| 1 | SCHEDULE \"A\" |
| 2 | Taking down the defective reciprocating open type compressor of capacity50TR/ Make : blue Star Model : JS 43F-N50B.fromthe central type Air conditioning plant by disconnecting suction and discharge valves after pumping down the systemand other controls . Dismantling the compressor for overhauling, servicing, cleaning all the internal parts and Crank shaft, reconditioning, replacing of following parts main bearings (front 02 Nos and back 01 No), connecting rods 04 Nos, Piston pins 04 Nos, Suction read, discharge read, suction spring, discharge spring, piston rings, gasket sets, Thrust washer etc,Re- assemblingthe compressor in all respect , refixing the same in its original position &re connecting all disconnected linesincluding Pressure testing as per the OEM recommendation / Specification & commissioningfor proper function ofall instruments like pressure gauge , pressure switches , solenoid valve, expansion valve etc. Replace if required. as specified and as directed. (SM/MES No. 825/0032/09) |
| 3 | Note for item No 2.00:-(i) Unserviceable parts / accessories required other than listed above to be replaced will be measured and paid for under relevent Items as supply only. (ii). Unserviceable parts /accessorieslisted here-in-afterwill be repalced only after the approval of Engineer-in Charge . (iii) Labour charges for removing unserviceable parts / accesories and replacement with new oneshall be deemed to be included in the unit rate. (iv) Any minor spares / parts /accessories not covered in the Schedule \"A\" Partbut required for completion of job shall be provided by the contractor and the rate quoted shall be deemed to have been inclusive of such items. (v) Leak test, gas & oil charging shall be measured under relevent items., (vi) Renewal of control wiring in the system/panel,deemed to be included in quoted rate, copper cable will be measured under relevent Items. |
| 4 | Taking down the defective 50 HP motor startor and the burned copper old winding from reciprocating open type compressor of the central type Air conditioning plant of capacity 50 TRand rewinding with copper double winding as per the original winding Re- assemblingthe motor startor and compressor in all respect , refixing the same in its original position &re connecting all disconneted lines as specified and as directed by Engr-in-ChargeNote :-(i).Unserviceable parts / accessories required to be replaced will be measured and paid for under relevent Items as supply only. (SM/MES No. 825/0032/09) |
| 5 | M & L tor carry out the leak test for finding out normal gas leakage or during any repair carried out in AC plant of followingcapacity cental AC plant by charging the dry nitrogen gas & hold up to 24 hrs and rectifying the leakage if any by bracing / welding / replacing the\"Ö\" ring etc andVacuumising complete system with double stage vaccum pump to pull minimum 500 micron vaccum pressure and charging the refrigerant Gas (R22 / R407C) upto desired pressure all as specified & directed. by Engineer-in-charge. Note :- (a) Once the Gas is charged, the system should hold the pressure for minimum three months. If any gas leak from the system, the contractor has to recharge the gas upto required levelfree of cost,No extra cost on this account shall be claimed.(b) compressor oil and refrigerant gas shall be measured and paid separately under relevant items as supply only. |
| 6 | Central typeAC plant of capacity50TR (Reciprocating Compressor 01 x 50 TR) |
| 7 | Central typeAC plant of capacity12.5TR (Scroll Type compressor 04 x 12.5TR) |
| 8 | Central typeAC plant of capacity of 12.5 TR (Scroll type compressor 01 x 12.5 TR) |
| 9 | M&L for Repair /Servicing of oil pump by removing the pump from respective compressor of capacity 50 TR, replacing the worn out / defective parts like bearing, shaft, impeller, gaskets, valves, gears etc assembling and refixing back to compressor, testing for satisfactory fuction complete all as specified and directed |
| 10 | M&L for Descaling the shell and tube condenser by circulating descaling chemical with water (ph value of circulating water should be 01) through cooling tower re-circulating pump set up to 2 to 3 hours and open the end cover of condenser and manually cleaning the inner tubes with nylon brush removal of complete scale and flushing with fresh water.Reconnecting the condenser end cover by replacing rubber gasket, bolts, nuts and including cleaning of cooling tower,make up water tank etcas required commissioning in all respect for the following:- (Note: (i) Descaling shall be done minimum once in every 3 months and will be measured accordigly.(ii) During descaling any damage to copper coil which leads leakage of gas, contractor shall be resposible for rectification to the damage and gas to be filled after leak test without any extra cost(iii) Descaling of one AC Plant unit include total Number of condensers / chillers in the mentioned capacity AC Plant |
| 11 | Descaling the Condenser of Central type AC plant of capacity50 TR (Reciprocating Compressor 01 x 50 TR) |
| 12 | Descaling the Condenser of Central type AC plant of capacity50 TR (Scroll type compressor 04 X 12.5TR) |
| 13 | All as per item No. 6 above but chiller of following capacity. |
| 14 | Descaling the chiller of Central type AC plant of capacity 50TR (Reciprocating Compressor 01 x 50 TR) |
| 15 | Descaling the chiller of Central type AC plant of capacity 50 TR (Scroll type compressor 04 X 12.5TR) |
| 16 | Descaling the chiller of Central type AC plant of capacity 12.5 TR (Scroll type compressor 01 X 12.5TR) |
| 17 | M&L for Dismantlingunserviceable Butterfly valves any type supply and fix new valve of following bore dia , butterfly type including replacement of bolts , nuts , washers and rubber gaskets all as directed. |
| 18 | Butterfly valve of size 150 mm dia |
| 19 | Butterfly valve of size 100 mm dia |
| 20 | Butterfly valve of size 80 mm dia |
| 21 | Butterfly valve of size 50 mm dia |
| 22 | S & F new NRV butterfly type of following size with replacement of bolts , nuts , washers and rubber gaskets including dismantling of old unserviceable NRV of following sizes all as directed. |
| 23 | NRV of size 150 mm dia |
| 24 | NRV of size 100 mm dia |
| 25 | NRV of size 80 mm dia |
| 26 | NRV of size 50 mm dia |
| 27 | Taking downexisting corroded MS pipe through gas cutting from condenser water / chiller water recirculatingpipe line and S & F including welding in its original position MS pipe medium grade of following dia including all special joints all as directed |
| 28 | MS Pipe of size 150 mm dia |
| 29 | MS Pipe of size 100 mm dia |
| 30 | MS Pipe of size 80 mm dia. |
| 31 | MS Pipe of size 50 mm dia. |
| 32 | M&L for Servicing and cleaning of water strainer/ NRV of size up to 150 mm with chemical for removing all dust particles, scales and unwanted materials all as directed |
| 33 | S & F MS flangeincluding Bolts ,Nuts, gasket etc and taking down old corroded of following sizes all as directed |
| 34 | MS Flange of size 150 mm dia |
| 35 | MS Flange of size 100 mm dia |
| 36 | MS Flange of size 80mm dia. |
| 37 | MS Flange of size 50 mm dia. |
| 38 | M&L for Dismantlingunserviceable water strainer any type, supply and fix new Water strainer of following size, both flanged \"U\" typeand suitable for existing location butterfly type , including replacement of bolts , nuts , washers and rubber gaskets all as directed |
| 39 | Water strainer of size 100 mm dia. |
| 40 | Water strainer of size 80 mm dia. |
| 41 | Water strainer of size 50 mm dia. |
| 42 | M&L for dismantling torn\"V\" belts any type / model ,supply and fix new \"V\" Belt of following size. |
| 43 | V- Belt of size C-127 |
| 44 | V- Belt of size C-122 |
| 45 | V- Belt of size A-82 |
| 46 | V- Belt of size A-57 |
| 47 | V- Belt of size B--93 |
| 48 | V- Belt of size B--74 |
| 49 | M&L for Taking down the Centrifugal pump set of following capacity ( condenser& Chilledwater re-circulating pump set) for servicing /overhauling by replacing Bush &bearings, gland packing, studs, gasketetc including machining work to shaft reassembling the pump set, painted with two coats of synthetic enamel paint including erecting testing and commissioning complete all as specified and directed. |
| 50 | Servicing /overhauling Centrifugal pump set of capacity 10 to 12HP, 3 phase, 415 volts. |
| 51 | Servicing /overhauling Centrifugal pump set of capacity 7.5 HP, 3 phase, 415 volts. |
| 52 | Servicing /overhauling Centrifugal pump set of capacity 3 to 5 HP, 3 phase, 415 volts. |
| 53 | M & L for taking down the unserviceable motor and dismantling includingtaking out damaged/burnt out winding from motor and rewinding with new super enamelled copper winding of following capacity all as directed. |
| 54 | Rewinding motor of capacity 3 to 5 HP. |
| 55 | Rewinding motor of capacity 7.5 HP. |
| 56 | Rewinding motor of capacity 10 to 12 HP. |
| 57 | M&L for maintenance and repairs / attending the complaint to the compressor unit of Central type AC plant of following capacity including fault finding and rectification including its calibration all as specified and directed.Note :- (i) Repair/ servicing work to be carried out only by service person of OEM or his authorised agency. (ii) After rectifying the complaint; same type of complaint within 1 week for the same unit shall not be paid (iii) Servicing / replacing of PCB / replacement of any other parts will be paid seperately under relavent items. |
| 58 | Attending the complaint to the compressor unit of Central AC plant of capacity 50 TR (Reciprocating compressor 01 X 50TR) |
| 59 | Attending the complaint to the compressor unit of Central AC plant of capacity 50 TR(Scroll type compressor 04 X 12.5TR) |
| 60 | Attending the complaint to the compressor unit of Central AC plant of capacity 12.5 TR (Scroll type compressor 01 X 12.5TR) |
| 61 | M&L for taking down unserviceable electrical contactors / relays /Starter / disconnectors/ Timer / fuse unit , any type /capacity / model from electrical control panels including supply and fixof following specifications all as specified and as directed :- |
| 62 | Contactor set for 3 Pole contactor AC3 with 1NO+1NC, 110 Amps. |
| 63 | Contactor Set for 3 pole contactor AC3 with 1NO+1NC ,70 Amps. |
| 64 | Contactor Set for 3 pole contactor AC3 with 1NO+1NC 63 Amps. |
| 65 | Contactor Set for 3 pole contactor AC3 with 1NO+1NC, 32 Amps. |
| 66 | Contactor Set for 3 pole contactor AC3 with 1NO+1NC, 16 Amps |
| 67 | Over load relay (direct mounting) of Range 13.2-20Amps |
| 68 | Star Delta Starter of capacity 10 to 12 HP |
| 69 | Star Delta Starter of capacity 7.5 HP |
| 70 | DOL Delta Starter of capacity 3 to 5 HP |
| 71 | Switch fuse unit of capacity 125 A 4 pole with HRC fuses. |
| 72 | Taking downexisting unserviceable MCCB from the panel, Supply and fix new MCCB, adjustable thermal magnetic type of following capacity/specification ,415V, 50 Hz, with extended terminal & spreader link all as directed |
| 73 | MCCB 4 pole, 25 KA 40 Amp. |
| 74 | MCCB 4 pole, 25 KA 63 Amp. |
| 75 | MCCB 4 pole, 25 KA 125 Amp. |
| 76 | MCCB 4 pole, 35 KA, 250 Amp |
| 77 | MCCB 4 pole, 35 KA, 400 Amp |
| 78 | M&L for dismantling and removing the unserviceable thrust bearings from the Air handling Units of the central type A/C plantsand repalcing with new Thrust bearing of same type / model ,assembling back , reinstalling, connecting and testing complete all as specified anddirected. |
| 79 | M&L for Servicing of following Air Handling Units ( AHU\"s )with humidification pumps of central type A/C by cleaning air filters , fire dampers , blowers , spray nozzles , condensate water tray , greasing of blower bearing / blower motor, tightening all bolts, nuts and testing for proper functioning all as specified and directed.Note :- AHU servicing shall be done once in every 2 months |
| 80 | Servicing of AHU with chiller water cooling coil with electric motor 12 HP and 15 HP |
| 81 | Servicing of AHU with chiller water cooling coil with electric motor 25 HP |
| 82 | Servicing of AHU with chiller water cooling coil with electric motor 10 HP |
| 83 | Supply & Replace the MS lov - joy (Male & Female) coupling of following size complete as per sample for condenser recirculating pump & chilled water pump all as directed. |
| 84 | MS lov - joy (Male & Female) coupling of size up to 100 mm |
| 85 | MS lov - joy (Male & Female) coupling of size up to 110 mm to 150 mm |
| 86 | Supply & Replace the Star rubber disc for lov - joy of any size up to 150 mm coupling as per sample for condenser recirculating pump & chilled water pump all as directed. |
| 87 | Supply & Replace the MS-Rubber (Male & Female) coupling of following size complete as per sample for condenser recirculating pump & chilled water pump all as directed. |
| 88 | MS-Rubber love-joy (Male & Female) coupling of size up to 100 mm |
| 89 | MS-Rubber love-joy(Male & Female) coupling of size 110 mm to 150 mm |
| 90 | Supply and replace Pilot control valve same as existing make all as directed |
| 91 | Supply and fix Expansion valve for following capacity plant including removing of old Expansion valve all as directed. |
| 92 | Expansion valve for 50 TR Compressor of central AC plant. |
| 93 | Expansion valve for 12.5 TR scroll Compressor unit of central AC plant. |
| 94 | Supply only following spares for compressor for AC Plant all as directed. |
| 95 | Supply only gasket set of compressor 50 TR AC Plant |
| 96 | Supply only shaft seal assembly of compressor 50 TR Plant |
| 97 | Note:-Labour charge for fixing items/Spares in item No:27.01 and 27.02 above is deemed to be included in the quoted rate of item No:2 here-in-before. |
| 98 | Supply only Compressor oil (grade as per manufacturer\"s recommendation) |
| 99 | Supply only following Refrigerant gas for charging |
| 100 | Refrigerant gas R-22. |
| 101 | Refrigerant gas R-407C. |
| 102 | Note for item No. 28 and 29:-Labour charge is deemed to be included in the quoted rate of relevant repair items |
| 103 | Supply & Replace single phase preventer 415 V,3Ph all as directed. |
| 104 | Supply & Replace HP/LP pressure switchwith all connected accessories all as directed. |
| 105 | Supply & Replace Oil pressure cutout switch / Water pressure cutout switchwith all connected accessories all as directed. |
| 106 | Supply & Replace Water flow switchwith all connected accessories all as directed. |
| 107 | Supply & Replace of Nitrile rubber insulation with Aluminium cladding on Chiller pipe line of any size including removal of old damaged insulation all as directed. |
| 108 | Supply & replace Temperature sensor with wiring kit for water entering & leavingfrom condenser/ chiller A/C plant all as directed. |
| 109 | Supply and replacement of new Fan Blade full assembly from the existing cooling tower capacity up to 160 TR of the central type AC plantall as specified and as directed |
| 110 | Supply and replacement of new Hub for fixing Fan Blade assembly from the existing cooling tower capacity up to 160 TR of the central type AC plantall as specified and as directed |
| 111 | Supply and replacement of Sprinkler assembly from the existing cooling tower capacity up to 160 TR of the central type AC plantall as specified and as directed |
| 112 | Supply and replacement ofPVC Fills from the existing cooling tower capacity up to 160 TR of the central type AC plantall as specified and as directed |
| 113 | Supply and replacement ofPVC Branch Pipes & Drift Eliminators full set from the existing cooling tower capacity up to 160 TR of the central type AC plantall as specified and as directed |
| 114 | Supply and replacement ofPVC Mesh for cooling towercomplete all as specified and directed. |
| 115 | M&L for Servicing and cleaning of following coolingtowersof central type A/ C including taking down and cleaning of fills with water and refixing in original position and one coat of painting same as old colour and testing for proper functioning all as specified and as directed. Note :- (i) Servicing of cooling tower to be carried out twice in the entire contract period and Each job will be measured and paid separately.(ii) Spares required for replacement if any shall be measured and paid separately under relevant items as supply and fixing. |
| 116 | Servicing of Cooling tower of Central AC Plant of capacity 50 TR (Reciprocating compressor 01 x 50TR) |
| 117 | Servicing of Cooling tower of Central AC Plant of capacity 50 TR (Scroll type compressor 04 x12.5TR) |
| 118 | M&L for taking down the burntout / defectiveScroll type compressor 12.5 TR fromunit and replace the factory made new compressor, testing and commissioning complete all as specified and directed. Note:- (i) Leak test, Vacuuming&Refrigerant gas shall be measured separately under relavant items.(ii) compressor under 1 year warranty is contractor\"s responsiblility.(iii) Compressor company test report shall be submitted by contractor. |
| 119 | Supply & Replace Air release valvemade by brass suitable for up to 12.5 TR scroll type compressor circuit of central AC plant including taking down old U/s valve all as directed. |
| 120 | Supply & Replace Filter Drier/Strainer suitable for Central AC for the following capacity including taking down old unserviceable one all as directed. |
| 121 | Filter Drier / Strainer for 50 TR compressor of central AC Plant |
| 122 | Filter Drier / Strainer for 12.5 TR Scroll compressor unit of central AC Plant |
| 123 | Supply & Replace compound gauge made of stainless steel body all as directed. |
| 124 | Supply and replace Pressure gauge/Temperature guage made of stainless steel bodyall as directed. |
| 125 | M & L for Repair/ Service of Printed circuit board (PCB) in AC control board panel with all connected wires/ parts including removing, refixing testing satisfactory fuction of following capacity AC plant all as directed. |
| 126 | Central AC Plant of capacity 50 TR (Reciprocating compressor 01 x 50TR) |
| 127 | Central AC Plant of capacity 50 TR (Scroll type compressor 04 x12.5TR) |
| 128 | Central AC Plant of capacity 12.5 TR(Scroll type compressor 01 x12.5TR) |
| 129 | Supply & Replace Printed circuit board (PCB) with display and all connected items as per the existing type for the following capacity AC plant including full wiring, testing and commissioning all as directed. |
| 130 | Central AC Plant of capacity 50 TR (Reciprocating compressor 01 x 50TR) |
| 131 | Central AC Plant of capacity 50 TR (Scroll type compressor 04 x12.5TR) |
| 132 | Central AC Plant of capacity 12.5 TR(Scroll type compressor 01 x12.5TR) |
| 133 | Material & Labour for MS Pipe of any cleaning with wire brush and painting with one coat of metal primer and two coats of oil paintcomplete all as specified and directed. |
| 134 | M&L for Replacement of old GI duct with new air ducting factory made out of commercial grade GI sheet zinc coating 120 grade (22 Gauge), IS:277 and factory fabricated as per SMACNA-1995 standards and IS-655 all as directed. |
| 135 | M&L for Replacement of old insulation of duct by Nitrile rubber insulation of thickness 19 mm on GI duct including fixing insulation on GI duct all as directed. |
| 136 | M&L for fabrication MS Hand rails, supporting structure, etc fabricated from structural steel sections including nuts, bolts, washers,welding, bending cold or hot,drilling holes for bolts, in any shape or size as indicated or directed and inclusive of one primer coat, one under coat and one finishing coat of paint including embeding in concrete and screwing etc all as specified and as directed. |
| 137 | M&L for taking down the condenser water recirculating pumpset along with MS framefrom the existing foundation and fabricate new MS frame of same size including weldingand fixing and incl connecting inlet & Outlet , connections etc and necessary civil work for smooth funtioning |
| 138 | Schedule of credit amount brought back from Ser Page No.43- Rs. 32199.00 will be deducted from the above quoted amount to derive the contract sum.SIGNATURE OF CONTRACTOR |