in the presence of the user and Engr-in-charge is deemend to be included in the quoted rate. The unserviceability issued of fire alarm system shall be attended with in 72 hours failing which a sum of Rs 2500/- per day shall be recoverd from the contractor(iv) Required spares shall be measured and paid seperately under relevant items.(v) A register shall be maintained by the contractor for each visit and kept in record duly signed by user and JE/ Engr-in-Charge. |
| 2 | All as per item no.1 above but at Nano hanger office complex , no of panels - 03 , No of detectors - 190 complete all as specified and directed by Eng-in-Charge. |
| 3 | All as per item no.1 above but at 1 Sqn complex , no of panels - 02 , No of detectors - 80 complete all as specified and directed by Eng-in-Charge. |
| 4 | All as per item no.1 above but at 7 Sqn complex , no of panels - 02 , No of detectors - 88 complete all as specified and directed by Eng-in-Charge. |
| 5 | All as per item no.1 above but at IMMOLS, no of panels - 01 , No of detectors - 70 complete all as specified and directed by Eng-in-Charge. |
| 6 | All as per item no.1 above but at DWR, no of panels - 01 , No of detectors - 90 complete all as specified and directed by Eng-in-Charge. |
| 7 | All as per item no.1 above but at POL Store, no of panels - 01 , No of detectors - 6 complete all as specified and directed by Eng-in-Charge. |
| 8 | All as per item no.1 above but at Avonics lab, no of panels - 02 , No of detectors - 85 complete all as specified and directed by Eng-in-Charge. |
| 9 | All as per item no.1 above but at 706 SU, no of panels - 04 , No of detectors - 65 complete all as specified and directed by Eng-in-Charge. |
| 10 | All as per item no 1 above but at CEO Complex, no of panels-02, No of detectors-110 complete all as specified and directed by Engr-in- Charge |
| 11 | All as per item no 1 above but at GIMI &ATEC Sec, no of panels-02, No of detectors-98 complete all as specified and directed by Engr-in-Charge |
| 12 | All as per item no.1 above but at WSMT, no of Panels-01 No of detectors-18 complete all as specified and directed by Engr-in-Charge |
| 13 | All as per item no.1 above but at Old 10 Tetra School, no of panels-02, No of detectors-68 complete all as specified and directed by Engr-in- Charge |
| 14 | All as per item no.1 above but at New 10 Tetra School, no of panels-02, No of detectors-218 complete all as specified and directed by Engr-in- Charge. |
| 15 | All as per item no 1 above but at 26 MMPU, no of panels-01, Nos of detectors-20 complete all as specified and directed by Engr-In-Charge. |
| 16 | All as per item no 1 above but at Tech Flight and Central Elint Complex, no of panels-02, No of detectors-125 complete all as specified and directed by Engr-in-Charge |
| 17 | All as per item no 1 above but at Ejection seat bay, no of panels-01, No of detectors-16 complete all as specified and directed by Engr-in-Charge |
| 18 | All as per item no 1 above but at Bison hanger, no of panels-01, No of detectors-20 complete all as specified and directed by Engr-in-Charge |
| 19 | All as per item no 1 above but at 9 Sqn, no of panels-02, No of detectors-120 complete all as specified and directed by Engr-in-Charge |
| 20 | All as per item no 1 above but at B flight, no of panels-02, No of detectors-60 complete all as specified and directed by Engr-in-Charge |
| 21 | All as per item no 1 above but at SU -30, no of panels-02, No of detectors-35 complete all as specified and directed by Engr-in-Charge |
| 22 | All as per item no 1 above but at ERS, no of panels-02, No of detectors-55 complete all as specified and directed by Engr-in-Charge |
| 23 | All as per item no 1 above but at CR & SS Hanger, no of panels-02, No of detectors-55 complete all as specified and directed by Engr-in-Charge |
| 24 | All as per item no 1 above but at P-73 Hanger, no of panels-02, No of detectors-40 complete all as specified and directed by Engr-in-Charge |
| 25 | All as per item no 1 above but at HS-4 Hanger, no of panels-02, No of detectors-38 complete all as specified and directed by Engr-in-Charge |
| 26 | Taking down unserviceable fire alarm panel addressable/non addressble of make model 2/4 loop capacity upto 200 detectors by removing /disconnecting the connections and repair /replace the complete unserviceble parts such as central processing unit/Control card,Display,Signalling line circuits,user interface,communication module,battery and software installation and programming need to be done at only in OEM team (Apollo/Agni/Ravel/Edward) with complete restoration as healthy panel all as specified and directed by Engr-in-charge. |
| 27 | Supply only in replacement of Mother board card suitable for any unserviceable Fire alarm control panel Addressible/no addressible including testing complete all as specified and directed .Note :(1) The mother board card shall be purchased only from the OEM. |
| 28 | Supply only inreplacement of Loop card suitable for any unserviceable Fire alarm control panel Addressible/no addressible including testing complete all as specified and directed .Note :(1) The Loop card shall be purchased only from the OEM. |
| 29 | Supply only inreplacement of Display card suitable for any unserviceable Fire alarm control panel Addressible/no addressible including testing complete all as specified and directed .Note :(1) The Loop card shall be purchased only from the OEM. |
| 30 | Supply only inreplacement of Digital display suitable for any unserviceable Fire alarm control panel Addressible/no addressible including testing complete all as specified and directed .Note :(1) The Loop card shall be purchased only from the OEM. |
| 31 | Attending complaints and the rectification of buzzing False alarm of any type fire alarm control panel by checking the control panel,removing the unwanted dust partcles inside the panel ,checking the complete wiring or each detector hanging on the false ceiling or inside the false ceiling panel or checking theMCP or fire alarm soundner and cleaning the smoke /dust particle on the smoke / heat type detector with the dry cloth or with the dust removing spray,programming,Software installation,Restting the complete fire alarm panel including testing the panel infront of user/JE/Engr-in-Chargecomplete all as specified and directed. Note :(1) The contractor shall arrange the technician only from the OEM team and the prior approval shall be obtained from the JE/Engr-in-Charge/. (2) The false alarm shall be rectified within 24 hrs by the contractor or the penalty charge Rs 750 /day shall be applied to the contractor (3) Rectification of buzzing false alarm for one Fire alarm panel measured as one Job only. |
| 32 | M&L inreplacement of Fire alarm system control wiring above/below the false ceiling using three singlecore PVC insulated, sheathed stranded copper conductor FRLSH cable of size 1.5 Sqmm 1100 Volts drawn in and including MS conduit (Medium grade ISI marked) of dia not less than 20mm with standard accessories complete all as specified and directed . Note: (1) Two run of copper cable will be measured in one single length. |
| 33 | All as per above item no 32 but wiring in the existing conduit complete all as specified and as directed |
| 34 | supply only in replacement of maintenance free fire alarm control panel battery of 12 volts 7 AHcapacity and connecting and testing at site complete all as specified and directed. |
| 35 | Supply & fixing, in repair includingtesting and commissioning of Fire alrm Control panel complying with BSEN54 addressable typetwo loop panel including controller card of capacity from 99 detector and 99 modules upto 200 detector and modules complete with battery12 volts 7 AH capacity (02 Nos ) all as specified and directed |
| 36 | Supply & fixing, in repair includingtesting and commissioning of Fire alrm Control panel non addressable type complying with BSEN54 non addressable two loop panel including controller card of capacity from 99 detector and 99 modules upto 200 detector and modules complete with battery12 volts 7 AH capacity (02 Nos ) all as specified and directed |
| 37 | Supply only in repair of addressable / conventional manual call point (MCP) surface mounting with glass cover complete all as specified and directed. |
| 38 | Supply & fixing, in replacement of Automatic fire detection and Fire Alarm System including Programming , Software installing ,Controll card, Motherboard card, Loop card , SLC , EOL, NAC ,Display card , Digital display installation ,12 V 7.2 AH Fire alarm panel battery - 02 Nos ,2Loop FAS with PA eqpt , 230V -1A-50 Hz, complete with all spares and equipments including testing and commissioning complete set all as specified and directed. |
| 39 | Supply & fixing, in replacement of Fire Alarm Repeater Panel including Programming , Software installing ,Controll card, Motherboard card, Loop card , SLC , EOL, NAC ,Display card , Digital display installation , complete with all spares and equipments including testing and commissioning complete set all as specified and directed. |
| 40 | Programming/re-loading of software for existing unserviceable fire alarm control panel conventional/addressable type to make it functional with the help of software to suit existing panel/model including testing of all connected circuits/detectors complete all as specified and directed. |
| 41 | Supply only in replacement smoke/heat Detectors Complying with and type certified to EN - 45 Addressable/ Non addressable typedetector Photoelectric /Optical with base with self built intelligence as per IS: 11360 |
| 42 | Supply only in replacement addressable type flame Detectors with UV / IR detection capacity complete all as specified and directed by Engr-in-charge. |
| 43 | Supply only in replacement fire alarm sounders/sirens electronic type horizontal single stage continuous normal operation for at least 50 minutes with sound level 65 DB to 120 DB measured at 1.5 meter with sound output variation of +5 DB for 1000 meter range |
| 44 | Supply only in replacement addressable electronic sounder cum strobe complete all as specified and directed. |
| 45 | Supply only in replcement addressable control module complete all as specifed and as directed |
| 46 | Supply only in replacement remote response indicators complete all as specified and directed. |
| 47 | Supply only switch mode power supply suitable for existing fire alarm control panel complete all as specified and directed. |
| 48 | Repair/Maint of following capacity fully automatic engine start system Fire Fighting Pump sets installed at ATC complete all as specifed and as directed by Engr-in-Charge. The Maintenance includes monthly preventive maintenance visits and unlimited breakdown calls during the Contract period. The Maint Shall include the following works and services.a) Cleaning, Oiling,Greasing, topping, calibration,repairs to Main Pump Electric driven, Jockey Pump electric drivenb) Inspection of Motor Control system with cleaning of all the switch gears and contactorsc) Inspection, testing of entire Hydrant System throughmaintenanceservice Centre having experience in Fire Fighting maintainance or any other agency as approved by GE,checking of complete pipe line and cleaning of the complete line by passing rod or SWR wire. (d) Replacement of spare parts will be measure seperate. (e) A register shall be maintained by the contractor for each visit and kept in record duly signed by user and JE/ Engr-in-Charge.The list of fire fighting eqipments installed is appended below.1.Motor driven main pump 45KW /60HP, 2500LPM 70M head-02 Nos and control valves2. Motor driven Jockey pump 15HP 2900RPM, 70M head-01 Nos and control valves3.Hydrant control panel and the connected items.The list of fire fighting eqipments installed is appended below.1. Motor driven main pump 75KW/100HP 1450RPM 70M head-01 Nos2.Motor driven Jockey pump 15 HP, 2900RPM 70M head-01 Nos3. Diesel driven std by pump 45KW/60HP 1800 RPM, 70M head-01 Nos4. Complete Hydrant System with UG MS Pipe, Fire Hydrants and Hose cabinetsNote for Item No 02 & 03 : The AMC of fire fighting system shall also include the following monthly checks1. Cleaning, Checking and operating all fire pumps. Checking noise, vibration and temperature of the pumps in their working state. 2. Cleaning, Checking electrical Control Panel (MCC) of the fire pumps.3. Checking of Engine Driven Starter Panel, Servicing of Fire Diesel pump At the interval of 06 Month4. Checking of Volt Meter; Amp meter; Starter etc.5. Checking of batteries, fan belt, temperature gauge, Fuel gauge etc. of diesel generator fire pump. 6. Greasing of pump shafts7. Overhauling of all Pumps if required8. Cleaning of all pumps and its accessories.9.Checking & servicing of Strainers, Gate / Butterfly Valves, Non return Valves, Air Vessel, Pressure Gauges, Pressure Switches and other related accessories therein.10. Checking of Diesel Tank flow pipe condition, Display pipe condition.(11)A register shall be maintained by the contractor for each visit and kept in record duly signed by user and JE/ Engr-in-Charge. |
| 49 | Repair/ Maintenance for following capacity fully automatic engine start system Fire Fighting Pump sets installed at Nano Hangar complete all as specifed and as directed by Engr-in-Charge. The Maintenance includes monthly preventive maintenance visits and unlimited breakdown calls during the Contract period. The Maintenance Shall include the following works and services.a) Cleaning, Oiling,Greasing, topping, calibration,repairs to Main Pump Electric driven, Jockey Pump electric driven,diesel engine driven pumpb) Checking the tention in V Belt of any size of diesel engine,pipe with fittings, check the level of coolant in radiator, repairs to leakage in radiator etc. Gaskets & Oil seals,bushes, servicing of the water pump, adjustment of fuel firing, repair to self starter,c) Battery top up with Electrolite solution, arresting the oil leakage and topping up of engine oil, operator interface device OID display,replacement of U/S oil level tube provided on the fuel tank for checking of oil level. d) The tank has to be calibrated and level marked on the tank, cleaning of tank for dust and mud. e) Repair of wiring control panel of diesel engine by checking of condition of control wiring and tightning of screws etc as required at site. DGincluding repair/Replacement off toggle switch,f) Inspection of Motor Control system with cleaning of all the switch gears and contactorsg) Inspection, testing of entire Hydrant System through maintenanceservice Centre having experience in Fire Fighting maintainance or any other agency as approved by GE. |
| 50 | Repair/Maint of following capacity engine start system Fire Fighting Pump sets installed at DWR complete all as specifed and as directed by Engr-in-Charge. The repair/maintenance cost includes 01 preventive maintenance visits and unlimited breakdown calls during the Contract period. The Maintenance Shall include the following works and services.a) Cleaning, Oiling,Greasing, topping, calibration,repairs to Main Pump Electric driven, Jockey Pump electric driven,diesel engine driven pumpb) Checking the tention in V Belt of any size of diesel engine,pipe with fittings, check the level of coolant in radiator, repairs to leakage in radiator etc. Gaskets & Oil seals,bushes, servicing of the water pump, adjustment of fuel firing, repair to self starter,c) Battery top up with Electrolite solution, arresting the oil leakage and topping up of engine oil, operator interface device OID display,replacement of U/S oil level tube provided on the fuel tank for checking of oil level, cleaning of fuel tank etc. d) The tank has to be calibrated and level marked on the tank, cleaning of tank for dust and mud. e) Repair of wiring control panel of diesel engine by checking of condition of control wiring and tightning of screws etc as required at site. including repair/Replacement off toggle switch,f) Inspection of Motor Control system with cleaning of all the switch gears and contactorsg) Inspection, testing of entire Hydrant System, throughmaintenanceservice Centre having experience in Fire Fighting maintainance or any other agency as approved by GE,checking of complete pipe line and cleaning of the complete line by passing rod or SWR wire. (h) Replacement of spare parts will be measure seperate.(i)A register shall be maintained by the contractor for each visit and kept in record duly signed by user and JE/ Engr-in-Charge. The list of fire fighting eqipments installed is appended below. 1.Motor driven main pump 60 HP 1415RPM 17M Head -kirloskar Make 01 Nos2. Motor driven Jockey pump 15 HP 2900 RPM 17M head -01 Nos3. Diesel driven std by pump 68 HP 1620LPM 1500RPM 88M head o kirloskar make 01 Nos4. Complete Hydrant System with UG MS Pipe ,02 Nos Fire Hydrants and 04 Nos Hose cabinets & Hose reel drum. |
| 51 | Disconnecting, dismantling and taking down unserviceable burnt jockey pump electric motor15 HP capacity 3 phase for repairs, strip opening for repairs, rewinding and varnishing the stator winding with suitable grade, varnish and drying etc, oiling, greasing the bearings etc and replacement of unserviceable bearings, re-metaling the bearing cover plate and reassembling and fixing the motor in position and testing complete all as specified and directed.Note :- Transportation to work shop and refixing the same at its position is deemned to be included in the quoted rate. |
| 52 | All as per above item No 51 but 100 HP capacity main pump complete all as specified and as directed |
| 53 | All as per above item No 51 but 60 HP capacity main pump complete all as specified and as directed |
| 54 | All as per above item No 51 but 68 HP diesel engine driven pump complete all as specified and as directed. |
| 55 | M&L in replacementof Sluice Valve PN 1.6 150 dia Complete all as specified and as directed |
| 56 | M&L in replacementof Sluice Valve PN 1.6 100 dia Complete all as specified and as directed |
| 57 | M&L in replacement of Non Return Valave 100 mm dia complete all as specified and as directed |
| 58 | M&L in replacement of Non Return Valave 150 mm dia complete all as specified and as directed |
| 59 | Supply only in replacement of Hose box made of 18 gauge MS Sheet 800mm X 600mm X 250mm with double door with 4 mm thick glasses and door frame made of 16 gauge MS sheet painted fire red out side and brilliant white inside yard complete all as specified and as directed |
| 60 | Supply only in replacement of hose reel with drum 30m complete all as specified and as directed |
| 61 | M& L in replacement of Yard hydrant Post / Stand Post 80mm Dia GI / MS both flanged type 1.5m Height Including necessary fittings complete all as specified and as directed |
| 62 | M&L in replacement of Single Hydrant Gun Matal 63mm Dia with Water Tigghtness test :-14kgf/cm2 and Hydrostatic Test :- 21kgf/cm2 and Flow test :90 LPM min at :7kgf/cm2 .LPMm |
| 63 | M& L in replacement of fire hydrant valve double headed complete all as specified and as directed |
| 64 | Supply only in replacement of RRL Hose pipe 63mm Dia 15mtr Gun Metal Male/Female Coupling with working pressure : 200 PSI Test Pressure: 300 PSI and Burst Pressure :500 PSI . |
| 65 | Supply only in replacement ofbrass hose reel nozle 63 mm dia complete all as specified and as directed |
| 66 | Supply only in replacement of battery charger for diesel engine fire pump complete all as specified and as directed |
| 67 | M&L in replacement of power contactor 3 Pole,415V, AC3 rating 125 Amps complete all as specified and directed. |
| 68 | M&L in replacement of power contactor 3 Pole,415V, AC3 rating 100 Amps complete all as specified and directed. |
| 69 | M& L in replacement of relay suitable for Jockey pump 15 HP capacity complete all as specified and as directed |
| 70 | M/L for Maintenance and servicing of Diesel engine Pump Set complete including draining out of diesel from tank , cleaningthe tank thoroughlyand refilling the drained out diesel, draining out engine oil from the sump, cleaningthe sump thoroughly and refilling the sump with new engine oil to it’s required level, replacing the fuel filter, lubricating oil filter , check & clean air cleaner, change air cleaner elements, check coolant level & make up the same ,drain the fuel filter & water separator ,filling the starting batteries with electrolyte/distilled water to maintain the required specific gravity, replace the u/s brass connectors for batteries, cleaning of battery terminals & applying petroleum jelly to battery terminal posts & brass connectors, including M&L for changing of V-belts, checking of exhaust leakage, governor, breathers etc, adjust/set the same for proper functioning of DG Set, checking offuel, oil and water/ coolantlevel etc, adjusting and keeping the fan belts to the desired tension, tightening all the bolts and nuts to the required torque etc, cleaning the diesel engine Set with accessories asprescribed by the manufacturer and test for satisfactory running of Diesel engine set for two hour at connected load and record shall be made in respect of RPM , oil pressure , oil temprature , coolent temprature, frequency , load current , battery charging , fuel consumption etc complete all as spicified and directed by Engineer in Charge for the capacity of 45 KW. Note : (1) cost of Spares ,Oil, Coolant ,Filters are included in the quoted rate. (2) Servicing shall only be carried out from authorised dealer only.Make -Kirloskar |
| 71 | M&L for the replacement of 2 mm thick glass for hose reel box 24\" x 12\"with proper fixing arrangements like rubber seal at the edges of glasses complete all as specified and directed. |
| 72 | M & L for preparation of old painted steel surfaces of any description over and applying two coats of synthetic enamel paint of approved colour for Fire Fighting stand post of 1.5m height,hose reel box,hose reel drum along with fire hydrant sluice/non return valve,pump set, Diesel engine for fire pumps including MS pipe line for complete hydrant system complete all as specified and directed. |
| 73 | Supply only N2gas cylinder seam less of capacity 2 kg or nearest higher size conferming to relevent ofIS with control , valves etc with N2 gas all as specified and directed . |
| 74 | Supply only high pressure brass ISI mark non return valve 20mm bore for manifold and discharge hose connection of approved make complete all as specified and directed. |
| 75 | Supply only solenoid valve 60Kg/cm2 pressure two way 15 mm dia (ISI mark) including all fitting complete all as specified and directed. |
| 76 | Supply only high pressure brass safety valve 25mm bore (ISI mark) with outlet pipe of approved make complete all as specified and directed. |
| 77 | M&L in replacement of Lead acid battery 12 v 100 AH complete all as specified and directed. |
| 78 | Supply only Butter Fly Valve 150 mm CI Lever operated pressure /Class /Rating PN-1.6, Water type Nitrile Rubber Lining SG Iron. |
| 79 | All as per item no. 78But butter fly valve 100 mm dia all as directed by Eng-in-Charge. |
| 80 | All as per item no.78But butter fly valve 80 mm dia all as directed by Eng-in-Charge. |
| 81 | Supply only in replacement of Carbon -Di-Oxide (CO2 ) Portable Fire Extinguisher capacity 4.5 Kg MS Seamless body ISI With Gun mattle Valve . High Pressure Horn type Hose pipe ,with Syphan ,95% Min Efficitive Discharge ,Operation valve Upright Wheel / Squeeze Grip type Including fixing of wall complete with suitable clamp with nuts, bolts and washers . |
| 82 | Suppy ABC type Powder Filled Fire Extinguisher capacity 4 kg IS 15683 ,85% Mon effective Discharge , 13 Sec Discharge Time ,35 kgf /cm2 Hydraulic tested Pressure .Including fixing of wall complete with suitable clamp with nuts, bolts and washers. |
| 83 | M& L in replacement of MS ERW Steel pipeincluding specials, welded joints/flanged nominal dia 150 mm as per IS 3589 (1981) thickness 4.8 mmwith bituminus coating complete all as specified and as directed. |
| 84 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. Or for shafts, wells, cesspits, manholes, pier holes, etc. N exc 10 sq m on plan and n exc 5 m in depth and getting out in soft/loose soil complete all as specified and as directed. |
| 85 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and as directed. |
| 86 | Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and as directed. |
| 87 | Carrying outMaintenance of fire fighting system CO2flood type of make Fire-bell (fire fighting system, installed at ETB and fire alarm system with connected control wiring & panel at AF Station Maharajpur Gwalior) all as directed in order to maintain the fire fightingplants in functional and serviceable conditions complete all as specified and directed.(Note:-(i) The entire system shall be inspected & checked comprehensively by a qualified technician at a interval ofevery months for preventive maintenance and unlimited breakdown calls as and when the requirement arises. The replaced parts, control wiring, gas charging, distilled water & acid shall be measured and paid for separately as ‘Supply/filling only’ except under respective item of this Schedule but fixing & testing etc is deemed to be included in the rate quoted against this item.The contractor shall attend the breakdown call within a period of 40 house otherwise a penlty of Rs 2500/- per day shall be deducted from the work done statement.(ii) All MS pipe line shall be inspected with respect to sefety purpose etc.(iii)Checking of the high pressure flexible hose pipes complete with connectors/adapters for CO2 connection to manifold as well as for pneumatic line between cylinders etc. (iv) Cleaning, oiling/greasing, servicing /overhauling of complete valves & fittings/assemblies. (v)Checking of the high pressure seamless cylinders of CO2 / N2for their weight etc. and refilling of gas if found 10% less than the gross weight.(vi)Cleaning, oiling/greasing, servicing /overhauling of complete valves pneumatic actuator / valve of CO2 cylinders & fittings/assemblies. (vii)Checking of Non return valve of manifold and discharge hose and Cleaning, oiling/greasing, servicing /overhauling of valves.(viii) Cleaning, oiling/greasing, servicing /overhauling of all the nozzles of CO2 cylinders. (ix) All the manual call points and electronic hooters to be checked for normal functioning.(x) Checking of pressure release valve and Cleaning, oiling/greasing, servicing /overhauling of valves.(xi)All main fire control panel including battery & filling of distilled water/acid, smoke detectors, temperature heat detectors, connected control wiring etc. to be checked for normal functioning.(xii) During six month period any parts replaced earlier or other part be come deffective, labour for replacement of parts shall be deemed to be included in quoted rates but items shall be paid separately accept item replaced earlier |
| 88 | M&L for Testing of Co2 system as per IS in the presence of the user and Engr-in-charge complete all as specied and as directed. |
| 89 | Material and labour for flushing out the complete pipe system from Co2 bank to gas nozzles with the adequate pressure of Nitrogen gas including taking out, opening and cleaning of nozzle complete all as specified and directed. |
| 90 | M&L including filling of CO2gas 22.5 Kg in existing empty high pressure seamless cylinders having 22.5 Kgs capacity after carrying to authorized filling station of CO2gas and fixing back to the plant complete all as specified and directed.Note: Cylinder shall be affixed with lamintated sticker of size not less than 100mmX75mm compresing details of cylinder i.e. Tare wt of cylinder, Nett wt. or filled gas & date. |
| 91 | Supply CO2 gas cylinder seam less of capacity 22.5 kg or nearest higher size conferming to relevent ofIS with control , valves etc duly filled with CO2 gas all as specified and directed. |
| 92 | M&L including filling of Nitrogen (N2) gas 2 Kg in high pressure seamless cylinders having 2 Kgs capacity after carrying to authorized filling station of N2gas and fixing back to the plant complete all as specified and directed. |
| 93 | Supply N2gas cylinder seam less of capacity 2 kg or nearest higher size conferming to relevent ofIS with control, valves etc with N2 gas all as specified and directed. |
| 94 | M & L for preparation of the old existing steel surfaces of 16 Nos CO2 Gas cylinder and applying two coats of synthetic enamel paint of approved colour complete all as specified and directed. |
| 95 | S&F in repair 80mm bore MS pipe class \"C\" heavy duty with Seemless welding/flanged joints including required MS fittings & testing complete all as specified and directed. Note: 1. Necessary excavation and return refilling will be measured and paid separately. 2. The cost of two coats of bituminous paint is deemed to be included in the quoted rate. |
| 96 | Supply only brass discharge nozzles cone type for CO2 cylinders of approved make complete all as specified nd directed. |
| 97 | Supply only high pressure flexible hose pipe10 Kg /cm2 withflexible hose pipe flexible connector for pneumatic line & cylinder of approved make complete all as specified and directed . |
| 98 | M& L in complete repair /servicing of oil cooled servo controlled voltage stabilizer by opening the complete system of capacity 400 KVA and replacement of unserviceable variable transformer or dimmer ,series transformer ,synchronising motor or servo motor - 03 Nos,electronic circuits, carbon bush and carbon bush holder ,servicing/ cleaning of cooling fins replacement of PCB-03 Nos,RC net work,limit switches ,pot for voltage setting including servicing,testing the complete oil cooled stabilizer complete all as specified and directed. Note : (1) Only transformer oil shall be measured seperately under relevent items.(2) The repair shall be carried out only by OEM team and the cost of spares above mentioned are included in the quoted rate.(3) Transportation charges included in the quoted rate. |
| 99 | All as per item no 98 above bt capacity 300 KVA |
| 100 | All as per item no 98 above bt capacity 200 KVA |
| 101 | All as per item no 98 above bt capacity 150 KVA |
| 102 | All as per item no 98 above bt capacity 75 KVA |
| 103 | All as per item no 98 above bt capacity 10/15 KVA |
| 104 | M& L in replacement of transformrer oil suitable for servo controlled oil cooled voltage stabilizer complete all as specified and directed. |
| 105 | M& L in complete repair /servicing of 3 Phase UPS System by opening the complete system of capacity 30 KVA with Suitable capacity batteries and replacement of unserviceable capacitor,Control Unit /Logic board, Fans/Cooling system, Transformer, Protective components such as fuses ,surge suppressors(MOVs) Filters,rectifier/charger,inverter,static bypass switch including servicing,testing the complete UPS System complete all as specified and directed. Note :(1) The repair shall be carried out only by OEM team and cost of spares above mentioned are included in the quoted rate.(2) Transportation charges included in the quoted rate |
| 106 | All as per item no 105 above bt capacity 15 KVA |
| 107 | All as per item no 105 above bt capacity 10 KVA |
| 108 | All as per item no 105 above bt capacity 5 KVA |
| 109 | Supply only sealed maintenance freebatteries 12 V 35 AH suitable forUPS system complete for its satisfactory operationNote: Unserviceable retrieved batteries shall be returned to E/M stores. |
| 110 | Supply only sealed maintenance free batteries 12 V 45 AH suitable for UPS system complete for its satisfactory operationNote: Unserviceable retrieved batteries shall be returned to E/M stores. |
| 111 | Supply only sealed maintenance freebatteries 12 V 65 AH suitable forUPS system complete for its satisfactory operationNote: Unserviceable retrieved batteries shall be returned to E/M stores. |
| 112 | M&L in replacement for Earthing complete with galvanized steel earth plate electrode60 cmx60 cm x6 mmthick buried directly in ground(earth pit not less than 2.25 meter deep below normal ground level) with top edge of the plate not less than 1.5 meter below normal ground level, connected to galvanizediron strip of 25 x 4mm as earth continuity conductor by means of bolts nuts, check nuts and washers of galvanised iron or steel all as shown in electric plate No 5, of SSRPart - I, 2009&all as specified, testing on completionincluding provision of earth lead protected by 40 mm dia GI pipe mediumgrade & watering pipe 20 mm mediumgrade including all excavation and earth workin any type of soil, PCC pit(1:3:6)type C1 with RCC cover, charcoal, salt, funnel etc complete including making good disturbed surfaces of wall, floor.Note :(i) The rate is inclusive ofcost ofearthing lead of 25 x 4mm and GI protection pipe 40mm size upto 7.5 m length from the top edge of the GI plate electrode.. (ii)Irrespective of what is shown onplate No 5 of SSR Part-I /2009, theearthing pit shall be precasted PCC (1:3:6) type C1 and the cover of earthing pit shall be of precast RCC (1 :2 : 4) type B1 with suitable handle fushed with surface all as specified. (iiii) The rates quoted by the contractor is deemed to be inclusive of cost of MS sheet of size 300mmX 300mmX3mm size, fixed with necessary nuts and boltson angle iron of size 40X40x5mm & length 60cm and grouted in the ground with PCC (1:3:6) using 20mm grade stone masonery of size 200mmX200mmX250mm including necessary earth work.for marking the result and its purpose of use. |
| 113 | M & L in replacement of pressure guage 4\"\" dial 0-14 Kgs rating including testing complete all as specified and directed. |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail