| 1 | Earth work in excavation of foundation in hard soil including dressing and leveling the bed and depositing the soil within 50 m initial lead and 1.5 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 m in depth and as per direction of the Engineer-in-charge. |
| 2 | Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour,labour cess, sundries, T&P required for the work etc. complete in all respect as per direction by the Engineer in charge. |
| 3 | Cement concrete of prop.(1:3:6) in foundation up to lowest bed level using crusher broken hard black granite metal of size 4cm down graded of approved quality from approved quarry as per approved design including hoisting,lowering,laying compacting concrete in layers not exceeding 6” thick, watering, curing for three weeks shuttering the exposed surfaces, finished smooth, providing grooves of beads where necessary including cost, conveyance, royalty, & taxes of all materials, with labour, T&P required for the work etc., complete in all respects including dewatering if required as per direction of Engineer-in-Charge. |
| 4 | RRSM in C.M.(1:6) in F&P including splay cutting circular moulding etc including cost,conveyance of all materials and labour etc. complete as per direction of EIC |
| 5 | RCC work in cc (1:1.5:3) using 20mm & down graded CBBHG chips including all cost, conveyance, taxes, royalties, watering & curing and labour with T&P as required for the work etc complete.(A) Foundation |
| 6 | (B)Columnsi) Ground floor |
| 7 | ii)Firest floor |
| 8 | iii) Second floor |
| 9 | (C) Plinth Beam |
| 10 | (D) Beami) Ground floor |
| 11 | ii)First floor |
| 12 | iii) Second floor |
| 13 | (E) Linteli) Ground floor |
| 14 | ii)Firest floor |
| 15 | (F)Roof Slabi) Ground floor |
| 16 | ii)First floor |
| 17 | iii) Second floor |
| 18 | (G) Chajjai) Ground floor |
| 19 | ii)Firest floor |
| 20 | Stair case i) Ground floor |
| 21 | ii)Firest floor |
| 22 | W.B.C.B.Brick masonary C.M.(1:6) in superstructure with splay cutting circular moulding etc including cost,conveyance of all material and labour etc complete as per the direction of EICi) Ground floor |
| 23 | ii)First floor |
| 24 | iii) Second floor |
| 25 | Cutting,bending,binding of MS rod and laying in position,including cost of binding wires,conveyance of all materials and labour etc.complete as per the direction of EICi) Ground floor |
| 26 | ii)First floor |
| 27 | iii) Second floor |
| 28 | 12mm thick cement plastering with cm (1:6) over brick work finished smooth after racking out joints deep including watering, curing.i) Ground floor |
| 29 | ii)First floor |
| 30 | iii) Second floor |
| 31 | 16mm thick cement plastering with cm (1:6) over brick work finished smooth after racking out joints deep including watering, curing.i) Ground floor |
| 32 | ii)First floor |
| 33 | iii) Second floor |
| 34 | 6mm thcik CP(1:4) over RCC work for ceiling plaster including cost,carriage of all materials and labour etc.complete.i) Ground floor |
| 35 | ii)First floor |
| 36 | iii) Second floor |
| 37 | Providing, fitting and fixing of vitrified colour printed series tiles in floors of size 600mmx600mm of approved make confirming to IS 13755 laid on 20 mm tich cement morter(1:4)i) Ground floor |
| 38 | ii)First floor |
| 39 | Providing, fitting and fixing Vitrified tile in floor of size 600x600 mm of approved make conforming to IS: 13755 laid on 20 mm thick cement mortar 1:4 (1 cement: 4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc required for the work all complete as per direction of Engineer-In-Charge (for New work only)i) Ground floor |
| 40 | ii)First floor |
| 41 | Supplying, fitting & fixing of ceramic tiles of minimum 16mm thick and above 0.10sqm of approved make in floors over 25 mm thick bed of cement mortar 1:1 jointed with slurry mixed with pigment to match the shades of the tiles etc. complete including cost of all materials, labour T&P etc. required for the work all complete as per direction of the Engineer-in-charge i) Ground floor |
| 42 | ii)First floor |
| 43 | Supplying, fitting & fixing of ceramic tiles of minimum 16mm thick and above 0.10sqm of approved make in dadoes,skirting and risers of steps laid on 12mm thick thick cement mortar 1:3 (1 cement: 3 course sand) jointed with slurry mixed with pigment to match the shades of the tiles etc. complete including cost of all materials, labour T&P etc. required for the work all complete as per direction of the Engineer-in-chargei) Ground floor |
| 44 | ii)First floor |
| 45 | Supplying fitting and fixing of Granite Tiles of minimun 16 mm thick and above 0.10 sqm of approved make in floors over 25mm thick bed of cement mortar 1:1 jointed with cement slurry mixed with pigments to match the shade of the tiles, including,rubbing and posishing etc. complete including cost conveyance, tqaxews and royalites of all materials labour tithe T&P complete in all respect i) Ground floor |
| 46 | ii)First floor |
| 47 | Supplying fitting and fixing of Granite Tiles of minimun 16 mm thick and above 0.10 sqm of approved make in dadoes, skirting and risers of steps laid on 12mm thick cemenent mortar 1:3 jointed with cement slurry mixed with pigments to match the shade of the tiles, including,rubbing and posishing etc. complete including cost conveyance, tqaxews and royalites of all materials labour tithe T&P complete in all respect i) Ground floor |
| 48 | ii)First floor |
| 49 | Supplying fitting and fixing of Chequered tiles in floors of approved made laid on 20 mm thick cement mortr (1:4) and filling joints with epoxy gout of approved quality including cost of all materials labour T&P etc complete in all respect |
| 50 | 20mm thcik CP(1:4) with net cement punning for skirting dadoes including cost,conveyance of all maerials and labour etc complete as per he direction of EIC. |
| 51 | 2.5cm thick Grading Concrete (1:2:2) over roof slab with 6.7mm & down grades size hard granite crusher broken chips on new work. |
| 52 | Mild Steel doors and windows incluing cost conveyance of all materials etxc complete as per the direction of the EIC |
| 53 | Fitting, fixing of door & windows including fixture & fittings etc as per the instruction of EIC |
| 54 | Supplying Fitting, fixing up fully glazed aluminium framed window (sliding type) made up aluminium section 9778 as window frame, section 4095, 4096 and 9777, 3994 as shutter frame with 5mm black glass as panel fitted with rubber beading including locking arrangement including all fitting incuding cost of all materials, all taxes, labour, T&P excluding cost of glass etc. complete as per direction of the Engineer-in-charge |
| 55 | Dressed seasoned sal wood work framed and fixed (wrought and put up) in frames of doors, windows & ventilabours |
| 56 | 30mm thick Flush Door with all labour, iron fittings and wooden hinged cleats etc. fitted and fixed complete in all respect including cost of all fitting materials etc complete.i- Ground Floor |
| 57 | ii- First Floor |
| 58 | iii- Second Floor |
| 59 | Supplying fitting and fixing of stainless steel of 304 grade In hand railingusing 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90 mtrs C/C and stainless square plpe bracing of size 32mm x 32mm x 2mm in 3 rows in staircase as per approved deslgn and specification, buffing, polishing etc with colst, conveyance, taxes of all materials, labour and T&P required for the work all complete In all respect |
| 60 | Prgviding fitting fixing of false ceiling with Aluminlum anodised T sectionNo.3215 with 2’0\" center to center, L section No.1705 on 4 walls to be fixed by means of steel screw and P.V.C. plug and the Aluminium grid 2\"0“x2’0\" with water proof Gypsum board suspended from ceiling includlng cost of all materials, labour T&P etc required for the work all complete as perdirectlon of the Engineer-in-charge |
| 61 | Finishing surface of walls wlth cement based wall putty (water based) ofapproved make and finlshed smooth and even surface la receive palntlng lnduding cost of scaffolding staging charges wlth cosl of all malerlals labour T & P etc. as per direction of Engineer -In -charge.i- Ground Floor |
| 62 | ii- First Floor |
| 63 | iii- Second Floor |
| 64 | Painting two coats with any approved colour of weather seal coat over a coat of Water Bound Wall cement Primer to out side surface of wall in Ground Floori- Ground Floor |
| 65 | ii- First Floor |
| 66 | iii- Second Floor |
| 67 | Wall painting two coat with approved Plastic Emulsion paint over a coat of Water Bound wall cement Primer on Plastered Surfacei- Ground Floor |
| 68 | ii- First Floor |
| 69 | iii- Second Floor |
| 70 | Paining twcoat with approved Enamel Paint on Steel surface over a coat of Red Oxide Primeri- Ground Floor |
| 71 | ii- First Floor |
| 72 | iii- Second Floor |
| 73 | Add 10% for E.I |
| 74 | Add 15 % of P.H |
| 75 | Add 2% for Q.C & Consultancy |
| 76 | Add 1 % for Contingency Please Enable Macros to View BoQ information |