| 1 | Dismantling steel work in builtup sections( welded) upto span of 10 metres and height between ridge and floor level upto 5 metres in single sections including dismantling and stacking the materials within 20 metres lead as per the directions of Engineer-In-Charge.a) Channels, angles, tees and flats , gusset plates |
| 2 | Dismantling CGI sheet roofing including ridges, hips, valleys & gutters etc. , stacking the serviceable material and disposal of unserviceable material at dumping site ( To be arranged by the Contractor) as per satisfacation of Engineer -in- Charge through all modes of transportation including head load , animal load or mechnical meanswithin all leads and lifts. |
| 3 | Stone soling tightly hand packed under floors, including watering, ramming and consolidating complete and carriage of materials, labour ,tool and plants through all modes of transportation with in all leads and lifts, as per HP. PWD. specifications of 1990 volume-I including carriage of materials, labour, tool and plant through all modes of transportation within all leads and lifts and as per direction of Engineer-in- Charge.The rate including of octory, royalty, malkana,toll tax, sal tax or other taxes imposed by goverment. |
| 4 | Providing and laying mechanically mixed and vibrated cement concrete 1:4:8 (one cement isto four sand isto eight graded crushed stone aggregate 40mm (forty millimeter) nominal size) and curing complete, in or under water, including pumping or bailing out water/dewatering, removal of slush which may arise at the time of laying under water complete excluding the cost of form work in foundation and plinth in all depths/heights as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts. The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. |
| 5 | Providing and laying Second class Brick work in super structure above plinth level upto all floor level: Cement mortar 1:6 (1 cement : 6 Coarse sand) as per Specifications, approved drawings, designs and entire satisfaction and directions of the Engineer-in-charge including carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government . |
| 6 | Steel work welded in built up sections/hollow sections etc. framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works as required as per HP.PWD., Specifications includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per approved drawing, design and as directed by the Engineer-in-Chargeas per HP.PWD., Specifications includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government |
| 7 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete as per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. a) 600x600mm. |
| 8 | 15 (Fifteen) millimeters thick cement plaster in single coat on the rough side of brick/concrete/ stone walls for interior plastering up to all heights including arises. Internal rounded angles, chamfers and/or rounded angles not exceeding 80 (Eighty) millimeters in girth and finished even and smooth in cement mortar 1:6(One cement: Six sand)as per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 9 | Providing and fixing 0.60mm thick prepainted steel sheet of TATA Durashine in roofing with hot dipped metallic zinc coated sheet with top coat of regular modified polyster (RNP) organic coating of 20 microns over 5 microns primer coating + back coat of polyster of 5 microns over 5 microns primer coating i/c fixing with prepainted iron J or L hooks, bolts and nuts 6mm dia metre with prepainted limpet and rubber washers complete as per HP.PWD., Specifications of 1990 volume-I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. |
| 10 | Providing and fixing M.S. BP Sheet 2mm thick in eaves board/facia/soffits/ceiling including cutting, fixing and welding to steel roof members and applying a coat of red lead primer complete as per the instruction of Engineer-in-charge (Base members of steel work shall be measured & paid separtely) complete as per HP.PWD., specifications of 1990 volume-I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. |
| 11 | Providing and applying Birla white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.including carriage of materials with in all leads & lifts as per direction / satisfaction of the Engineer-in-charge. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 12 | Providing and applying Wall painting with two coats premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour, including carriage of materials with in all leads & lifts as per direction / satisfaction of the Engineer-in-charge. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 13 | Painting two costs (excluding priming cost on new steel and other metal surfaces with enamel paint white brushing to give an even shade including cleaning the surface of all dirt,dust and other foregin matter paint complete as per HP.PWD., Specifications of 1990 volume-I includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge.The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. Please Enable Macros to View BoQ information |