| 1 | Cleaning of thick jungle & throney bushes without uprooting. |
| 2 | E/W in cutting/filling in remodling of distributary by hydraulic excavator having capacity 25 Cum/Hr including all lead, lift, proper disposal, rough dressing & manual compaction all complete the work as per direction of Engineer-in-charge |
| 3 | Earth work by power transport for a lead of up to 1 km. including excavation, Loading, Unloading, manual compaction and dressing including all lifts, rates shall be applicable for lead beyond 630m and up to 1 km. |
| 4 | Daula dressing of Dys. in required shape & size etc. all complete the work as per direction of Engineer-in- charge. |
| 5 | Dry earth work in foundation of masonary work on channel of discharge below 10 cumecs including lead lead up to 30 M lift up to 1.50 M and its disposal and back filling. |
| 6 | Preparation and dressing the sub grade including removal of irregularities up to 7.5 cm in soil, morrum mixed with pebbles, small boulders and highly weathered rock for proper complition of work. |
| 7 | Supplying and laying of LDPE film of 200 micron a(IS 2508-1984) on Transverse sleepers and subgrade including jointing of LDPE film as per specifications including all leads , lifts and cost of all construction material, jointing etc. complete in all respects. |
| 8 | P/L C.C 1:3:6 in Foundation with cement coarse sand and stone aggrigate 25 mm to 40 mm nominal size i/c all material labour T&P etc. Required for proper complition of work as per direction of Engineer-in-charge |
| 9 | P/L Cement concrete (1: 2 :4) M-15 with 4.75mm to 20 mm well graded stone aggregate well mixed and laid in position complete including cost of all material lead & lift, curing and labour & T&P for proper complition of work as per direction of Engineer-in-charge |
| 10 | Brick Work 1:4 in cement coarse sand mortar including curing and all material and T&P etc. required. |
| 11 | Cement pointing on 1:2 Cement and fine sand mortar including supply of material, labour and T&P. etc. all complete the work. As per direction of Engineer-in-charge. |
| 12 | Dismanteling reinforced cement concrete including stacking of dismantaled materials as directed by Engineer-In-Charge within a distance of 60m. |
| 13 | Dismanteling brick work or stone work in lime or cement mortar including stacking of materials as directed by Engineer-In-Charge within a distance of 60m. |
| 14 | R.C.C./C.C. work with cement, approved coarse sand 2cm. Gauge approved stone ballast in the proportion of 1:1.5:3 for slabs excluding supply of reinforcement and it\"s bending but including it\"s fixing and bending the same with 24 B.W.G. g. i. binding wire and including neccessary centering and shuttering etc. and also including supply of all materials labour and T&P etc. requred for proper completion of work. Binding wire cost being included in them. |
| 15 | TMT Steel or Iron in plain work such as reinforced Concrete or Reinforced Brick work (When not included in an over all rates) wrought to required shape as necessary including bending for proper compl. Of the work and including supply of all steel and wastages and overlapping and hooks. |
| 16 | Distempering with dry distemper of approved brand (two coat) over one priming coat of whiting on new surface after thoroughly brushing the surface free from dropping and other foreign matter including preparing the surface even and sand papered smooth including cost of all material labour, T&P etc. |
| 17 | Writing letter on Gauge &chainege above 50 mm size but below 80 mm size. |
| 18 | Supplying & fixing 8 mm thick iron plate (4.5” x 4.5”) size in inch with cutting & making required groove for proper fitting of bearing to complete the job. |
| 19 | Supplying & fixing bearing (no.- 16 or 21) to complete the job |
| 20 | Supplying & fixing of 40 mm size dia Spindal rod with making required Square thread on lathe machine to complete the job. |
| 21 | Supplying & fixing chuk nut (4” x 3”) to complete the job. |
| 22 | Supplying & fixing handle 40 mm dia G.I. pipe for operate the gate to complete the job. |
| 23 | Supplying & fixing grease for over whaling to complete the job. |
| 24 | Arrangement of Generator Set, welding machine, gas cutter & other required T&P with mechanic, Welder, labour for cutting of various parts of gate & refitting of gate parts, including loading & unloading to complete the job. |
| 25 | Painting two coat of synthetic enamel paint on old surface with superior quality approved make including cost of all material labour T&P etc. required for proper completion of work. |
| 26 | Making sub grade for preparation of bed with proper slope & dressing etc. all complete the work as per direction of Engineer-in-charge. |
| 27 | P/L fine sand in filter including cost of sand, labour and T&P etc. for completion of work. |
| 28 | P/L brick on Edge soiling with Ist class brick approved by Engineer-in-charge on perpared subgrade of service road joints filled with local earth i/c cost of all material labour and T&P etc. requied for proper complition of work Please Enable Macros to View BoQ information |