| 1 | Dismantling of 2 Nos. DG set 75KVA Complete with batteries, exhaust pipes, cables, panel(inside canopy) from RSU Nangali/c dismantling of all cable, earthing & exhaust pipe connection etc. complete as reqd. |
| 2 | Dismantling of 3x8.75 TR Ductable AC units from RSU Nangali/c dismantling ofindoor & outdoor units, piping, cable tray, drain pipe and cable, connection etc. complete as reqd. |
| 3 | Dismantling of one 3x31.5 KVAAVR from RSU Nangali/c dismantling of all type cables, earthing connection etc. complete as reqd. |
| 4 | Dismantling of the following material from RSU Nangali/c dismantling of all types of cables/conduits, earthing connection etc. complete as reqd.: Capacitor Panel, AVR By Pass Panel, L T Panel, AC Panel,Fire Panel, wall fans, Fittings, Phase reversal, Change Over switches, Distribution Boards, Cable Trays, Cables, Celing/wall fans,Exhaust Fans, and Fire Detectors etc complete as required. |
| 5 | Loading & Unloading of DG sets with associate material i/c transportation from RSU Nangalto T.E. bldg. Janak puri by heavy labour, chain pulley/hydra etc as reqd. |
| 6 | Loading & Unloading of 3x8.75 TR Ductable AC units i/c indoor units & outdoor units, piping, cable tray and cable, etc. i/c transportation from RSU Nangalto T.E. bldg. Janak puri, by heavy labour,,chain pulley/hydra etc as reqd. |
| 7 | Loading & Unloadingof 3x31.5 KVAAVR with associated material etc.complete as reqd. i/c Transportation from RSU Nangal to T.E. bldg. Janak puri, by heavy labour, chain pulley/hydra etc as reqd. |
| 8 | Shifting of the following material from RSU Nangali/c loading of all types of cables/conduits, earthing connections, Capacitor Panel, AVR By Pass Panel, L T Panel, AC Panel,Fire Panel, wall fans, Fittings, Phase reversal, Change Over switches, Distribution Boards, Cable Trays, Cables, Celing/wall fans,Exhaust Fans, and Fire Detectors etc. unloading at Janak puri bldg., and location as per the directions of Engineer-in-charge. Note: 1) The agency has to prepare a detailed Inventory of all Items to be dismantled i/c quantity before dismantling and shifting to other site and submit it to the Engineer-in-charge for taking gate pass. 2) The agency is fully responsible for any misplaced/short material receipt from RSU site and suitable recovery will be made for any such item. 3) The cables will be rolled into loops and approximate length should be mentioned in inventory. 4) The dismantled items alongwith inventory will be handed over to Engineer-in-charge, after shifting the material at site. |