| 1 | Earth work in excavation of foundation in hard soil with all lead and lift including levelling the bed of the foundation to the required width and depth and depositing the excavated earth away from works site etc.complete.as per specification and direction of the Engineer-in-charge. Ground Floor |
| 2 | Filling foundation and Plinth with sand well watered and rammed including cost carriage and royalty of sand etc.complete as per the specification and direction of the Engineer-in-charge.Ground Floor |
| 3 | Cement Concrete (1:4:8) using 40mm size C.B.H.G. chips including cost carriage royalty and taxes of all materials etc. complete as per specification and direction of the Engineer-in-charge.(Ground Floor) |
| 4 | Flyash Brick masonary in C.M (1:6) in foundation and plinth including cost, carriage royalty taxes all labour, T and P etc required for the work etc complete.as per specification an direction of the Engineer-in-charge.(Ground floor) (a) In Foundation and Plinth) |
| 5 | Flyash Brick masonary in C.M (1:6) in Superstructure including cost, carriage royalty taxes all labour, T and P etc required for the work etc complete.as per specification an direction of the Engineer-in-charge.(Ground floor)(b) In Superstructure Ground Floor |
| 6 | Flyash Brick masonary in C.M (1:6) in Superstructure including cost, carriage royalty taxes all labour, T and P etc required for the work etc complete.as per specification an direction of the Engineer-in-charge.(Ground floor)(b) In Superstructure First Floor |
| 7 | Flyash Brick masonary in C.M (1:6) in Superstructure including cost, carriage royalty taxes all labour, T and P etc required for the work etc complete.as per specification an direction of the Engineer-in-charge.(Ground floor)(b) In Superstructure Second Floor |
| 8 | 16mm thick cement plaster in C.M (1:6) for brick work including cost carriage royalty and curring etc.complete as per specification and direction of the Engineer-in-charge. Ground Floor |
| 9 | 16mm thick cement plaster in C.M (1:6) for brick work including cost carriage royalty and curring etc.complete as per specification and direction of the Engineer-in-charge. First Floor |
| 10 | 16mm thick cement plaster in C.M (1:6) for brick work including cost carriage royalty and curring etc.complete as per specification and direction of the Engineer-in-charge. Second Floor |
| 11 | 12mm thick cement plaster in C.M (1:6) for brick work including cost carriage royalty and curring etc.complete as per specification and direction of the Engineer-in-charge.Ground Floor |
| 12 | 12mm thick cement plaster in C.M (1:6) for brick work including cost carriage royalty and curring etc.complete as per specification and direction of the Engineer-in-charge.First Floor |
| 13 | 12mm thick cement plaster in C.M (1:6) for brick work including cost carriage royalty and curring etc.complete as per specification and direction of the Engineer-in-charge.Second Floor |
| 14 | Fixing antiskid tiles in floors treads of steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing etc complete including cost of tile as per specification and direction of the Engineer-in-charge. Ground Floor |
| 15 | Fixing antiskid tiles in floors treads of steps and landing on 25mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing etc complete including cost of tile as per specification and direction of the Engineer-in-charge. First Floor |
| 16 | Supplying, fitting and fixing antiskid tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tile as per specification and direction of the Engineer-in-charge. Ground Floor |
| 17 | Supplying, fitting and fixing antiskid tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tile as per specification and direction of the Engineer-in-charge. First Floor |
| 18 | R.C.C. M-20 using 20mm and down graded Chips of approved quality from approved quarry for RCC works including hoisting and laying with cost, conveyance and royalty of materials T and P articles required for the work etc. complete as per direction of the Engineer-in-Charge.a. Column Base |
| 19 | b. Column Sup/Beam Ground Floor |
| 20 | b. Column Sup/Beam First Floor |
| 21 | b. Column Sup/Beam Second Floor |
| 22 | c. Plinth band |
| 23 | d. Lintel Ground Floor |
| 24 | d. Lintel First Floor |
| 25 | d. Lintel Second Floor |
| 26 | e. Lintel bearing chajja Ground Floor |
| 27 | e. Lintel bearing chajja First Floor |
| 28 | e. Lintel bearing chajja Second Floor |
| 29 | f. Roof Slab Ground Floor |
| 30 | f. Roof Slab First Floor |
| 31 | f. Roof Slab Second Floor |
| 32 | g. Staircase Ground Floor |
| 33 | g. Staircase First Floor |
| 34 | Supplying, fitting and placing HYSD bar reinforcement for R.C.C work including cutting,bending,binding and tying grills and placing in position including cost of steel and binding wire etc.complete as per specification and direction of the Engineer-in-charge. Ground Floor |
| 35 | Supplying, fitting and placing HYSD bar reinforcement for R.C.C work including cutting,bending,binding and tying grills and placing in position including cost of steel and binding wire etc.complete as per specification and direction of the Engineer-in-charge. First Floor |
| 36 | Supplying, fitting and placing HYSD bar reinforcement for R.C.C work including cutting,bending,binding and tying grills and placing in position including cost of steel and binding wire etc.complete as per specification and direction of the Engineer-in-charge. Second Floor |
| 37 | Supplying, fitting, fixing of iron grill in doors, windows, ventilators including fitting, fixing etc. all complete. Ground Floor |
| 38 | Supplying, fitting, fixing of iron grill in doors, windows, ventilators including fitting, fixing etc. all complete. First Floor |
| 39 | Supplying, fitting, fixing of iron grill in doors, windows, ventilators including fitting, fixing etc. all complete. Second Floor |
| 40 | Painting two coats over a coat of priming with approved paint and primer on wood and iron work including cost of paint and primer etc complete as per specification and direction of the Engineer-in-charge.Ground Floor |
| 41 | Painting two coats over a coat of priming with approved paint and primer on wood and iron work including cost of paint and primer etc complete as per specification and direction of the First Floor |
| 42 | Painting two coats over a coat of priming with approved paint and primer on wood and iron work including cost of paint and primer etc complete as per specification and direction of the Engineer-in-charge.Second Floor |
| 43 | Supplying, fitting, fixing of PVC doors including fitting, fixing etc. all complete. Ground Floor |
| 44 | Supplying, fitting, fixing of PVC doors including fitting, fixing etc. all complete.First Floor |
| 45 | Finishing wall surface with Acrylic wall putty( water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, taxes, labour, T and P Ground Floor |
| 46 | Finishing wall surface with Acrylic wall putty( water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, taxes, labour, T and P First Floor |
| 47 | Finishing wall surface with Acrylic wall putty( water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, taxes, labour, T and P Second Floor |
| 48 | Painting two coats with weather coats of approved shade on old work to give an even shade including cost of paint etc. complete as per specification and direction of the EIC. Ground Floor |
| 49 | Painting two coats with weather coats of approved shade on old work to give an even shade including cost of paint etc. complete as per specification and direction of the EIC. First Floor |
| 50 | Painting two coats with weather coats of approved shade on old work to give an even shade including cost of paint etc. complete as per specification and direction of the EIC. Second Floor |
| 51 | Priming one coat with approved water bound wall cement primer to the plastered surface including cost of primer and all labour Tand P articles required for the wok etc.complete as per specification and direction of the Engineer-in-charge.Ground Floor |
| 52 | Priming one coat with approved water bound wall cement primer to the plastered surface including cost of primer and all labour Tand P articles required for the wok etc.complete as per specification and direction of the Engineer-in-charge.First Floor |
| 53 | Priming one coat with approved water bound wall cement primer to the plastered surface including cost of primer and all labour Tand P articles required for the wok etc.complete as per specification and direction of the Engineer-in-charge. Second Floor |
| 54 | Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90m C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T and P etc. required for the complete in all respect.Ground Floor |
| 55 | Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90m C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T and P etc. required for the complete in all respect.First Floor |
| 56 | Electrification Internal and External Ground Floor, First Floor, Second floor |
| 57 | PH and Sanitary Installation Internal and External Ground Floor, First Floor Please Enable Macros to View BoQ information |