| 1 | DETAIL OF WORK |
| 2 | Dismentaling of G.C. sheet roofing /wall partition including staking with in 100 mtr. . |
| 3 | Earth work in digging foundation of pillers. |
| 4 | Centering and shuttering for CC work |
| 5 | CC 1:4:8 with brick ballast. |
| 6 | RCC 1:3:6 withstone grit |
| 7 | P/C/F of M.S bar 10 mm to 16 mm dia including cutting, bending, binding and placing with binding wire. |
| 8 | Supply of M.S Steel Tube 160 mm dia 7.1 mm thick for column including carriage, loading, unloading and stacking at site. |
| 9 | Supply of M.S Plate 12 mm thick for base plate etc. including carriage, loading, unloading and stacking at site. |
| 10 | Supply of M.S flate bar 50 mm, 05 mm thick for tie rod including carriage, loading, unloading and stacking at site. |
| 11 | Supply of M.S Rectangular pipes hollow section 80 mm x 40 mm, 05 mm thick for trusses for trushes including carriage, loading, unloading and stacking at site. |
| 12 | Supply of M.S Square Pipes Hollow Section 40 mm x 40 mm, 2.3 mm for purlins including carriage, loading, unloading and stacking at site. |
| 13 | Mild steel or Iron work ( Fabrication work) in Purlins, Rafters and pillers including drilling holes, fixing in position excluding supply of steel bolts and nuts, wastage but including labour and T&P etc. required for proper completion of work as per drawing. |
| 14 | Errection charges of fabricated structure i.e M.S Columns ans Purlins for shed weight of single not more than 250 Kg. |
| 15 | Supply and laying of Galvanized Iron roofing 24 S.W.G including cutting, punching and cost of washers, Rivets, bolts labours including T&P etc. for proper completion of work. (But excluding cost of Trushes, flat iron etc.) |
| 16 | Laying G.C Sheet (Old) Roofing including cutting, fixing and cost of bitumen cap, washer, Rivets, j-bolts and nuts etc. including within 100 mtr. |
| 17 | Painting of one coat red oxide primer and painting of two coat synthetic enamel black paints (Berjer/Asian/Branded make). Please Enable Macros to View BoQ information |