Sales : +91-777 804 8217
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 02-12-2025 | Corrigendum 03 | Date | 04-12-2025 |
| 2 | 26-11-2025 | Corrigendum 02 | Other | 02-12-2025 |
| 3 | 26-11-2025 | Corrigendum 01 | Other | 02-12-2025 |
| Sl. No. | Item Description |
| 1 | C1 72.0 0.3 0.6 21.599999999999998 43.199999999999996 C2 2.0 0.3 0.5 0.6 1.0 C3 8.0 0.3 0.7 2.4 5.6 C4 2.0 0.3 0.8 0.6 1.6 C5 2.0 0.4 0.6 0.8 1.2 C6 17.0 0.3 0.4 5.1 6.800000000000001 31.1 59.400000000000006 90.5 100.0 0.3 0.6 18.0 Item No DSR code Details of items No No Length Breadth Height Quantity Unit External Deductions GROUND FLOOR MD 1.0 1.0 2.0 2.4 4.8 Toughened glass door D 1.0 1.2 2.25 2.6999999999999997 Al double swing D1 2.0 1.0 1.5 2.25 6.75 Al double swing D2 1.0 1.2 2.25 2.6999999999999997 Half glazed al door 45.0 D3 1.0 1.0 2.25 2.25 Half glazed al door D4 1.0 0.9 2.25 2.025 al door D5 1.0 0.8 2.1 1.6800000000000002 upvc door D6 1.0 0.9 2.25 2.025 al door 332.0 SD 1.0 1.5 2.25 3.375 ot sliding SD1 1.0 0.9 2.25 2.025 upvc sliding door LD 1.0 1.5 2.25 3.375 lead door LD1 1.0 0.9 2.25 2.025 lead door DD 3.0 1.0 0.6 1.8 3.2399999999999998 al louver duct door DD\" 1.0 0.9 1.5 1.35 al louver duct door FRD 1.0 1.5 2.25 3.375 fire rtaed door W 10.0 1.0 1.8 1.5 27.0 upvc sliding window W1 10.0 1.0 2.4 1.5 36.0 upvc sliding window W2 2.0 1.0 1.2 1.5 3.5999999999999996 upvc sliding window W3 1.0 1.0 0.9 1.5 1.35 upvc sliding window W4 1.0 2.4 0.75 1.7999999999999998 upvc sliding window V 9.0 1.0 0.9 0.6 4.859999999999999 upvc ventilator V1 4.0 1.0 0.6 0.6 1.44 upvc ventilator RS 1.0 1.0 2.5 2.25 5.625 rolling shutter FG 1.0 1.0 3.1 1.95 6.045 fixed glass FG1 1.0 1.8 1.5 2.7 fixed glass FG2 1.0 1.5 1.5 2.25 fixed glass FG3 1.0 2.35 1.5 3.5250000000000004 fixed glass SG 1.0 1.0 4.2 3.9 16.38 structural glazing VG 1.0 1.5 1.5 2.25 viewing glass FIRST FLOOR MD 0.0 1.0 2.0 2.4 0.0 Toughened glass door D 0.0 1.0 1.2 2.25 0.0 Al double swing D1 1.0 1.5 2.25 3.375 Al double swing D2 1.0 1.2 2.25 2.6999999999999997 Half glazed al door D3 1.0 1.0 1.0 2.25 2.25 Half glazed al door D4 1.0 0.9 2.25 2.025 al door D5 1.0 0.8 2.1 1.6800000000000002 upvc door D6 1.0 0.9 2.25 2.025 al door SD 1.0 1.5 2.25 3.375 ot sliding SD1 1.0 0.9 2.25 2.025 upvc sliding door LD 1.0 1.5 2.25 3.375 lead door LD1 1.0 0.9 2.25 2.025 lead door DD 2.0 1.0 0.6 1.8 2.16 al louver duct door DD\" 1.0 0.9 1.5 1.35 al louver duct door FRD 1.0 1.5 2.25 3.375 fire rtaed door W 11.0 1.0 1.8 1.5 29.700000000000003 upvc sliding window W1 9.0 1.0 2.4 1.5 32.4 upvc sliding window W2 3.0 1.0 1.2 1.5 5.3999999999999995 upvc sliding window W3 0.0 1.0 0.9 1.5 0.0 upvc sliding window W4 3.0 1.0 2.4 0.75 5.3999999999999995 upvc sliding window V 5.0 1.0 0.9 0.6 2.6999999999999997 upvc ventilator V1 4.0 1.0 0.6 0.6 1.44 upvc ventilator RS 0.0 1.0 2.5 2.25 0.0 rolling shutter FG 1.0 1.0 3.1 1.95 6.045 fixed glass FG1 1.0 1.8 1.5 2.7 fixed glass FG2 1.0 1.5 1.5 2.25 fixed glass FG3 1.0 1.0 2.35 1.5 3.5250000000000004 fixed glass SG 1.0 1.0 4.2 3.9 16.38 structural glazing VG 1.0 1.5 1.5 2.25 viewing glass SECOND FLOOR MD 1.0 2.0 2.4 4.8 Toughened glass door D 1.0 1.2 2.25 2.6999999999999997 Al double swing D1 1.0 1.5 2.25 3.375 Al double swing D2 1.0 1.2 2.25 2.6999999999999997 Half glazed al door D3 1.0 1.0 1.0 2.25 2.25 Half glazed al door D4 1.0 0.9 2.25 2.025 al door D5 1.0 0.8 2.1 1.6800000000000002 upvc door D6 1.0 0.9 2.25 2.025 al door SD 1.0 1.5 2.25 3.375 ot sliding SD1 1.0 0.9 2.25 2.025 upvc sliding door LD 1.0 1.5 2.25 3.375 lead door LD1 1.0 0.9 2.25 2.025 lead door DD 2.0 1.0 0.6 1.8 2.16 al louver duct door 46.0 DD\" 1.0 0.9 1.5 1.35 al louver duct door FRD 1.0 1.5 2.25 3.375 fire rtaed door W 15.0 1.0 1.8 1.5 40.5 upvc sliding window W1 7.0 1.0 2.4 1.5 25.200000000000003 upvc sliding window W2 2.0 1.0 1.2 1.5 3.5999999999999996 upvc sliding window W3 1.0 1.0 0.9 1.5 1.35 upvc sliding window W4 3.0 1.0 2.4 0.75 5.3999999999999995 upvc sliding window V 6.0 1.0 0.9 0.6 3.24 upvc ventilator V1 6.0 1.0 0.6 0.6 2.1599999999999997 upvc ventilator RS 1.0 2.5 2.25 5.625 rolling shutter FG 1.0 1.0 3.1 1.95 6.045 fixed glass FG1 1.0 1.8 1.5 2.7 fixed glass FG2 1.0 1.5 1.5 2.25 fixed glass FG3 1.0 1.0 2.35 1.5 3.5250000000000004 fixed glass SG 1.0 1.0 4.2 3.9 16.38 structural glazing VG 1.0 1.5 1.5 2.25 viewing glass THIRD FLOOR MD 1.0 2.0 2.4 4.8 Toughened glass door D 1.0 1.2 2.25 2.6999999999999997 Al double swing D1 1.0 1.0 1.5 2.25 3.375 Al double swing D2 2.0 1.0 1.2 2.25 5.3999999999999995 Half glazed al door D3 1.0 1.0 2.25 2.25 Half glazed al door D4 1.0 0.9 2.25 2.025 al door D5 1.0 0.8 2.1 1.6800000000000002 upvc door D6 1.0 0.9 2.25 2.025 al door SD 1.0 1.5 2.25 3.375 ot sliding SD1 1.0 0.9 2.25 2.025 upvc sliding door LD 1.0 1.5 2.25 3.375 lead door LD1 1.0 0.9 2.25 2.025 lead door DD 1.0 1.0 0.6 1.8 1.08 al louver duct door DD\" 1.0 0.9 1.5 1.35 al louver duct door FRD 1.0 1.5 2.25 3.375 fire rtaed door 28.0 W 7.0 1.0 1.8 1.5 18.9 upvc sliding window W1 9.0 1.0 2.4 1.5 32.4 upvc sliding window W2 2.0 1.0 1.2 1.5 3.5999999999999996 upvc sliding window W3 1.0 0.9 1.5 1.35 upvc sliding window W4 1.0 2.4 0.75 1.7999999999999998 upvc sliding window V 4.0 1.0 0.9 0.6 2.16 upvc ventilator V1 1.0 0.6 0.6 0.36 upvc ventilator RS 1.0 2.5 2.25 5.625 rolling shutter FG 1.0 1.0 3.1 1.95 6.045 fixed glass FG1 1.0 1.8 1.5 2.7 fixed glass FG2 1.0 1.5 1.5 2.25 fixed glass FG3 1.0 2.35 1.5 3.5250000000000004 fixed glass SG 1.0 1.0 4.2 3.9 16.38 structural glazing VG 1.0 1.5 1.5 2.25 viewing glass Internal Deductions GROUND FLOOR MD 1.0 2.0 2.4 4.8 Toughened glass door D 1.0 1.2 2.25 2.6999999999999997 Al double swing D1 4.0 1.0 1.5 2.25 13.5 Al double swing D2 8.0 1.0 1.2 2.25 21.599999999999998 Half glazed al door 45.0 D3 4.0 1.0 1.0 2.25 9.0 Half glazed al door D4 3.0 1.0 0.9 2.25 6.075 al door D5 16.0 1.0 0.8 2.1 26.880000000000003 upvc door D6 1.0 0.9 2.25 2.025 al door SD 2.0 1.0 1.5 2.25 6.75 ot sliding SD1 1.0 1.0 0.9 2.25 2.025 upvc sliding door LD 2.0 1.0 1.5 2.25 6.75 lead door LD1 4.0 1.0 0.9 2.25 8.1 lead door DD 3.0 1.0 0.6 1.8 3.2399999999999998 al louver duct door DD\" 2.0 1.0 0.9 1.5 2.7 al louver duct door FRD 2.0 1.0 1.5 2.25 6.75 fire rtaed door W 1.0 1.8 1.5 2.7 upvc sliding window W1 1.0 2.4 1.5 3.5999999999999996 upvc sliding window W2 1.0 1.2 1.5 1.7999999999999998 upvc sliding window W3 1.0 0.9 1.5 1.35 upvc sliding window W4 1.0 2.4 0.75 1.7999999999999998 upvc sliding window V 7.0 1.0 0.9 0.6 3.78 upvc ventilator 61.0 V1 1.0 0.6 0.6 0.36 upvc ventilator RS 1.0 2.5 2.25 5.625 rolling shutter FG 1.0 3.1 1.95 6.045 fixed glass FG1 1.0 1.8 1.5 2.7 fixed glass FG2 1.0 1.0 1.5 1.5 2.25 fixed glass FG3 1.0 2.35 1.5 3.5250000000000004 fixed glass SG 1.0 4.2 3.9 16.38 structural glazing VG 2.0 1.0 1.5 1.5 4.5 viewing glass FIRST FLOOR MD 1.0 2.0 2.4 4.8 Toughened glass door D 1.0 1.0 1.2 2.25 2.6999999999999997 Al double swing D1 1.0 1.0 1.5 2.25 3.375 Al double swing D2 16.0 1.0 1.2 2.25 43.199999999999996 Half glazed al door D3 7.0 1.0 1.0 2.25 15.75 Half glazed al door D4 3.0 1.0 0.9 2.25 6.075 al door D5 10.0 1.0 0.8 2.1 16.8 upvc door D6 1.0 1.0 0.9 2.25 2.025 al door SD 1.0 1.5 2.25 3.375 ot sliding SD1 1.0 0.9 2.25 2.025 upvc sliding door LD 1.0 1.5 2.25 3.375 lead door LD1 1.0 0.9 2.25 2.025 lead door DD 4.0 1.0 0.6 1.8 4.32 al louver duct door DD\" 2.0 1.0 0.9 1.5 2.7 al louver duct door 53.0 FRD 2.0 1.0 1.5 2.25 6.75 fire rtaed door W 1.0 1.8 1.5 2.7 upvc sliding window W1 1.0 2.4 1.5 3.5999999999999996 upvc sliding window W2 1.0 1.0 1.2 1.5 1.7999999999999998 upvc sliding window W3 1.0 0.9 1.5 1.35 upvc sliding window W4 1.0 2.4 0.75 1.7999999999999998 upvc sliding window V 5.0 1.0 0.9 0.6 2.6999999999999997 upvc ventilator V1 1.0 0.6 0.6 0.36 upvc ventilator RS 1.0 2.5 2.25 5.625 rolling shutter FG 1.0 3.1 1.95 6.045 fixed glass FG1 1.0 1.8 1.5 2.7 fixed glass FG2 1.0 1.5 1.5 2.25 fixed glass FG3 1.0 2.35 1.5 3.5250000000000004 fixed glass SG 1.0 4.2 3.9 16.38 structural glazing VG 1.0 1.5 1.5 2.25 viewing glass SECOND FLOOR MD 1.0 2.0 2.4 4.8 Toughened glass door D 1.0 1.2 2.25 2.6999999999999997 Al double swing D1 5.0 1.0 1.5 2.25 16.875 Al double swing D2 2.0 1.0 1.2 2.25 5.3999999999999995 Half glazed al door D3 4.0 1.0 1.0 2.25 9.0 Half glazed al door D4 3.0 1.0 0.9 2.25 6.075 al door D5 15.0 1.0 0.8 2.1 25.200000000000003 upvc door D6 1.0 0.9 2.25 2.025 al door SD 1.0 1.5 2.25 3.375 ot sliding SD1 1.0 0.9 2.25 2.025 upvc sliding door LD 1.0 1.5 2.25 3.375 lead door LD1 1.0 0.9 2.25 2.025 lead door DD 4.0 1.0 0.6 1.8 4.32 al louver duct door 41.0 DD\" 2.0 1.0 0.9 1.5 2.7 al louver duct door FRD 2.0 1.0 1.5 2.25 6.75 fire rtaed door W 1.0 1.8 1.5 2.7 upvc sliding window W1 1.0 2.4 1.5 3.5999999999999996 upvc sliding window W2 1.0 1.2 1.5 1.7999999999999998 upvc sliding window W3 1.0 0.9 1.5 1.35 upvc sliding window W4 1.0 2.4 0.75 1.7999999999999998 upvc sliding window V 1.0 1.0 0.9 0.6 0.54 upvc ventilator V1 1.0 0.6 0.6 0.36 upvc ventilator RS 1.0 2.5 2.25 5.625 rolling shutter FG 1.0 3.1 1.95 6.045 fixed glass FG1 4.0 1.0 1.8 1.5 10.8 fixed glass FG2 1.0 1.5 1.5 2.25 fixed glass FG3 1.0 2.35 1.5 3.5250000000000004 fixed glass SG 1.0 4.2 3.9 16.38 structural glazing VG 1.0 1.5 1.5 2.25 viewing glass THIRD FLOOR MD 1.0 2.0 2.4 4.8 Toughened glass door D 1.0 1.2 2.25 2.6999999999999997 Al double swing D1 2.0 1.0 1.5 2.25 6.75 Al double swing D2 3.0 1.0 1.2 2.25 8.1 Half glazed al door D3 1.0 1.0 2.25 2.25 Half glazed al door D4 2.0 1.0 0.9 2.25 4.05 al door D5 5.0 1.0 0.8 2.1 8.4 upvc door D6 1.0 0.9 2.25 2.025 al door SD 1.0 1.5 2.25 3.375 ot sliding SD1 1.0 0.9 2.25 2.025 upvc sliding door LD 1.0 1.5 2.25 3.375 lead door LD1 1.0 0.9 2.25 2.025 lead door DD 3.0 1.0 0.6 1.8 3.2399999999999998 al louver duct door DD\" 1.0 1.0 0.9 1.5 1.35 al louver duct door FRD 2.0 1.0 1.5 2.25 6.75 fire rtaed door W 1.0 1.8 1.5 2.7 upvc sliding window W1 1.0 2.4 1.5 3.5999999999999996 upvc sliding window W2 1.0 1.2 1.5 1.7999999999999998 upvc sliding window W3 1.0 0.9 1.5 1.35 upvc sliding window W4 1.0 2.4 0.75 1.7999999999999998 upvc sliding window V 1.0 0.9 0.6 0.54 upvc ventilator V1 1.0 0.6 0.6 0.36 upvc ventilator RS 1.0 2.5 2.25 5.625 rolling shutter FG 1.0 3.1 1.95 6.045 fixed glass FG1 1.0 1.8 1.5 2.7 fixed glass FG2 1.0 1.5 1.5 2.25 fixed glass FG3 1.0 2.35 1.5 3.5250000000000004 fixed glass SG 1.0 4.2 3.9 16.38 structural glazing VG 1.0 1.5 1.5 2.25 viewing glass JOINERIES TOTAL GROUND FLOOR MD 1.0 2.0 2.4 4.8 Toughened glass door D 0.0 1.2 2.25 0.0 Al double swing D1 6.0 1.5 2.25 20.25 Al double swing D2 8.0 1.2 2.25 21.599999999999998 Half glazed al door D3 4.0 1.0 2.25 9.0 Half glazed al door D4 3.0 0.9 2.25 6.075 al door D5 16.0 0.8 2.1 26.880000000000003 upvc door D6 0.0 0.9 2.25 0.0 al door SD 2.0 1.5 2.25 6.75 ot sliding SD1 1.0 0.9 2.25 2.025 upvc sliding door LD 2.0 1.5 2.25 6.75 lead door LD1 4.0 0.9 2.25 8.1 lead door DD 6.0 0.6 1.8 6.4799999999999995 al louver duct door DD\" 2.0 0.9 1.5 2.7 al louver duct door FRD 2.0 1.5 2.25 6.75 fire rtaed door W 10.0 1.8 1.5 27.0 upvc sliding window W1 10.0 2.4 1.5 36.0 upvc sliding window W2 2.0 1.2 1.5 3.5999999999999996 upvc sliding window W3 1.0 0.9 1.5 1.35 upvc sliding window W4 0.0 2.4 0.75 0.0 upvc sliding window V 16.0 0.9 0.6 8.64 upvc ventilator V1 4.0 0.6 0.6 1.44 upvc ventilator RS 1.0 2.5 2.25 5.625 rolling shutter FG 1.0 3.1 1.95 6.045 fixed glass FG1 0.0 1.8 1.5 0.0 fixed glass FG2 1.0 1.5 1.5 2.25 fixed glass FG3 0.0 2.35 1.5 0.0 fixed glass SG 1.0 4.2 3.9 16.38 structural glazing VG 2.0 1.5 1.5 4.5 viewing glass FIRST FLOOR 0.0 MD 0.0 2.0 2.4 0.0 Toughened glass door D 1.0 1.2 2.25 2.6999999999999997 Al double swing D1 1.0 1.5 2.25 3.375 Al double swing D2 16.0 1.2 2.25 43.199999999999996 Half glazed al door D3 8.0 1.0 2.25 18.0 Half glazed al door D4 3.0 0.9 2.25 6.075 al door D5 10.0 0.8 2.1 16.8 upvc door D6 1.0 0.9 2.25 2.025 al door SD 0.0 1.5 2.25 0.0 ot sliding SD1 0.0 0.9 2.25 0.0 upvc sliding door LD 0.0 1.5 2.25 0.0 lead door LD1 0.0 0.9 2.25 0.0 lead door DD 6.0 0.6 1.8 6.4799999999999995 al louver duct door DD\" 2.0 0.9 1.5 2.7 al louver duct door 40.0 FRD 2.0 1.5 2.25 6.75 fire rtaed door W 11.0 1.8 1.5 29.700000000000003 upvc sliding window W1 9.0 2.4 1.5 32.4 upvc sliding window W2 4.0 1.2 1.5 7.199999999999999 upvc sliding window W3 0.0 0.9 1.5 0.0 upvc sliding window W4 3.0 2.4 0.75 5.3999999999999995 upvc sliding window V 10.0 0.9 0.6 5.3999999999999995 upvc ventilator V1 4.0 0.6 0.6 1.44 upvc ventilator RS 0.0 2.5 2.25 0.0 rolling shutter FG 1.0 3.1 1.95 6.045 fixed glass FG1 0.0 1.8 1.5 0.0 fixed glass FG2 0.0 1.5 1.5 0.0 fixed glass FG3 1.0 2.35 1.5 3.5250000000000004 fixed glass SG 1.0 4.2 3.9 16.38 structural glazing VG 0.0 1.5 1.5 0.0 viewing glass SECOND FLOOR 0.0 MD 0.0 2.0 2.4 0.0 Toughened glass door D 0.0 1.2 2.25 0.0 Al double swing D1 5.0 1.5 2.25 16.875 Al double swing D2 2.0 1.2 2.25 5.3999999999999995 Half glazed al door D3 5.0 1.0 2.25 11.25 Half glazed al door D4 3.0 0.9 2.25 6.075 al door D5 15.0 0.8 2.1 25.200000000000003 upvc door D6 0.0 0.9 2.25 0.0 al door SD 0.0 1.5 2.25 0.0 ot sliding SD1 0.0 0.9 2.25 0.0 upvc sliding door LD 0.0 1.5 2.25 0.0 lead door LD1 0.0 0.9 2.25 0.0 lead door DD 6.0 0.6 1.8 6.4799999999999995 al louver duct door 46.0 DD\" 2.0 0.9 1.5 2.7 al louver duct door FRD 2.0 1.5 2.25 6.75 fire rtaed door W 15.0 1.8 1.5 40.5 upvc sliding window W1 7.0 2.4 1.5 25.200000000000003 upvc sliding window W2 2.0 1.2 1.5 3.5999999999999996 upvc sliding window W3 1.0 0.9 1.5 1.35 upvc sliding window W4 3.0 2.4 0.75 5.3999999999999995 upvc sliding window V 7.0 0.9 0.6 3.78 upvc ventilator V1 6.0 0.6 0.6 2.1599999999999997 upvc ventilator RS 0.0 2.5 2.25 0.0 rolling shutter FG 1.0 3.1 1.95 6.045 fixed glass FG1 4.0 1.8 1.5 10.8 fixed glass FG2 0.0 1.5 1.5 0.0 fixed glass FG3 1.0 2.35 1.5 3.5250000000000004 fixed glass SG 1.0 4.2 3.9 16.38 structural glazing VG 0.0 1.5 1.5 0.0 viewing glass THIRD FLOOR 0.0 MD 0.0 2.0 2.4 0.0 Toughened glass door D 0.0 1.2 2.25 0.0 Al double swing D1 3.0 1.5 2.25 10.125 Al double swing D2 5.0 1.2 2.25 13.5 Half glazed al door D3 0.0 1.0 2.25 0.0 Half glazed al door D4 2.0 0.9 2.25 4.05 al door D5 5.0 0.8 2.1 8.4 upvc door D6 0.0 0.9 2.25 0.0 al door SD 0.0 1.5 2.25 0.0 ot sliding SD1 0.0 0.9 2.25 0.0 upvc sliding door LD 0.0 1.5 2.25 0.0 lead door LD1 0.0 0.9 2.25 0.0 lead door DD 4.0 0.6 1.8 4.32 al louver duct door DD\" 1.0 0.9 1.5 1.35 al louver duct door FRD 2.0 1.5 2.25 6.75 fire rtaed door 28.0 W 7.0 1.8 1.5 18.9 upvc sliding window W1 9.0 2.4 1.5 32.4 upvc sliding window W2 2.0 1.2 1.5 3.5999999999999996 upvc sliding window W3 0.0 0.9 1.5 0.0 upvc sliding window W4 0.0 2.4 0.75 0.0 upvc sliding window V 4.0 0.9 0.6 2.16 upvc ventilator V1 0.0 0.6 0.6 0.0 upvc ventilator RS 0.0 2.5 2.25 0.0 rolling shutter FG 1.0 3.1 1.95 6.045 fixed glass FG1 0.0 1.8 1.5 0.0 fixed glass FG2 0.0 1.5 1.5 0.0 fixed glass FG3 0.0 2.35 1.5 0.0 fixed glass SG 1.0 4.2 3.9 16.38 structural glazing VG 0.0 1.5 1.5 0.0 viewing glass 334.0 DETAILED ESTIMATE - SERVICE BUILDING Item No DSR code Details of items No No Length Breadth Height Quantity Unit |
| 2 | 4.17 All round 1.0 1.0 47.22 0.75 35.415 TOTAL 35.415 Cum SAY 36.0 Cum |
| 3 | 4.1.8 PCC for Entrance ramp 1.0 1.0 3.0 1.2 0.1 0.36 Entrance ramp 1.0 1.0 3.0 1.2 0.3 1.08 Total 1.44 cum Say 2.0 cum |
| 4 | spec change 6.47 Outer wall 1.0 1.0 11.2 0.2 3.9 8.74 do 1.0 1.0 6.05 0.2 3.9 4.72 do 2.0 1.0 9.41 0.2 3.9 14.68 do 1.0 1.0 3.9 0.2 3.9 3.04 Deductions W -5.0 1.0 1.5 0.2 1.5 -2.25 W1 -2.0 1.0 1.2 0.2 1.5 -0.72 RS -1.0 1.0 3.0 0.2 3.0 -1.8 D -1.0 1.0 1.5 0.2 2.25 -0.68 D1 -1.0 1.0 1.2 0.2 2.25 -0.54 Total 25.19 cum Say 26.0 cum 6.37 Providing and laying autoclaved aerated cement blocks masonry with100 mm thick AAC blocks in super structure above plinth level up tofloor V level in cement mortar 1:4 (1 cement : 4 coarse sand ). The rateincludes providing and placing in position 2 Nos 6 mm dia M.S. bars atevery third course of masonry work. Parapet 1.0 1.0 42.0 0.1 0.45 1.89 Total 1.89 cum Say 2.0 cum 50.6.1.7 Solid block masonry using pre cast solid blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15 cm in : CM 1:6 ( 1 cement : 6 coarse sand ) etc complete Entrance Steps 1.0 1.0 3.2 0.6 0.15 0.288 do 1.0 1.0 3.2 0.3 0.15 0.144 TOTAL 0.43199999999999994 cum SAY 1.0 cum 9.48.2 Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to openings / wooden frames with rawl plugs screws etc. Window GROUND FLOOR 0.0 W 5.0 1.0 1.5 1.5 12.0 135.0 W1 2.0 1.0 1.2 1.5 12.0 43.199999999999996 TOTAL 178.2 SQM SAY 179.0 SQM 9.97 Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete : 9.97.2 250 X 10 mm GROUND FLOOR D 2.0 1.0 2.0 AL DD D1 1.0 1.0 1.0 AL DD TOTAL 3.0 EACH SAY 3.0 EACH 9.100.1 Providing and fixing aluminium handles, ISI marked, anodised (anodiccoating not less than grade AC 10 as per IS : 1868) transparent or dyedto required colour or shade, with necessary screws etc. complete : 125mm GROUND FLOOR D 1.0 4.0 4.0 AL DD D1 1.0 2.0 2.0 AL DD TOTAL 6.0 EACH 15000.0 SAY 6.0 EACH 90000.0 9.101.2 Providing and fixing aluminium hanging floor door stopper, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868) Transparent or dyed to required colour and shade, with necessary screws etc. complete. Twin rubber stopper GROUND FLOOR D 1.0 2.0 2.0 AL DD D1 1.0 1.0 1.0 AL DD TOTAL 3.0 EACH SAY 3.0 EACH 21.13 Providing and fixing 100mm brass locks (best make of approved quality) for aluminium doors including necessary cutting and making good etc. complete GROUND FLOOR D 1.0 1.0 1.0 AL DD D1 1.0 1.0 1.0 AL DD TOTAL 2.0 EACH SAY 2.0 EACH 9.147D.3 Two track two panels sliding window made of (big series) frame 67 x 50 mm & sash 46 x 62 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension . (Area of window above 1.75 sqm upto 2.50 sqm). W 5.0 1.0 1.5 1.5 11.25 W1 2.0 1.0 1.2 1.5 3.5999999999999996 TOTAL 14.85 cum SAY 16.0 cum 10.6.1 Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. 80x1.25 mm M.S. laths with 1.25 mm thick top cover GROUND FLOOR RS 1.0 1.0 3.0 3.0 9.0 RS TOTAL 9.0 sqm SAY 9.0 sqm 10.7 Providing and fixing ball bearing for rolling shutters. GROUND FLOOR RS 1.0 2.0 2.0 RS TOTAL 2.0 nos SAY 2.0 nos 10.9 Extra for providing grilled rolling shutters manufactured out of 8mm dia M.S Bar instead of laths as per design approved by Engineer in charge (area of grill to be measured) GROUND FLOOR RS 1.0 1.0 3.0 0.4 1.2000000000000002 RS TOTAL 1.2000000000000002 sqm SAY 2.0 sqm |
| 5 | 10.25.2 Channel drain Frame L angle 50x50x5mm (3.80 kg metre ) 4.0 1.0 11.0 3.8 167.2 Flat 25x5mm 1.0 220.0 0.45 1.0 99.0 TOTAL 266.2 KG SAY 267.0 KG 10.28 Providing and fixing stainless steel ( Grade 304) railing made of Hollowtubes, channels, plates etc., including welding, grinding, buffing, polishingand making curvature (wherever required) and fitting the same withnecessary stainless steel nuts and bolts complete, i/c fixing the railingwith necessary accessories & stainless steel dash fasteners , stainlesssteel bolts etc., of required size, on the top of the floor or the side ofwaist slab with suitable arrangement as per approval of Engineer-incharge,(for payment purpose only weight of stainless steel membersshall be considered excluding fixing accessories such as nuts, bolts,fasteners etc.). Staircase Handrail Newel post 50mm dia.2mm thick 4.0 1.0 1.2 2.4 kg/m 11.52 Hand rails 50mm dia 2mm thick 1.0 1.0 8.0 2.4 kg/m 19.2 Hand rails 25mm dia 2mm thick 2.0 1.0 8.0 1.3 kg/m 20.8 Balusters 25mm dia 2mm thick 1.0 66.0 1.2 1.3 kg/m 102.96000000000001 Stair closing Newel post 50mm dia.2mm thick 1.0 1.0 1.2 2.4 kg/m 2.88 Hand rails 50mm dia 2mm thick 1.0 1.0 2.7 2.4 kg/m 6.48 Hand rails 25mm dia 2mm thick 2.0 1.0 2.7 1.3 kg/m 7.0200000000000005 Balusters 25mm dia 2mm thick 1.0 10.8 1.2 1.3 kg/m 16.848000000000003 TOTAL 187.70800000000003 Kg SAY 188.0 Kg 13.1.1 12 mm cement plaster of mix: 1:4 (1 cement: 4 fine sand) Outer wall 1.0 1.0 42.0 4.35 182.7 Deductions 0.0 W -5.0 0.5 1.5 1.5 -5.625 W1 -2.0 0.5 1.2 1.5 -1.7999999999999998 RS -1.0 0.5 3.0 3.0 -4.5 D -1.0 0.5 1.5 2.25 -1.6875 D1 -1.0 0.5 1.2 2.25 -1.3499999999999999 TOTAL 167.73749999999998 sqm SAY 168.0 sqm 13.4.1 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) Inner wall 1.0 1.0 29.5 3.45 101.775 do 1.0 1.0 16.82 3.45 58.029 Deductions 0.0 W -5.0 0.5 1.5 1.5 -5.625 W1 -2.0 0.5 1.2 1.5 -1.7999999999999998 RS -1.0 0.5 3.0 3.0 -4.5 D -1.0 0.5 1.5 2.25 -1.6875 D1 -1.0 0.5 1.2 2.25 -1.3499999999999999 TOTAL 144.8415 sqm SAY 145.0 sqm 13.7.2 12 mm cement plaster finished with a floating coat of neat cement ofmix : 1:4 (1 cement: 4 fine sand) 460.0 GF floor 1.0 1.0 9.01 5.65 50.9065 Steps Tread 25.0 1.0 1.0 0.3 7.5 22.5 Riser 27.0 1.0 1.0 0.15 4.05 Landing 2.0 1.0 1.0 1.0 2.0 22500.0 Landing 1.0 1.0 3.5 1.6 5.6000000000000005 Entrance ramp 1.0 1.0 3.0 1.2 3.5999999999999996 TOTAL 73.6565 sqm SAY 74.0 sqm 13.16.1 6 mm cement plaster of mix : 1:3 (1 cement: 3 fine sand) GF 1.0 1.0 4.905 3.56 17.4618 do 1.0 1.0 9.01 5.65 50.9065 Waist slab 1.0 1.0 8.0 1.0 8.0 Landing 1.0 1.0 3.5 1.6 5.6000000000000005 do 2.0 1.0 1.0 1.0 2.0 Sides of waist slab 1.0 1.0 11.5 0.15 1.7249999999999999 Pump room 1.0 Sunshade 1.0 1.0 42.0 0.7 29.4 TOTAL 115.0933 sqm SAY 116.0 sqm 13.61.1 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work. GROUND FLOOR COEFF W 5.0 1.0 1.5 1.5 1.0 11.25 W1 2.0 1.0 1.2 1.5 1.0 3.5999999999999996 RS 1.0 2.0 3.0 3.0 1.1 19.8 Channel drain 2.0 1.0 11.0 0.45 1.0 9.9 TOTAL 34.65 SQM SAY 35.0 SQM 13.43.1 Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : 12 mm internal Plastering 1.0 1.0 168.0 168.0 6 mm Ceiling plastering 1.0 1.0 116.0 116.0 Deduct sunshade bottom (from 6mm) -1.0 1.0 42.0 0.7 -29.4 Total 254.6 Sqm Say 255.0 Sqm 13.46.1 Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied@ 2.20 kg/10 sqm) 12 mm external Plastering 1.0 1.0 168.0 168.0 Sunshade 1.0 1.0 42.0 0.7 29.4 Total 197.4 Sqm Say 198.0 Sqm 13.60.1 Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade: Two or more coats on new work. 12 mm internal Plastering 168.0 6 mm Ceiling plastering 116.0 Deduct sunshade bottom (from 6mm) -1.0 1.0 42.0 0.7 -29.4 Total 254.6 Sqm Say 255.0 Sqm 13.9.1+13.21 Cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement.12 mm cement plaster including providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers. Terrace water proofing 1.0 1.0 77.0 77.0 AREA Sunshade Top 1.0 1.0 42.0 0.7 29.4 Domestic Tank Floor 0.0 Walls 0.0 Fire water Tank Floor 0.0 Walls 0.0 Fire water Tank Floor 0.0 Walls 0.0 Flushing water Tank Floor 0.0 Walls 0.0 Floor 0.0 Walls 0.0 TOTAL 106.4 sqm SAY 107.0 sqm 21.1.1.2 Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps atjunctions, i.e. at top, bottom and sides with required EPDM rubber/neoprene gasket etc. Aluminium sections shall be smooth, rustfree, straight, mitred and jointed mechanically wherever requiredincluding cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architecturaldrawings and the directions of Engineer-in-charge. (Glazing, panelingand dash fasteners to be paid for separately) : GROUND FLOOR 0.0 D 1.0 1.0 1.5 2.25 6.0 20.25 AL DD D1 1.0 1.0 1.2 2.25 6.0 16.2 AL DD TOTAL 36.45 KG SAY 37.0 KG 21.1.2.2 For shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber / neoprene gasket required (Fittings shall be paid for separately) Powder coated aluminium (minimum thicknessof powder coating 50 micron) GROUND FLOOR D 1.0 1.0 1.5 2.25 5.0 16.875 AL DD D1 1.0 1.0 1.2 2.25 5.0 13.499999999999998 AL DD TOTAL 30.375 KG SAY 31.0 KG 21.2.2 Providing and fixing 12mm thick prelaminated particle board flat pressed three layer or graded wood particle board conforming to IS: 12823 Grade l Type ll, in panelling fixed in aluminum doors, windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and directions of engineer-in-charge. Pre-laminated particle board with decorative lamination on both sides. GROUND FLOOR D 1.0 1.0 1.5 1.125 1.6875 AL DD D1 1.0 1.0 1.2 1.125 1.3499999999999999 AL DD TOTAL 3.0374999999999996 SQM SAY 4.0 SQM 21.3.2 Analysis 21.3.2 With float glass panes of 6 mm thickness (weight not less than 12.50 kg/sqm) Window GROUND FLOOR 0.0 W 5.0 1.0 1.5 1.5 11.25 W1 2.0 1.0 1.2 1.5 3.5999999999999996 TOTAL 14.85 SQM SAY 15.0 SQM 21.3.3 With float glass panes of 8 mm thickness GROUND FLOOR D 1.0 1.0 1.5 1.125 1.6875 AL DD D1 1.0 1.0 1.2 1.125 1.3499999999999999 AL DD TOTAL 3.0374999999999996 SQM SAY 4.0 SQM |
| 6 | 19.18.2 Analysis Total 0.0 Say 0.0 nos |
| 7 | 19.16 Total 0.0 Say 0.0 nos |
| 8 | 2.6.1 Rain water collecting tank 1.0 1.0 6.16 5.66 3.8000000000000003 132.48928 TOTAL 132.48928 cum 2.3 SAY 133.0 cum |
| 9 | 2.26.1 a 2.26.1 1.50m to 3.0m 1.5+1.5 Rain water collecting tank 1.0 1.0 6.16 5.66 1.5 52.2984 TOTAL 52.2984 cum SAY 53.0 cum |
| 10 | 2.26.1 a 2.26.1 3m to 4.5m 1.5+1.5 Rain water collecting tank 1.0 1.0 6.16 5.66 0.8 27.892480000000003 TOTAL 27.892480000000003 cum SAY 28.0 cum |
| 11 | 4.1.8 Rain water collecting tank 1.0 1.0 4.66 4.16 0.1 1.93856 TOTAL 1.93856 cum SAY 2.0 cum 5.9 Centering and shuttering including strutting, propping etc. and removal of form for : |
| 12 | 5.9.1 PCC - Rain water collecting tank 1.0 1.0 17.64 0.1 1.7640000000000002 4.36 3.86 RCC - Rain water collecting tank-BASE SLAB 1.0 1.0 16.84 0.45 7.578 TOTAL 9.342 SQM SAY 10.0 SQM |
| 13 | 5.9.2 Rain water collecting tank-RC Wall-OUTER 1.0 1.0 15.64 3.25 50.83 4.36 3.86 Rain water collecting tank-RC Wall-INSIDE 1.0 1.0 14.44 3.0 43.32 TOTAL 94.15 SQM SAY 95.0 SQM |
| 14 | 5.9.3 RCC - Rain water collecting tank-TOP SLAB 1.0 1.0 4.46 3.96 17.6616 TOTAL 17.6616 SQM SAY 18.0 SQM |
| 15 | 5.9.5 RCC - Rain water collecting tank-beam 200x400 1.0 1.0 3.0 0.5 1.5 TOTAL 1.5 SQM SAY 2.0 SQM |
| 16 | 5.22.6 Slab 1.0 1.0 12.36312 Wall 1.0 1.0 19.1 Beam 1.0 1.0 0.3 TOTAL 0.0 kg SAY 0.0 kg |
| 17 | 5.37.2 Rain water collecting tank-Base slab 1.0 1.0 4.46 3.96 0.45 7.94772 Rain water collecting tank-RC Wall 2.0 1.0 4.16 0.33 3.0 8.2368 3.7 10.15872 Rain water collecting tank-RC Wall 2.0 1.0 3.66 0.33 3.0 7.246800000000001 3.7 8.937720000000002 Rain water collecting tank-Top slab 1.0 1.0 4.46 3.96 0.25 4.4154 Rain water collecting tank-beam 200x400 1.0 1.0 3.0 0.2 0.15000000000000002 0.09000000000000002 3.66 0.2 0.4 0.29280000000000006 TOTAL 27.936719999999998 cum SAY 28.0 cum Analysis 19.18.3 Supplying and fixing C.I. cover with frame for manholes : 560 mm diameter C.I. cover with frame (heavy duty) the weight of the cover to be not less than 108 kg tank 1.0 1.0 1.0 5.333333333333334 Total 1.0 Say 1.0 nos |
| 18 | 19.16 tank 1.0 10.0 10.0 5.333333333333334 Total 10.0 Say 10.0 nos |
| 19 | 10.16.1 DG roof truss CHS 114.3X3.6mm 8.0 1.0 4.05 9.75 315.9 Purlin 80x40x3.2mm 5.0 1.0 6.2 5.5 170.5 Truss 4nos Purlin 80x40x4mm 4.0 2.0 3.4 6.71 182.512 0.2025 Vertical strut 50x25x2mm 4.0 9.0 0.3 2.15 23.219999999999995 0.09 7.555555555555555 Inclined strut 50x25x2mm 4.0 8.0 0.55 2.15 37.84 0.5408326913195983 Base plate 200x200x6mm 8.0 1.0 0.2 0.2 47.1 15.072000000000003 Add 5% for fittings 0.05 1.0 745.0440000000001 37.25220000000001 TOTAL 782.2962000000001 Kg 0.04000000000000001 10.15 SAY 783.0 Kg |
| 20 | 12.5 DG ROOF SHEET 1.0 1.0 7.4 4.6 34.04 TOTAL 34.04 sqm 0.04000000000000001 10.15 SAY 35.0 sqm |
| 21 | 13.61.1 DG roof truss CHS 114.3X3.6mm 8.0 1.0 4.05 0.35796 11.597904 Purlin 80x40x3.2mm 5.0 1.0 6.2 0.48 14.879999999999999 Truss 4nos Purlin 80x40x4mm 4.0 2.0 3.4 0.48 13.056 0.2025 Vertical strut 50x25x2mm 4.0 9.0 0.3 0.15000000000000002 1.62 0.09 7.555555555555555 Inclined strut 50x25x2mm 4.0 8.0 0.55 0.15000000000000002 2.6400000000000006 0.5408326913195983 Base plate 200x200x6mm 8.0 2.0 0.2 0.2 0.6400000000000001 TOTAL 44.433904 sqm 0.04000000000000001 10.15 SAY 45.0 sqm 1.0 1.0 4.2 FLOORING TILES GROUND FLOOR Patio 1.0 1.0 5.0 5.0 Granite Patio-SKIRTING 1.0 1.0 7.1 0.15 1.065 Granite Patio-steps 0.0 Granite Step 1 1.0 1.0 4.5 0.3 1.3499999999999999 Granite do 2.0 1.0 4.5 0.15 1.3499999999999999 Granite step 2 1.0 1.0 5.0 0.3 1.5 Granite do 1.0 1.0 5.0 0.15 0.75 Granite Ramp 1.0 1.0 12.0 1.13 13.559999999999999 chequerred Porch 1.0 1.0 20.0 20.0 chequerred Common areas 1.0 1.0 133.0 133.0 Hdv cgs CGT TILE-1.5MTR Triage 1.0 1.0 42.599999999999994 42.599999999999994 VITRIFIED cgs CGT TILE-1.5MTR Resuscitation 1.0 1.0 18.7 18.7 VITRIFIED cgs CGT TILE-1.5MTR Resuscitation -Toilet 1.0 1.0 2.25 2.25 CERAMIC TILE PVC CGT TILE-2.1MTR Duty Doctor 1.0 1.0 12.1 12.1 VITRIFIED 6MM CGT TILE-1.5MTR Duty Doctor -Toilet 1.0 1.0 2.25 2.25 CERAMIC TILE PVC CGT TILE-2.1MTR Minor OT 1.0 1.0 23.6925 23.6925 VITRIFIED 6MM CGT TILE-1.5MTR Semi sterile 1.0 1.0 21.21795 21.21795 HDV CGS vitr Semi sterile- Change room 2.0 1.0 3.703125 7.40625 VITRIFIED 6mm vitr Observation ward 1.0 1.0 67.0 67.0 VITRIFIED CGS CGT TILE-1.5MTR Observation ward-toilet 1.0 1.0 2.7525 2.7525 CERAMIC TILE PVC CGT TILE-2.1MTR Sample collection 1.0 1.0 10.5 10.5 VITRIFIED 6MM CGT TILE-1.5MTR Electrical room 1.0 1.0 12.88 12.88 VITRIFIED 6MM vitr Female toilets - WC 2.0 1.0 1.74 3.48 CERAMIC TILE PVC CGT TILE-2.1MTR Female toilets 1.0 1.0 7.38 7.38 CERAMIC TILE PVC CGT TILE-2.1MTR PH Toliet 1.0 1.0 4.2 4.2 CERAMIC TILE PVC CGT TILE-2.1MTR Male toilets 1.0 1.0 10.0 10.0 CERAMIC TILE PVC CGT TILE-2.1MTR Male toilets-WC 2.0 1.0 1.7999999999999998 3.5999999999999996 CERAMIC TILE PVC CGT TILE-2.1MTR Fire ctrl room 1.0 1.0 5.2139999999999995 5.2139999999999995 VITRIFIED 6mm vitr FIRST FLOOR Common areas 1.0 1.0 154.0 154.0 Hdv cgs CGT TILE-1.5MTR Immunisation room 1.0 1.0 18.283399999999997 18.283399999999997 V cgs CGT TILE-1.5MTR Breast feeding room 1.0 1.0 12.600175 12.600175 V cgs CGT TILE-1.5MTR 2MM General medicine OP 1.0 1.0 17.51112 17.51112 V 6MM CGT TILE-1.5MTR 13.8 13.8 13.26 Surgery OP 1.0 1.0 17.51112 17.51112 V 6MM CGT TILE-1.5MTR 932.8 466.56 207.0 Pediatric OP 2.0 1.0 17.51112 35.02224 V 6MM CGT TILE-1.5MTR 1056.0 540.0 1092.0 Orthopedic OP 1.0 1.0 17.500049999999998 17.500049999999998 V 6MM CGT TILE-1.5MTR 836.0 427.5 864.5 Gynecology OP 2.0 1.0 17.012999999999998 34.025999999999996 V 6MM CGT TILE-1.5MTR 120.0 120.0 251.94 ENT OP 1.0 1.0 17.012999999999998 17.012999999999998 V 6MM CGT TILE-1.5MTR 2944.8 1554.06 2415.44 Plaster room 1.0 1.0 24.0 24.0 V 6MM CGT TILE-1.5MTR 29.448000000000004 15.5406 24.154400000000003 Electrical room 1.0 1.0 12.88 12.88 V 6MM VITRI 2974.248 1569.6006 2439.5944 Storage 1.0 1.0 10.5 10.5 V 6MM VITRI 3420.3851999999997 1805.0406899999998 2805.53356 Female toilets - WC 2.0 1.0 1.74 3.48 CT PVC CGT TILE-2.1MTR 342.03851999999995 180.504069 280.553356 Female toilets 1.0 1.0 7.38 7.38 CT PVC CGT TILE-2.1MTR PH Toliet 1.0 1.0 4.2 4.2 CT PVC CGT TILE-2.1MTR Male toilets 1.0 1.0 10.0 10.0 CT PVC CGT TILE-2.1MTR Male toilets-WC 2.0 1.0 1.7999999999999998 3.5999999999999996 CT PVC CGT TILE-2.1MTR SECOND FLOOR Common areas 1.0 1.0 147.0 147.0 hdv cgs CGT TILE-1.5MTR Dental treatment 1.0 1.0 31.3083 31.3083 V cgs CGT TILE-1.5MTR Dental OP 1.0 1.0 17.5208 17.5208 V 6mm CGT TILE-1.5MTR Psychiatry OP 1.0 1.0 17.5208 17.5208 V 6mm CGT TILE-1.5MTR PMR 1.0 1.0 41.0948 41.0948 V cgs CGT TILE-1.5MTR Opthalmic OP 1.0 1.0 17.522399999999998 17.522399999999998 V 6mm CGT TILE-1.5MTR Refraction room 1.0 1.0 24.0 24.0 V cgs CGT TILE-1.5MTR Dermatelogy OP 1.0 1.0 17.012999999999998 17.012999999999998 V 6mm CGT TILE-1.5MTR ICTC Lab 1.0 1.0 19.92875 19.92875 V cgs CGT TILE-1.5MTR Counselling room 1.0 1.0 9.9 9.9 V 6mm CGT TILE-1.5MTR Electrical room 1.0 1.0 12.88 12.88 V 6MM VITRI Storage 1.0 1.0 10.5 10.5 V 6MM VITRI Female toilets - WC 2.0 1.0 1.74 3.48 CT PVC CGT TILE-2.1MTR Female toilets 1.0 1.0 7.38 7.38 CT PVC CGT TILE-2.1MTR PH Toliet 1.0 1.0 4.2 4.2 CT PVC CGT TILE-2.1MTR Male toilets 1.0 1.0 10.0 10.0 CT PVC CGT TILE-2.1MTR Male toilets-WC 2.0 1.0 1.7999999999999998 3.5999999999999996 CT PVC CGT TILE-2.1MTR THIRD FLOOR Common areas 1.0 1.0 124.0 124.0 hdv cgs CGT TILE-1.5MTR Pathology & Biochemistry lab 1.0 1.0 52.2 52.2 V cgs CGT TILE-1.5MTR RNTCP Lab 1.0 1.0 33.6303 33.6303 V cgs CGT TILE-1.5MTR Female toilets - WC 2.0 1.0 1.74 3.48 CT PVC CGT TILE-2.1MTR Female toilets 1.0 1.0 7.38 7.38 CT PVC CGT TILE-2.1MTR PH Toliet 1.0 1.0 4.2 4.2 CT PVC CGT TILE-2.1MTR Male toilets 1.0 1.0 10.0 10.0 CT PVC CGT TILE-2.1MTR Male toilets-WC 2.0 1.0 1.7999999999999998 3.5999999999999996 CT PVC CGT TILE-2.1MTR Storage 1.0 1.0 10.5 10.5 V 6MM VITRI Electrical room 1.0 1.0 12.88 12.88 V 6MM VITRI Ultra sound 1.0 1.0 35.0 35.0 V cgs CGT TILE-1.5MTR Ultra sound-Toilet 1.0 1.0 2.25 2.25 CT PVC CGT TILE-2.1MTR Staff rest room 1.0 1.0 14.1 14.1 V 6MM VITRI Staff rest room-Toilet 1.0 1.0 2.25 2.25 CT PVC CGT TILE-2.1MTR Doctors rest room 1.0 1.0 17.5 17.5 V 6MM VITRI Doctors rest room-Toilet 1.0 1.0 2.25 2.25 CT PVC CGT TILE-2.1MTR Nurses rest room 1.0 1.0 17.5 17.5 V 6MM VITRI Nurses rest room-Toilet 1.0 1.0 2.25 2.25 CT PVC CGT TILE-2.1MTR General lab 1.0 1.0 42.599999999999994 42.599999999999994 V cgs CGT TILE-1.5MTR TOTAL 1626.7244550000005 sqm SAY 1627.0 sqm TO BE DONE WALL TILES GROUND FLOOR Common areas 1.0 1.0 172.0 172.0 Triage 1.0 1.0 42.599999999999994 42.599999999999994 Resuscitation 1.0 1.0 18.7 18.7 Resuscitation -Toilet 1.0 1.0 2.25 2.25 Duty Doctor 1.0 1.0 12.1 12.1 Duty Doctor -Toilet 1.0 1.0 2.25 2.25 Minor OT 1.0 1.0 23.6925 23.6925 Semi sterile 1.0 1.0 21.21795 21.21795 Observation ward 1.0 1.0 67.0 67.0 Observation ward-toilet 1.0 1.0 2.7525 2.7525 Sample collection 1.0 1.0 10.5 10.5 Electrical room 1.0 1.0 12.88 12.88 Female toilets - WC 2.0 1.0 1.74 3.48 Female toilets 1.0 1.0 7.38 7.38 PH Toliet 1.0 1.0 4.2 4.2 Male toilets 1.0 1.0 10.0 10.0 Male toilets-WC 2.0 1.0 1.7999999999999998 3.5999999999999996 FIRST FLOOR Common areas 1.0 1.0 192.0 192.0 Immunisation room 1.0 1.0 8.565 8.565 Breast feeding room 1.0 1.0 12.600175 12.600175 General medicine OP 1.0 1.0 17.51112 17.51112 Surgery OP 1.0 1.0 17.51112 17.51112 Pediatric OP 2.0 1.0 17.51112 35.02224 Orthopedic OP 1.0 1.0 17.500049999999998 17.500049999999998 Gynecology OP 2.0 1.0 17.012999999999998 34.025999999999996 ENT OP 1.0 1.0 17.012999999999998 17.012999999999998 Plaster room 1.0 1.0 24.0 24.0 Electrical room 1.0 1.0 12.88 12.88 Storage 1.0 1.0 10.5 10.5 Female toilets - WC 2.0 1.0 1.74 3.48 Female toilets 1.0 1.0 7.38 7.38 PH Toliet 1.0 1.0 4.2 4.2 Male toilets 1.0 1.0 10.0 10.0 Male toilets-WC 2.0 1.0 1.7999999999999998 3.5999999999999996 SECOND FLOOR Dental treatment 1.0 1.0 31.3083 31.3083 Dental OP 1.0 1.0 17.5208 17.5208 Psychiatry OP 1.0 1.0 17.5208 17.5208 PMR 1.0 1.0 41.0948 41.0948 Opthalmic OP 1.0 1.0 17.522399999999998 17.522399999999998 Refraction room 1.0 1.0 24.0 24.0 Dermatelogy OP 1.0 1.0 17.012999999999998 17.012999999999998 ICTC Lab 1.0 1.0 19.92875 19.92875 Counselling room 1.0 1.0 9.9 9.9 Electrical room 1.0 1.0 12.88 12.88 Storage 1.0 1.0 10.5 10.5 Dumb waiter 1.0 1.0 1.1 1.1 Bed lift 1.0 1.0 7.5 7.5 Female toilets - WC 2.0 1.0 1.74 3.48 Female toilets 1.0 1.0 7.38 7.38 PH Toliet 1.0 1.0 4.2 4.2 Male toilets 1.0 1.0 10.0 10.0 Male toilets-WC 2.0 1.0 1.7999999999999998 3.5999999999999996 THIRD FLOOR Pathology & Biochemistry lab 1.0 1.0 52.2 52.2 RNTCP Lab 1.0 1.0 33.6303 33.6303 Female toilets - WC 2.0 1.0 1.74 3.48 Female toilets 1.0 1.0 7.38 7.38 PH Toliet 1.0 1.0 4.2 4.2 Male toilets 1.0 1.0 10.0 10.0 Male toilets-WC 2.0 1.0 1.7999999999999998 3.5999999999999996 Storage 1.0 1.0 10.5 10.5 Electrical room 1.0 1.0 12.88 12.88 Common areas 1.0 1.0 162.0 162.0 FHR 1.0 1.0 4.4 4.4 ELV 1.0 1.0 3.0 3.0 HVAC 1.0 1.0 4.0 4.0 Ultra sound 1.0 1.0 25.0 25.0 Ultra sound-Toilet 1.0 1.0 2.25 2.25 Staff rest room 1.0 1.0 14.1 14.1 Staff rest room-Toilet 1.0 1.0 2.25 2.25 Doctors rest room 1.0 1.0 17.5 17.5 Doctors rest room-Toilet 1.0 1.0 2.25 2.25 Nurses rest room 1.0 1.0 17.5 17.5 Nurses rest room-Toilet 1.0 1.0 2.25 2.25 General lab 1.0 1.0 42.599999999999994 42.599999999999994 TERRACE FLOOR Headroom 1.0 1.0 2.9 4.1 11.889999999999999 Headroom 1.0 1.0 5.2 5.2 TOTAL 1554.9008050000007 sqm SAY 1555.0 sqm |
| 22 | 13.61.1 DG roof truss CHS 114.3X3.6mm 8.0 1.0 4.05 0.35796 11.597904 Purlin 80x40x3.2mm 5.0 1.0 6.2 0.48 14.879999999999999 Truss 4nos Purlin 80x40x4mm 4.0 2.0 3.4 0.48 13.056 0.2025 Vertical strut 50x25x2mm 4.0 9.0 0.3 0.15000000000000002 1.62 0.09 7.555555555555555 Inclined strut 50x25x2mm 4.0 8.0 0.55 0.15000000000000002 2.6400000000000006 0.5408326913195983 Base plate 200x200x6mm 8.0 2.0 0.2 0.2 0.6400000000000001 TOTAL 44.433904 sqm 0.04000000000000001 10.15 SAY 45.0 sqm |
| 23 | 10.16.1 DG roof truss CHS 114.3X3.6mm 8.0 1.0 4.05 9.75 315.9 Purlin 80x40x3.2mm 5.0 1.0 6.2 5.5 170.5 Truss 4nos Purlin 80x40x4mm 4.0 2.0 3.4 6.71 182.512 0.2025 Vertical strut 50x25x2mm 4.0 9.0 0.3 2.15 23.219999999999995 0.09 7.555555555555555 Inclined strut 50x25x2mm 4.0 8.0 0.55 2.15 37.84 0.5408326913195983 Base plate 200x200x6mm 8.0 1.0 0.2 0.2 47.1 15.072000000000003 Add 5% for fittings 0.05 1.0 745.0440000000001 37.25220000000001 TOTAL 782.2962000000001 Kg 0.04000000000000001 10.15 SAY 783.0 Kg 12.5 Providing and fixing precoated galvanised iron profile sheets (size,shape and pitch of corrugation as approved by Engineer-in-charge)0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 micronsepoxy primer on both side of the sheet and polyester top coat 15-18microns. Sheet should have protective guard film of 25 micronsminimum to avoid scratches during transportation and should besupplied in single length upto 12 metre or as desired by Engineerin-charge. The sheet shall be fixed using self drilling /self tappingscrews of size (5.5x 55 mm) with EPDM seal, complete upto anypitch in horizontal/ vertical or curved surfaces, excluding the cost ofpurlins, rafters and trusses and including cutting to size and shapewherever required. DG ROOF SHEET 1.0 1.0 7.4 4.6 34.04 TOTAL 34.04 sqm 0.04000000000000001 10.15 SAY 35.0 sqm VITRIFIED TILE GROUND FLOOR Fire stair 2.0 1.0 4.5 3.55 31.95 Janitor 1.0 1.0 1.7 2.1 3.57 Store 1.0 1.0 3.0 2.4 7.199999999999999 Staff Toilet 1.0 1.0 9.83 9.83 Toilet 2.0 1.0 1.5 1.3 3.9000000000000004 Fire ctrl room 1.0 1.0 3.0 2.4 7.199999999999999 Electrical room 1.0 1.0 11.64 11.64 VITRIFIED UPS Room 1.0 1.0 2.9 2.45 7.105 VITRIFIED Staff Doffing - M 1.0 1.0 5.66 5.66 Staff Doffing - F 1.0 1.0 5.66 5.66 Store 1.0 1.0 2.6 2.5 6.5 Office 1.0 1.0 2.6 3.25 8.450000000000001 Pharmacy 1.0 1.0 6.4 5.85 37.44 PH Toilet 1.0 1.0 2.1 1.5 3.1500000000000004 Female Toilet 1.0 1.0 11.97 11.97 Female Toilet - Toilet 2.0 1.0 1.2 1.3 3.12 Male Toilet 1.0 1.0 11.97 11.97 Male Toilet - Toilet 2.0 1.0 1.2 1.3 3.12 Area infront of change 1.0 1.0 2.6 5.1 13.26 M.Change 2.0 1.0 1.4 1.2 3.36 F.Change 2.0 1.0 1.4 1.2 3.36 USG RM 1.0 1.0 4.9 5.85 28.665 Staff Donning-F 1.0 1.0 14.2 14.2 Staff Donning-M 1.0 1.0 5.91 5.91 Store room 1.0 1.0 3.0 2.4 7.199999999999999 Procedure room RM 1.0 1.0 4.5 3.975 17.8875 Consultation room3 1.0 1.0 3.85 3.975 15.30375 Consultation room2 1.0 1.0 3.825 3.975 15.204375 Consultation room1 1.0 1.0 4.9 3.975 19.477500000000003 Area infront of By stander Donning (F&M) 1.0 1.0 1.5 5.95 8.925 Area infront of Staff Doffing (F&M) 1.0 1.0 1.4 5.95 8.33 Bystander waiting area 1.0 1.0 10.3 5.8 59.74 Lab 1.0 1.0 4.9 5.85 28.665 Bystander Donning & Doffing - F 2.0 1.0 5.66 11.32 Bystander Donning & Doffing - M 2.0 1.0 5.66 11.32 Area infront of Bystander Doffing (F&M) 1.0 1.0 1.4 5.95 8.33 X Ray 1.0 1.0 4.2 5.2 21.840000000000003 Console Room 1.0 1.0 2.1 5.3 11.13 3m wide corridor infront of lift & janitor room 1.0 1.0 109.0 109.0 Pre & post sampling waiting area 1.0 1.0 228.0 228.0 Accounts and Nurse stn 1.0 1.0 197.0 197.0 Bystander Doffing (M&F) - Toilet 2.0 1.0 1.2 1.3 3.12 Bystander Donning (M&F) - Toilet 2.0 1.0 1.2 1.3 3.12 Staff Donning (M&F) - Toilet 2.0 1.0 1.2 1.3 3.12 Staff Doffing (M&F) - Toilet 2.0 1.0 1.2 1.3 3.12 Store 2.0 1.0 1.5 1.55 4.65 Screening 1.0 1.0 33.0 33.0 FIRST FLOOR Fire stair 2.0 1.0 4.5 3.55 31.95 Janitor 1.0 1.0 3.0 2.4 7.199999999999999 Store 1.0 1.0 3.0 2.4 7.199999999999999 Staff Doffing 1.0 1.0 9.83 9.83 Staff Doffing-Shower 1.0 1.0 1.7 2.1 3.57 Staff Doffing-Toilet 2.0 1.0 1.5 1.3 3.9000000000000004 Electrical room 1.0 1.0 11.64 11.64 UPS Room 1.0 1.0 2.9 2.45 7.105 3.3m wide corridor infront of lift & janitor room 1.0 1.0 89.05 89.05 DU 1.0 2.0 2.6 1.6 8.32 Toilet 2.0 2.0 1.2 1.3 6.24 Area infront of DU & Toilet 1.0 2.0 7.41 14.82 Ward (5 beds) - M&F 2.0 1.0 7.315 5.975 87.41425 Nurses lounge 1.0 1.0 20.3 20.3 Staff Dining 1.0 1.0 31.7 31.7 Doctors lounge 1.0 1.0 4.25 5.975 25.393749999999997 3m wide corridor infront of lift & store room 1.0 1.0 84.0 84.0 3.3m wide corridor near Bystander waiting 2.0 1.0 152.0 304.0 Area infront of Procedure room 2.0 1.0 6.525 3.0 39.150000000000006 Clean utility 2.0 1.0 1.5 2.46 7.38 Sterile store 2.0 1.0 1.5 2.465 7.395 Procedure room 1.0 1.0 6.7 5.85 39.195 Bystander Toilet 1.0 1.0 8.2 8.2 Bystander Toilet - Toilet 2.0 1.0 1.5 1.3 3.9000000000000004 Bystander Toilet - Shower 1.0 1.0 1.7 2.1 3.57 AHU Room 1.0 1.0 22.65 22.65 DU Store 1.0 1.0 1.5 1.275 1.9124999999999999 General store 1.0 1.0 1.5 1.275 1.9124999999999999 Isolation room 1 to 10 10.0 1.0 13.25 132.5 Isolation room 1 to 10 - Toilet 10.0 1.0 1.5 1.5 22.5 Area infront of Isolation room 1 to 10 10.0 1.0 3.225 1.2 38.699999999999996 Store 1.0 1.0 2.4 2.4 5.76 SECOND FLOOR Fire stair 2.0 1.0 4.5 3.55 31.95 Janitor 1.0 1.0 3.0 2.4 7.199999999999999 Store 1.0 1.0 3.0 2.4 7.199999999999999 Staff Toilet 1.0 1.0 9.83 9.83 Staff Toilet-Shower 1.0 1.0 1.7 2.1 3.57 Staff Toilet-Toilet 2.0 1.0 1.5 1.3 3.9000000000000004 Electrical room 1.0 1.0 11.64 11.64 UPS Room 1.0 1.0 2.9 2.45 7.105 Isolation room 1 to 20 20.0 1.0 13.25 265.0 Isolation room 1 to 20 - Toilet 20.0 1.0 1.5 1.5 45.0 Area infront of Isolation room 1 to 20 10.0 1.0 3.225 1.2 38.699999999999996 3.3m wide corridor infront of clean utility & sterile room 1.0 1.0 115.0 115.0 3.3m wide corridor infront of clean utility & sterile room 1.0 1.0 136.0 136.0 Clean utility 2.0 1.0 1.5 2.46 7.38 Sterile store 2.0 1.0 1.5 2.465 7.395 Procedure room 1.0 1.0 6.7 5.85 39.195 Area infront of Procedure room 2.0 1.0 6.525 3.0 39.150000000000006 3.3m wide corridor infront of lift & janitor room 1.0 1.0 89.05 89.05 3m wide corridor infront of lift & store room 1.0 1.0 84.0 84.0 Staff Toilet 1.0 1.0 8.2 8.2 Staff Toilet - Toilet 2.0 1.0 1.5 1.3 3.9000000000000004 Staff Toilet - Shower 1.0 1.0 1.7 2.1 3.57 AHU Room 1.0 1.0 22.64 22.64 TERRACE FLOOR Fire stair & Lobby 2.0 1.0 27.0 54.0 Fire stair 2.0 1.0 39.0 78.0 Lift 2.0 1.0 3.0 2.4 14.399999999999999 Ele 1.0 1.0 0.8 0.9 0.7200000000000001 ELV 1.0 1.0 0.7 0.9 0.63 Fire 1.0 1.0 0.7 0.9 0.63 HVAC 1.0 1.0 0.8 0.9 0.7200000000000001 Plumbing duct 1500X800 10.0 1.0 1.5 0.8 12.0 Plumbing duct 1400X800 2.0 1.0 1.4 0.8 2.2399999999999998 Lift Machine room 2.0 1.0 3.0 2.4 14.399999999999999 WATER TANK TOTAL 3329.6661249999993 sqm SAY 3330.0 sqm FLOORING GROUND FLOOR Fire stair 2.0 1.0 29.2 58.4 heavy duty Janitor 1.0 1.0 1.7 2.1 3.57 vitrified Store 1.0 1.0 3.0 2.4 7.199999999999999 vitrified Staff Toilet 1.0 1.0 9.83 9.83 ceramic Toilet 2.0 1.0 1.5 1.3 3.9000000000000004 ceramic Fire ctrl room 1.0 1.0 3.0 2.4 7.199999999999999 vitrified Electrical room 1.0 1.0 11.64 11.64 vitrified UPS Room 1.0 1.0 2.9 2.45 7.105 vitrified Staff Doffing - M 1.0 1.0 5.66 5.66 ceramic Staff Doffing - F 1.0 1.0 5.66 5.66 ceramic Store 1.0 1.0 2.6 2.5 6.5 vitrified Office 1.0 1.0 2.6 3.25 8.450000000000001 vitrified Pharmacy 1.0 1.0 6.4 5.85 37.44 vitrified PH Toilet 1.0 1.0 2.1 1.5 3.1500000000000004 ceramic Female Toilet 1.0 1.0 11.97 11.97 ceramic Female Toilet - Toilet 2.0 1.0 1.2 1.3 3.12 ceramic Male Toilet 1.0 1.0 11.97 11.97 ceramic Male Toilet - Toilet 2.0 1.0 1.2 1.3 3.12 ceramic Area infront of change 1.0 1.0 2.6 5.1 13.26 vitrified M.Change 2.0 1.0 1.4 1.2 3.36 vitrified F.Change 2.0 1.0 1.4 1.2 3.36 vitrified USG RM 1.0 1.0 4.9 5.85 28.665 vitrified 336.4200000000001 USG RM-Toilet 1.0 1.0 2.2 1.5 3.3000000000000003 ceramic Staff Donning-F 1.0 1.0 14.2 14.2 ceramic Staff Donning-M 1.0 1.0 5.91 5.91 ceramic Store room 1.0 1.0 3.0 2.4 7.199999999999999 vitrified Procedure room RM 1.0 1.0 4.5 3.975 17.8875 vitrified Consultation room3 1.0 1.0 3.85 3.975 15.30375 vitrified Consultation room2 1.0 1.0 3.825 3.975 15.204375 vitrified Consultation room1 1.0 1.0 4.9 3.975 19.477500000000003 vitrified Area infront of By stander Donning (F&M) 1.0 1.0 1.5 5.95 8.925 vitrified Area infront of Staff Doffing (F&M) 1.0 1.0 1.4 5.95 8.33 vitrified Bystander waiting area 1.0 1.0 10.3 5.8 59.74 heavy duty Lab 1.0 1.0 4.9 5.85 28.665 vitrified Bystander Donning & Doffing - F 2.0 1.0 5.66 11.32 ceramic Bystander Donning & Doffing - M 2.0 1.0 5.66 11.32 ceramic Area infront of Bystander Doffing (F&M) 1.0 1.0 1.4 5.95 8.33 vitrified X Ray 1.0 1.0 4.2 5.2 21.840000000000003 vitrified Console Room 1.0 1.0 2.1 5.3 11.13 vitrified 3m wide corridor infront of lift & janitor room 1.0 1.0 109.0 109.0 heavy duty Pre & post sampling waiting area 1.0 1.0 228.0 228.0 heavy duty Accounts and Nurse stn 1.0 1.0 197.0 197.0 heavy duty Bystander Doffing (M&F) - Toilet 2.0 1.0 1.2 1.3 3.12 ceramic Bystander Donning (M&F) - Toilet 2.0 1.0 1.2 1.3 3.12 ceramic Staff Donning (M&F) - Toilet 2.0 1.0 1.2 1.3 3.12 ceramic Staff Doffing (M&F) - Toilet 2.0 1.0 1.2 1.3 3.12 ceramic Store 2.0 1.0 1.5 1.55 4.65 vitrified Screening 1.0 1.0 33.0 33.0 heavy duty FIRST FLOOR Fire stair 2.0 1.0 29.2 58.4 heavy duty Janitor 1.0 1.0 3.0 2.4 7.199999999999999 vitrified Store 1.0 1.0 3.0 2.4 7.199999999999999 vitrified Staff Toilet 1.0 1.0 9.83 9.83 ceramic Staff Toilet-Shower 1.0 1.0 1.7 2.1 3.57 ceramic Staff Toilet-Toilet 2.0 1.0 1.5 1.3 3.9000000000000004 ceramic Electrical room 1.0 1.0 11.64 11.64 vitrified UPS Room 1.0 1.0 2.9 2.45 7.105 vitrified 3.3m wide corridor infront of lift & janitor room 1.0 1.0 89.05 89.05 heavy duty DU 1.0 2.0 2.6 1.6 8.32 ceramic Toilet 2.0 2.0 1.2 1.3 6.24 ceramic Area infront of DU & Toilet 1.0 2.0 7.41 14.82 ceramic Ward (5 beds) - M&F 2.0 1.0 7.315 5.975 87.41425 vitrified Nurses lounge 1.0 1.0 20.3 20.3 vitrified Staff Dining 1.0 1.0 31.7 31.7 vitrified Doctors lounge 1.0 1.0 4.25 5.975 25.393749999999997 vitrified 3m wide corridor infront of lift & store room 1.0 1.0 84.0 84.0 heavy duty 3.3m wide corridor near Bystander waiting 2.0 1.0 152.0 304.0 heavy duty Area infront of Procedure room 2.0 1.0 6.525 3.0 39.150000000000006 heavy duty Clean utility 2.0 1.0 1.5 2.46 7.38 vitrified Sterile store 2.0 1.0 1.5 2.465 7.395 vitrified Procedure room 1.0 1.0 6.7 5.85 39.195 vitrified Bystander Toilet 1.0 1.0 8.2 8.2 ceramic Bystander Toilet - Toilet 2.0 1.0 1.5 1.3 3.9000000000000004 ceramic Bystander Toilet - Shower 1.0 1.0 1.7 2.1 3.57 ceramic AHU Room 1.0 1.0 22.65 22.65 vitrified DU Store 1.0 1.0 1.5 1.275 1.9124999999999999 ceramic General store 1.0 1.0 1.5 1.275 1.9124999999999999 vitrified Isolation room 1 to 10 10.0 1.0 13.25 132.5 vitrified Isolation room 1 to 10 - Toilet 10.0 1.0 1.5 1.5 22.5 ceramic Area infront of Isolation room 1 to 10 10.0 1.0 3.225 1.2 38.699999999999996 vitrified Store 1.0 1.0 2.4 2.4 5.76 vitrified SECOND FLOOR Fire stair 2.0 1.0 29.2 58.4 heavy duty Janitor 1.0 1.0 3.0 2.4 7.199999999999999 vitrified Store 1.0 1.0 3.0 2.4 7.199999999999999 vitrified Staff Toilet 1.0 1.0 9.83 9.83 ceramic Staff Toilet-Shower 1.0 1.0 1.7 2.1 3.57 ceramic Staff Toilet-Toilet 2.0 1.0 1.5 1.3 3.9000000000000004 ceramic Electrical room 1.0 1.0 11.64 11.64 vitrified UPS Room 1.0 1.0 2.9 2.45 7.105 vitrified Isolation room 1 to 20 20.0 1.0 13.25 265.0 vitrified Isolation room 1 to 20 - Toilet 20.0 1.0 1.5 1.5 45.0 ceramic Area infront of Isolation room 1 to 20 20.0 1.0 3.225 1.2 77.39999999999999 vitrified 3.3m wide corridor infront of clean utility & sterile room 1.0 1.0 115.0 115.0 heavy duty 3.3m wide corridor infront of clean utility & sterile room 1.0 1.0 136.0 136.0 heavy duty Clean utility 2.0 1.0 1.5 2.46 7.38 vitrified Sterile store 2.0 1.0 1.5 2.465 7.395 vitrified Procedure room 1.0 1.0 6.7 5.85 39.195 vitrified Area infront of Procedure room 2.0 1.0 6.525 3.0 39.150000000000006 heavy duty 3.3m wide corridor infront of lift & janitor room 1.0 1.0 89.05 89.05 heavy duty 3m wide corridor infront of lift & store room 1.0 1.0 84.0 84.0 heavy duty HEAVY 1861.3400000000001 1913.34 Staff Toilet 1.0 1.0 8.2 8.2 ceramic VITRI 1210.2936250000002 Staff Toilet - Toilet 2.0 1.0 1.5 1.3 3.9000000000000004 ceramic CERA 281.6424999999999 Staff Toilet - Shower 1.0 1.0 1.7 2.1 3.57 ceramic 3353.2761250000003 AHU Room 1.0 1.0 22.64 22.64 vitrified TERRACE FLOOR Fire stair & Lobby 2.0 1.0 40.0 80.0 heavy duty 3353.2761250000003 false ceiling GROUND FLOOR Fire stair 2.0 1.0 4.5 3.55 31.95 CST/CSB Janitor 1.0 1.0 1.7 2.1 3.57 6MM Store 1.0 1.0 3.0 2.4 7.199999999999999 6MM Staff Toilet 1.0 1.0 9.83 9.83 PVC Toilet 2.0 1.0 1.5 1.3 3.9000000000000004 PVC Fire ctrl room 1.0 1.0 3.0 2.4 7.199999999999999 6MM Electrical room 1.0 1.0 11.64 11.64 6MM UPS Room 1.0 1.0 2.9 2.45 7.105 6MM Staff Doffing - M 1.0 1.0 5.66 5.66 PVC Staff Doffing - F 1.0 1.0 5.66 5.66 PVC Store 1.0 1.0 2.6 2.5 6.5 6MM Office 1.0 1.0 2.6 3.25 8.450000000000001 6MM Pharmacy 1.0 1.0 6.4 5.85 37.44 6MM PH Toilet 1.0 1.0 2.1 1.5 3.1500000000000004 PVC Female Toilet 1.0 1.0 11.97 11.97 PVC Female Toilet - Toilet 2.0 1.0 1.2 1.3 3.12 PVC Male Toilet 1.0 1.0 11.97 11.97 PVC Male Toilet - Toilet 2.0 1.0 1.2 1.3 3.12 PVC Area infront of change 1.0 1.0 2.6 5.1 13.26 6MM M.Change 2.0 1.0 1.4 1.2 3.36 6MM F.Change 2.0 1.0 1.4 1.2 3.36 6MM USG RM 1.0 1.0 4.9 5.85 28.665 CST/CSB 336.4200000000001 Staff Donning-F 1.0 1.0 14.2 14.2 PVC Staff Donning-M 1.0 1.0 5.91 5.91 PVC Store room 1.0 1.0 3.0 2.4 7.199999999999999 6MM Procedure room RM 1.0 1.0 4.5 3.975 17.8875 6MM Consultation room3 1.0 1.0 3.85 3.975 15.30375 6MM Consultation room2 1.0 1.0 3.825 3.975 15.204375 6MM Consultation room1 1.0 1.0 4.9 3.975 19.477500000000003 6MM Area infront of By stander Donning (F&M) 1.0 1.0 1.5 5.95 8.925 PVC Area infront of Staff Doffing (F&M) 1.0 1.0 1.4 5.95 8.33 PVC Bystander waiting area 1.0 1.0 10.3 5.8 59.74 CST/CSB Lab 1.0 1.0 4.9 5.85 28.665 CST/CSB Bystander Donning & Doffing - F 2.0 1.0 5.66 11.32 PVC Bystander Donning & Doffing - M 2.0 1.0 5.66 11.32 PVC Area infront of Bystander Doffing (F&M) 1.0 1.0 1.4 5.95 8.33 PVC X Ray 1.0 1.0 4.2 5.2 21.840000000000003 CST/CSB Console Room 1.0 1.0 2.1 5.3 11.13 CST/CSB 3m wide corridor infront of lift & janitor room 1.0 1.0 109.0 109.0 CST/CSB Pre & post sampling waiting area 1.0 1.0 228.0 228.0 CST/CSB Accounts and Nurse stn 1.0 1.0 197.0 197.0 CST/CSB Bystander Doffing (M&F) - Toilet 2.0 1.0 1.2 1.3 3.12 PVC Bystander Donning (M&F) - Toilet 2.0 1.0 1.2 1.3 3.12 PVC Staff Donning (M&F) - Toilet 2.0 1.0 1.2 1.3 3.12 PVC Staff Doffing (M&F) - Toilet 2.0 1.0 1.2 1.3 3.12 PVC Store 2.0 1.0 1.5 1.55 4.65 6MM Screening 1.0 1.0 33.0 33.0 CST/CSB FIRST FLOOR 0.0 Fire stair 2.0 1.0 4.5 3.55 31.95 CST/CSB Janitor 1.0 1.0 3.0 2.4 7.199999999999999 6MM Store 1.0 1.0 3.0 2.4 7.199999999999999 6MM Staff Doffing 1.0 1.0 9.83 9.83 PVC Staff Doffing-Shower 1.0 1.0 1.7 2.1 3.57 PVC Staff Doffing-Toilet 2.0 1.0 1.5 1.3 3.9000000000000004 PVC Electrical room 1.0 1.0 11.64 11.64 6MM UPS Room 1.0 1.0 2.9 2.45 7.105 6MM 3.3m wide corridor infront of lift & janitor room 1.0 1.0 89.05 89.05 CST/CSB DU 1.0 2.0 2.6 1.6 8.32 PVC Toilet 2.0 2.0 1.2 1.3 6.24 PVC Area infront of DU & Toilet 1.0 2.0 7.41 14.82 PVC Ward (5 beds) - M&F 2.0 1.0 7.315 5.975 87.41425 CST/CSB Nurses lounge 1.0 1.0 20.3 20.3 6MM Staff Dining 1.0 1.0 31.7 31.7 6MM Doctors lounge 1.0 1.0 4.25 5.975 25.393749999999997 6MM 3m wide corridor infront of lift & store room 1.0 1.0 84.0 84.0 CST/CSB 3.3m wide corridor near Bystander waiting 2.0 1.0 152.0 304.0 CST/CSB Area infront of Procedure room 2.0 1.0 6.525 3.0 39.150000000000006 CST/CSB Clean utility 2.0 1.0 1.5 2.46 7.38 6MM Sterile store 2.0 1.0 1.5 2.465 7.395 6MM Procedure room 1.0 1.0 6.7 5.85 39.195 6MM Bystander Toilet 1.0 1.0 8.2 8.2 PVC Bystander Toilet - Toilet 2.0 1.0 1.5 1.3 3.9000000000000004 PVC Bystander Toilet - Shower 1.0 1.0 1.7 2.1 3.57 PVC AHU Room 1.0 1.0 22.65 22.65 6MM DU Store 1.0 1.0 1.5 1.275 1.9124999999999999 6MM General store 1.0 1.0 1.5 1.275 1.9124999999999999 6MM Isolation room 1 to 10 10.0 1.0 13.25 132.5 CST/CSB Isolation room 1 to 10 - Toilet 10.0 1.0 1.5 1.5 22.5 PVC Area infront of Isolation room 1 to 10 10.0 1.0 3.225 1.2 38.699999999999996 CST/CSB Store 1.0 1.0 2.4 2.4 5.76 6MM SECOND FLOOR 0.0 Fire stair 2.0 1.0 4.5 3.55 31.95 CST/CSB Janitor 1.0 1.0 3.0 2.4 7.199999999999999 6MM Store 1.0 1.0 3.0 2.4 7.199999999999999 6MM Staff Toilet 1.0 1.0 9.83 9.83 PVC Staff Toilet-Shower 1.0 1.0 1.7 2.1 3.57 PVC Staff Toilet-Toilet 2.0 1.0 1.5 1.3 3.9000000000000004 PVC Electrical room 1.0 1.0 11.64 11.64 6MM UPS Room 1.0 1.0 2.9 2.45 7.105 6MM Isolation room 1 to 20 20.0 1.0 13.25 265.0 CST/CSB Isolation room 1 to 20 - Toilet 20.0 1.0 1.5 1.5 45.0 PVC Area infront of Isolation room 1 to 20 10.0 1.0 3.225 1.2 38.699999999999996 CST/CSB 3.3m wide corridor infront of clean utility & sterile room 1.0 1.0 115.0 115.0 CST/CSB 3.3m wide corridor infront of clean utility & sterile room 1.0 1.0 136.0 136.0 CST/CSB Clean utility 2.0 1.0 1.5 2.46 7.38 6MM Sterile store 2.0 1.0 1.5 2.465 7.395 6MM Procedure room 1.0 1.0 6.7 5.85 39.195 6MM Area infront of Procedure room 2.0 1.0 6.525 3.0 39.150000000000006 CST/CSB 3.3m wide corridor infront of lift & janitor room 1.0 1.0 89.05 89.05 CST/CSB 3m wide corridor infront of lift & store room 1.0 1.0 84.0 84.0 CST/CSB Staff Toilet 1.0 1.0 8.2 8.2 PVC Staff Toilet - Toilet 2.0 1.0 1.5 1.3 3.9000000000000004 PVC Staff Toilet - Shower 1.0 1.0 1.7 2.1 3.57 PVC AHU Room 1.0 1.0 22.64 22.64 6MM TERRACE FLOOR Fire stair & Lobby 2.0 1.0 27.0 54.0 6MM Fire stair 2.0 1.0 39.0 78.0 CST/CSB Lift 2.0 1.0 3.0 2.4 14.399999999999999 6MM Ele 1.0 1.0 0.8 0.9 0.7200000000000001 6MM ELV 1.0 1.0 0.7 0.9 0.63 6MM Fire 1.0 1.0 0.7 0.9 0.63 6MM HVAC 1.0 1.0 0.8 0.9 0.7200000000000001 6MM Plumbing duct 1500X800 10.0 1.0 1.5 0.8 12.0 6MM Plumbing duct 1400X800 2.0 1.0 1.4 0.8 2.2399999999999998 6MM Lift Machine room 2.0 1.0 3.0 2.4 14.399999999999999 6MM WATER TANK 6MM CONSTRUCTION OF ISOLATION BLOCK WITH MODERN FACILITIES AT GOVT MEDICAL COLLEGE, KOZHIKODE DETAILED ESTIMATE - MAIN BUILDING Item No DSR code Details of items Unit Quantity Rate Amount 12694752.360000001 -12694752.360000001 84.5 270.0 0.0 0.0 0.0 0.0 141739.0 -141739.0 0.0 72444.38 -72444.38 0.0 152516.22 -152516.22 0.0 0.0 0.0 0.0 103804.55 -103804.55 0.0 34507.75 -34507.75 9360.560000000001 -9360.560000000001 23 0.0 10095.96 -10095.96 0.0 123337.89 -123337.89 0.0 783712.3500000001 -783712.3500000001 0.0 122800.85999999999 -122800.85999999999 0.0 100473.37000000001 -100473.37000000001 0.0 0.0 0.0 0.0 0.0 0.0 0.0 179055.54 -179055.54 0.0 133399.2 -133399.2 0.0 2466918.7199999997 -2466918.7199999997 0.0 3381663.2800000003 -3381663.2800000003 0.0 2085690.5999999999 -2085690.5999999999 0.0 196315.36 -196315.36 0.0 422393.39999999997 -422393.39999999997 0.0 52300.100000000006 -52300.100000000006 0.0 17142.6 -17142.6 0.0 80735.97 -80735.97 0.0 42393.29 -42393.29 0.0 12940310.299999999 -12940310.299999999 0.75 0.0 20733632.599999998 -20733632.599999998 99.0 0.0 0.0 0.0 0.0 1275918.08 -1275918.08 0.0 0.0 0.0 0.0 3137459.4 -3137459.4 0.0 0.0 0.0 0.0 988601.0 -988601.0 0.0 10153545.600000001 -10153545.600000001 0.0 0.0 0.0 0.0 0.0 1095500.34 -1095500.34 0.0 99801.76 -99801.76 0.0 2358662.6 -2358662.6 0.0 3558902.58 -3558902.58 0.0 1509952.87 -1509952.87 0.0 1416069.79 -1416069.79 0.0 241236.90000000002 -241236.90000000002 0.0 2424733.32 -2424733.32 0.0 616055.5800000001 -616055.5800000001 0.0 34098.68 -34098.68 0.0 4159835.4 -4159835.4 0.0 2149108.23 -2149108.23 0.0 90667.54000000001 -90667.54000000001 0.0 2635259.92 -2635259.92 0.0 371202.48 -371202.48 0.0 366548.0 -366548.0 0.0 303324.85000000003 -303324.85000000003 0.0 1677705.69 -1677705.69 0.0 1946512.53 -1946512.53 0.0 0.0 0.0 0.0 372299.76 -372299.76 0.0 48511.979999999996 -48511.979999999996 0.0 148371.41 -148371.41 0.0 1349644.73 -1349644.73 76.5 0.0 3884194.51 -3884194.51 0.0 500660.88999999996 -500660.88999999996 0.0 0.0 0.0 0.0 38892.63 -38892.63 0.0 77775.24 -77775.24 0.0 84524.55 -84524.55 0.0 10866.45 -10866.45 0.0 930187.52 -930187.52 0.0 930187.52 -930187.52 0.0 1051659.3599999999 -1051659.3599999999 0.0 1993503.5199999998 -1993503.5199999998 0.0 131176.85 -131176.85 0.0 442472.80000000005 -442472.80000000005 0.0 439403.49000000005 -439403.49000000005 0.0 612486.27 -612486.27 0.0 2121772.89 -2121772.89 0.0 24332.4 -24332.4 0.0 0.0 0.0 0.0 359349.8 -359349.8 0.0 173749.59 -173749.59 0.0 1742118.48 -1742118.48 0.0 1718086.9300000002 -1718086.9300000002 0.0 1291987.9000000001 -1291987.9000000001 0.0 0.0 0.0 0.0 311774.43 -311774.43 0.0 378443.04 -378443.04 0.0 191066.52 -191066.52 0.0 263024.55 -263024.55 0.0 Rate 20474/sqm 0.0 15323.777999999998 -15323.777999999998 0.0 29772.75 -29772.75 0.0 818.82 -818.82 0.0 24243.17 -24243.17 0.0 9950.220000000001 -9950.220000000001 0.0 11369.28 -11369.28 0.0 2531.7599999999998 -2531.7599999999998 0.0 1319.5500000000002 -1319.5500000000002 0.0 1898.54 -1898.54 0.0 62699.0 -62699.0 0.0 641922.28 -641922.28 0.0 86208.12 -86208.12 0.0 0.0 0.0 0.0 42055.5 -42055.5 0.0 84205.68 -84205.68 0.0 38804.01 -38804.01 0.0 6352.74 -6352.74 0.0 51115.14 -51115.14 0.0 0.0 0.0 0.0 90285.24 -90285.24 0.0 272496.51 -272496.51 0.0 164751.0 -164751.0 0.0 1562165.76 -1562165.76 0.0 404258.4 -404258.4 0.0 28334.750000000004 -28334.750000000004 0.0 126051.49999999999 -126051.49999999999 0.0 147566.54 -147566.54 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 273814.95 -273814.95 0.0 273814.95 -273814.95 0.0 87967.47 -87967.47 0.0 189428.81 -189428.81 0.0 102000.0 -102000.0 0.0 62664.0 62664.0 -62664.0 0.0 22451.94 22451.94 -22451.94 0.0 22164.18 22164.18 -22164.18 0.0 6600.0 6600.0 -6600.0 0.0 0.0 0.0 0.0 11664.0 11664.0 -11664.0 0.0 13625.0 13625.0 -13625.0 0.0 TOTAL 0.0 3230000.0 0.0 TOTAL (gst 18%) 0.0 2470000.0 CONSTRUCTION OF ISOLATION BLOCK WITH MODERN FACILITIES AT GOVT MEDICAL COLLEGE, TRIVANDRUM 162912330.0 500596.88 162912330.0 664566.9299999999 0.31999999999999995 164012330.0 162912330.0 153768798.0 153768798.0 -0.75 448.05 2439.8 2887.8500000000004 438.05 2499.8 2937.8500000000004 5825.700000000001 CERAMIC GROUND FLOOR Fire stair 2.0 1.0 12.0 0.15 3.5999999999999996 SKIRTING Janitor 1.0 1.0 10.8 0.15 1.62 SKIRTING Store 1.0 1.0 10.8 0.15 1.62 SKIRTING Staff Toilet 1.0 1.0 14.4 2.1 30.240000000000002 2.1MTR Toilet 2.0 1.0 5.6 2.1 23.52 2.1MTR Fire ctrl room 1.0 1.0 7.6 0.15 1.14 SKIRTING Electrical room 1.0 1.0 15.8 0.15 2.37 SKIRTING UPS Room 1.0 1.0 10.7 0.15 1.6049999999999998 SKIRTING Staff Doffing - M 1.0 1.0 10.95 2.1 22.995 2.1MTR Staff Doffing - F 1.0 1.0 10.95 2.1 22.995 2.1MTR Store 1.0 1.0 10.2 0.15 1.5299999999999998 SKIRTING Office 1.0 1.0 11.7 0.15 1.755 SKIRTING Pharmacy 1.0 1.0 24.5 1.5 36.75 1.5MTR PH Toilet 1.0 1.0 7.2 2.1 15.120000000000001 2.1MTR Female Toilet 1.0 1.0 17.9 2.1 37.589999999999996 2.1MTR Female Toilet - Toilet 2.0 1.0 5.0 2.1 21.0 2.1MTR Male Toilet 1.0 1.0 17.9 2.1 37.589999999999996 2.1MTR Male Toilet - Toilet 2.0 1.0 5.0 2.1 21.0 2.1MTR Area infront of change 1.0 1.0 15.399999999999999 0.15 2.3099999999999996 SKIRTING M.Change 2.0 1.0 5.199999999999999 0.15 1.5599999999999998 SKIRTING F.Change 2.0 1.0 5.199999999999999 0.15 1.5599999999999998 SKIRTING USG RM 1.0 1.0 21.5 1.5 32.25 1.5MTR 336.4200000000001 USG RM-Toilet 1.0 1.0 7.4 2.1 15.540000000000001 2.1MTR Staff Donning-F 1.0 1.0 23.3 2.1 48.93000000000001 2.1MTR Staff Donning-M 1.0 1.0 11.15 2.1 23.415000000000003 2.1MTR Store room 1.0 1.0 10.8 0.15 1.62 SKIRTING Procedure room RM 1.0 1.0 16.95 1.5 25.424999999999997 1.5MTR Consultation room3 1.0 1.0 15.65 1.5 23.475 1.5MTR Consultation room2 1.0 1.0 15.600000000000001 1.5 23.400000000000002 1.5MTR Consultation room1 1.0 1.0 17.75 1.5 26.625 1.5MTR 3.87 Area infront of By stander Donning (F&M) 1.0 1.0 14.9 2.1 31.290000000000003 2.1MTR Area infront of Staff Doffing (F&M) 1.0 1.0 14.7 2.1 30.87 2.1MTR Bystander waiting area 1.0 1.0 32.2 1.5 48.300000000000004 1.5MTR Lab 1.0 1.0 21.5 1.5 32.25 1.5MTR Bystander Doffing & Donning-F 2.0 1.0 10.95 2.1 45.99 2.1MTR Bystander Doffing & Donning-M 2.0 1.0 10.95 2.1 45.99 2.1MTR Area infront of Bystander Doffing (F&M) 1.0 1.0 14.7 2.1 30.87 2.1MTR X Ray 1.0 1.0 18.8 1.5 28.200000000000003 1.5MTR Console Room 1.0 1.0 14.8 1.5 22.200000000000003 1.5MTR 3m wide corridor infront of lift & janitor room 1.0 1.0 90.2 1.5 135.3 1.5MTR Pre & post sampling waiting area 1.0 1.0 95.0 1.5 142.5 1.5MTR Accounts and Nurse stn 1.0 1.0 75.0 1.5 112.5 1.5MTR Bystander Doffing (M&F) - Toilet 2.0 1.0 5.0 2.1 21.0 2.1MTR Bystander Donning (M&F) - Toilet 2.0 1.0 5.0 2.1 21.0 2.1MTR Staff Donning (M&F) - Toilet 2.0 1.0 5.0 2.1 21.0 2.1MTR Staff Doffing (M&F) - Toilet 2.0 1.0 5.0 2.1 21.0 2.1MTR Store 2.0 1.0 6.1 0.15 1.8299999999999998 SKIRTING Screening 1.0 1.0 40.0 1.5 60.0 1.5MTR FIRST FLOOR 0.0 Fire stair 2.0 1.0 12.0 0.15 3.5999999999999996 SKIRTING Janitor 1.0 1.0 10.8 0.15 1.62 SKIRTING Store 1.0 1.0 10.8 0.15 1.62 SKIRTING Staff Toilet 1.0 1.0 14.5 2.1 30.450000000000003 2.1MTR Staff Doffing-Shower 1.0 1.0 7.6 2.1 15.959999999999999 2.1MTR Staff Doffing-Toilet 2.0 1.0 5.6 2.1 23.52 2.1MTR Electrical room 1.0 1.0 15.8 0.15 2.37 SKIRTING UPS Room 1.0 1.0 10.7 0.15 1.6049999999999998 SKIRTING 3.3m wide corridor infront of lift & janitor room 1.0 1.0 62.0 1.5 93.0 1.5MTR DU 1.0 2.0 8.4 2.1 35.28 2.1MTR Toilet 2.0 2.0 5.0 2.1 42.0 2.1MTR Area infront of DU & Toilet 1.0 2.0 13.7 2.1 57.54 2.1MTR Ward (5 beds) - M&F 2.0 1.0 27.0 1.5 81.0 1.5MTR Nurses lounge 1.0 1.0 19.6 1.5 29.400000000000002 1.5MTR Staff Dining 1.0 1.0 24.95 1.5 37.425 1.5MTR Doctors lounge 1.0 1.0 50.787499999999994 1.5 76.18124999999999 1.5MTR 3m wide corridor infront of lift & store room 1.0 1.0 58.0 1.5 87.0 1.5MTR 3.3m wide corridor near Bystander waiting 2.0 1.0 67.0 1.5 201.0 1.5MTR Area infront of Procedure room 2.0 1.0 19.05 1.5 57.150000000000006 1.5MTR Clean utility 2.0 1.0 7.92 0.15 2.376 SKIRTING Sterile store 2.0 1.0 7.93 0.15 2.379 SKIRTING Procedure room 1.0 1.0 25.1 1.5 37.650000000000006 1.5MTR Bystander Toilet 1.0 1.0 11.4 2.1 23.94 2.1MTR Bystander Toilet - Toilet 2.0 1.0 5.6 2.1 23.52 2.1MTR Bystander Toilet - Shower 1.0 1.0 7.6 2.1 15.959999999999999 2.1MTR AHU Room 1.0 1.0 24.1 0.15 3.615 SKIRTING DU Store 1.0 1.0 5.55 2.1 11.655 2.1MTR General store 1.0 1.0 5.55 2.1 11.655 2.1MTR Isolation room 1 to 10 10.0 1.0 15.9 1.5 238.5 1.5MTR Isolation room 1 to 10 - Toilet 10.0 1.0 6.0 2.1 126.0 2.1MTR Area infront of Isolation room 1 to 10 10.0 1.0 8.85 1.5 132.75 1.5MTR SECOND FLOOR 0.0 Fire stair 2.0 1.0 12.0 0.15 3.5999999999999996 SKIRTING Janitor 1.0 1.0 10.8 0.15 1.62 SKIRTING Store 1.0 1.0 10.8 0.15 1.62 SKIRTING Staff Toilet 1.0 1.0 14.5 2.1 30.450000000000003 2.1MTR Staff Toilet-Shower 1.0 1.0 7.6 2.1 15.959999999999999 2.1MTR Staff Toilet-Toilet 2.0 1.0 5.6 2.1 23.52 2.1MTR Electrical room 1.0 1.0 15.8 0.15 2.37 SKIRTING UPS Room 1.0 1.0 10.7 0.15 1.6049999999999998 SKIRTING Isolation room 1 to 20 20.0 1.0 15.9 1.5 477.0 1.5MTR Isolation room 1 to 20 - Toilet 20.0 1.0 6.0 2.1 252.0 2.1MTR Area infront of Isolation room 1 to 20 10.0 1.0 8.85 1.5 132.75 1.5MTR 3.3m wide corridor infront of clean utility & sterile room 1.0 1.0 67.0 1.5 100.5 1.5MTR 3.3m wide corridor infront of clean utility & sterile room 1.0 1.0 80.45 1.5 120.67500000000001 1.5MTR Clean utility 2.0 1.0 7.92 0.15 2.376 SKIRTING Sterile store 2.0 1.0 7.93 0.15 2.379 SKIRTING Procedure room 1.0 1.0 25.1 1.5 37.650000000000006 1.5MTR Area infront of Procedure room 2.0 1.0 19.05 1.5 57.150000000000006 1.5MTR 3.3m wide corridor infront of lift & janitor room 1.0 1.0 62.0 1.5 93.0 1.5MTR 3m wide corridor infront of lift & store room 1.0 1.0 58.0 1.5 87.0 1.5MTR Staff Toilet 1.0 1.0 11.4 2.1 23.94 2.1MTR Staff Toilet - Toilet 2.0 1.0 5.6 2.1 23.52 2.1MTR Staff Toilet - Shower 1.0 1.0 7.6 2.1 15.959999999999999 2.1MTR AHU Room 1.0 1.0 24.1 0.15 3.615 SKIRTING TERRACE FLOOR Fire stair 2.0 1.0 28.0 0.15 8.4 SKIRTING GROUND FLOOR INTERNAL 20CM D1 4.0 1.0 1.5 6.0 FD 3.0 1.0 1.5 4.5 FD1 1.0 1.0 1.0 1.0 FIRST FLOOR INTERNAL 20CM FD 3.0 1.0 1.5 4.5 D3 6.0 1.0 1.0 6.0 SECOND FLOOR INTERNAL 20CM D3 3.0 1.0 1.0 3.0 TERRACE FLOOR INTERNAL 20CM D1 2.0 1.0 1.5 3.0 TOTAL 6.0 cum SAY 6.0 cum 6.300000000000001 GROUND FLOOR X DIRECTION By stander - Doffing (F)&(M)-Toilet 2.0 1.0 1.3 0.1 4.07 1.0582 2.6 By stander - Doffing (F) 1.0 1.0 4.2 0.1 4.07 1.7094000000000003 4.2 By stander - Doffing (F) 1.0 1.0 2.6 0.1 4.07 1.0582 2.6 By stander - Donning (F) & (M) 1.0 1.0 2.6 0.1 4.07 1.0582 2.6 do 2.0 1.0 1.3 0.1 4.07 1.0582 2.6 do 1.0 1.0 4.4 0.1 4.07 1.7908000000000004 4.4 Staff Donning - M 1.0 1.0 4.2 0.1 4.07 1.7094000000000003 4.2 Staff Donning - M & F - Toilet 2.0 1.0 1.3 0.1 4.07 1.0582 2.6 DO 1.0 1.0 2.6 0.1 4.07 1.0582 2.6 Change 1.0 1.0 4.1 0.1 4.07 1.6687 4.1 do 3.0 1.0 1.4 0.1 4.07 1.7093999999999998 4.199999999999999 Female & Male toilet 1.0 1.0 6.1 0.1 4.07 2.4827 6.1 do 3.0 1.0 2.9 0.1 4.07 3.5409 8.7 Store / office 1.0 1.0 2.7 0.1 4.07 1.0989000000000002 2.7 Staff Doffing-M&F 1.0 1.0 4.2 0.1 4.07 1.7094000000000003 4.2 do 1.0 1.0 2.6 0.1 4.07 1.0582 2.6 do 2.0 1.0 1.3 0.1 4.07 1.0582 2.6 Electrical room 2.0 1.0 5.0 0.1 4.07 4.07 10.0 Ele to FHC 1.0 1.0 3.4 0.1 4.07 1.3838000000000001 3.4 Toilet to toilet 1.0 1.0 3.1 0.1 4.07 1.2617000000000003 3.1 USG RM-Toilet 1.0 1.0 1.5 0.1 4.07 0.6105000000000002 1.5 Y DIRECTION 0.0 By stander - Doffing (F)&(M) 2.0 1.0 6.05 0.1 4.07 4.9247000000000005 12.1 By stander - Doffing (F)&(M)-Toilet 2.0 1.0 1.4 0.1 4.07 1.1396 2.8 By stander - Donning (F) & (M) 1.0 1.0 6.25 0.1 4.07 2.54375 6.25 do 2.0 1.0 6.05 0.1 4.07 4.9247000000000005 12.1 do 2.0 1.0 1.4 0.1 4.07 1.1396 2.8 Staff Donning - M 1.0 1.0 6.05 0.1 4.07 2.4623500000000003 6.05 do 1.0 1.0 4.7 0.1 4.07 1.9129000000000003 4.7 Staff Donning - M & F - Toilet 2.0 1.0 1.4 0.1 4.07 1.1396 2.8 Change 1.0 1.0 5.1 0.1 4.07 2.0757000000000003 5.1 Female & Male toilet 2.0 1.0 4.2 0.1 4.07 3.4188000000000005 8.4 do 1.0 1.0 4.45 0.1 4.07 1.8111500000000005 4.45 Store to office 1.0 1.0 5.85 0.1 4.07 2.38095 5.85 Staff Doffing-M&F 2.0 1.0 6.05 0.1 4.07 4.9247000000000005 12.1 do 2.0 1.0 1.4 0.1 4.07 1.1396 2.8 UPS Room 1.0 1.0 2.45 0.1 4.07 0.9971500000000002 2.45 Staff toilet to Electrical room 1.0 1.0 7.1 0.1 4.07 2.8897 7.1 Toilet to Fire ctrl room 1.0 1.0 4.9 0.1 4.07 1.9943000000000004 4.9 Ele /ELV/ Fire/FHC 4.0 1.0 0.9 0.1 4.07 1.4652000000000003 3.6 Fire ctrl room 1.0 1.0 2.2 0.1 4.07 0.8954000000000002 2.2 Toilet / toilet 1.0 1.0 1.3 0.1 4.07 0.5291 1.3 Male toilet 1.0 1.0 6.1 0.1 4.07 2.4827 6.1 USG RM-Toilet 1.0 1.0 2.2 0.1 4.07 0.8954000000000002 2.2 X DIRECTION 0.0 Screening 1.0 1.0 6.7 0.1 4.07 2.7269000000000005 6.7 Screening-Store 4.0 1.0 1.6 0.1 4.07 2.604800000000001 6.4 do 6.0 1.0 1.2 0.1 4.07 2.9304 7.199999999999999 Consultation room to Procedure RM 1.0 1.0 17.3 0.1 4.07 7.041100000000001 17.3 do 1.0 1.0 2.7 0.1 4.07 1.0989000000000002 2.7 Accounts 1.0 1.0 6.6 0.1 4.07 2.6862000000000004 6.6 Y DIRECTION 0.0 Screening 2.0 1.0 6.0 0.1 4.07 4.884000000000001 12.0 Screening-Store 2.0 1.0 1.7 0.1 4.07 1.3838000000000001 3.4 Consultation room /Procedure RM 3.0 1.0 4.05 0.1 4.07 4.94505 12.149999999999999 Plumbing duct 9.0 1.0 4.1 0.1 4.2 15.498000000000001 36.9 Plumbing duct 2.0 1.0 3.2 0.1 4.2 2.6880000000000006 6.4 HVAC Duct 1.0 1.0 3.1 0.1 4.2 1.3020000000000003 3.1 FIRST FLOOR 0.0 X DIRECTION 0.0 Staff Donning 2.0 1.0 5.0 0.1 4.07 4.07 10.0 Staff Donning - Toilet 1.0 1.0 1.4 0.1 4.07 0.5698 1.4 Ele to FHC 1.0 1.0 3.5 0.1 4.07 1.4245000000000003 3.5 Electrical room 1.0 1.0 5.0 0.1 4.07 2.035 5.0 DU 4.0 1.0 2.2 0.1 4.07 3.581600000000001 8.8 Toilet 4.0 1.0 1.4 0.1 4.07 2.2792 5.6 Staff Dining 1.0 1.0 1.7 0.1 4.07 0.6919000000000001 1.7 Isolation 1 to 10 - Toilet 5.0 2.0 1.7 0.1 4.07 6.919000000000001 17.0 DU Store/General store 3.0 1.0 1.6 0.1 4.07 1.9536000000000004 4.800000000000001 Bystander Toilet 2.0 1.0 5.0 0.1 4.07 4.07 10.0 FHC 2.0 1.0 1.9 0.1 4.07 1.5466000000000002 3.8 Y DIRECTION 0.0 Staff Donning To UPS Room 1.0 1.0 9.55 0.1 4.07 3.8868500000000004 9.55 Shower 1.0 1.0 2.2 0.1 4.07 0.8954000000000002 2.2 Ele/ELV/Fire/ FHC 4.0 1.0 0.9 0.1 4.07 1.4652000000000003 3.6 DU to Toilet 4.0 1.0 6.05 0.1 4.07 9.849400000000001 24.2 Toilet 2.0 1.0 2.6 0.1 4.07 2.1164 5.2 Staff Dining 1.0 1.0 1.6 0.1 4.07 0.6512000000000002 1.6 Isolation 1 to 10 - Toilet 5.0 2.0 3.2 0.1 4.07 13.024000000000001 32.0 Isolation 1 to 10 5.0 1.0 2.85 0.1 4.07 5.79975 14.25 AHU to Bystander toilet 1.0 1.0 9.55 0.1 4.07 3.8868500000000004 9.55 DU Store/General store 1.0 1.0 2.85 0.1 4.07 1.1599500000000003 2.85 Bystander Toilet-shower 1.0 1.0 2.2 0.1 4.07 0.8954000000000002 2.2 Bystander Toilet-Toilet 1.0 1.0 1.4 0.1 4.07 0.5698 1.4 FHC 1.0 1.0 0.51 0.1 4.07 0.20757000000000003 0.51 Nurse station 1.0 1.0 6.0 0.1 4.07 2.4420000000000006 6.0 X DIRECTION 0.0 Isolation room 1 to 10 10.0 1.0 3.3 0.1 4.07 13.431000000000003 33.0 Isolation room 1 to 10 1.0 1.0 33.5 0.1 4.07 13.634500000000001 33.5 Clean utility, Sterile store 3.0 2.0 1.65 0.1 4.07 4.0293 9.899999999999999 Procedure room 2.0 1.0 7.1 0.1 4.07 5.7794 14.2 Nurses lounge to doctors lounge 1.0 1.0 13.2 0.1 4.07 5.372400000000001 13.2 Ward (5+5 beds) 1.0 1.0 14.7 0.1 4.07 5.9829 14.7 Y DIRECTION 0.0 Isolation room 1 to 3.3m wide corridor 1.0 1.0 18.05 0.1 4.07 7.346350000000001 18.05 Isolation room 1 to 10 4.0 1.0 6.1 0.1 4.07 9.9308 24.4 Isolation room 10 to 10 1.0 1.0 24.1 0.1 4.07 9.808700000000002 24.1 Clean utility to Sterile store 2.0 1.0 5.15 0.1 4.07 4.192100000000001 10.3 3.3m Wide corridor 4.0 1.0 3.1 0.1 4.07 5.046800000000001 12.4 doctors lounge/staff dining 1.0 1.0 6.05 0.1 4.07 2.4623500000000003 6.05 Nurses lounge/staff dining 1.0 1.0 4.5 0.1 4.07 1.8315000000000001 4.5 Ward (5+5 beds) 1.0 1.0 5.975 0.1 4.07 2.4318250000000003 5.975 Plumbing duct 9.0 1.0 4.1 0.1 4.2 15.498000000000001 36.9 Plumbing duct 2.0 1.0 3.2 0.1 4.2 2.6880000000000006 6.4 HVAC Duct 1.0 1.0 3.1 0.1 4.2 1.3020000000000003 3.1 FIRST FLOOR 0.0 0.0 0.0 Isolation room 1 to 10 2.0 10.0 0.6 0.1 0.85 1.02 12.0 1.0 2.0 DU Store/General store 2.0 2.0 0.6 0.1 0.85 0.204 2.4 1.0 2.0 Bystanders toilet 2.0 1.0 0.6 0.1 0.85 0.102 1.2 1.0 2.0 DU Toilet 2.0 2.0 0.6 0.1 0.85 0.204 2.4 1.0 2.0 Staff doffing 2.0 1.0 0.6 0.1 0.85 0.102 1.2 1.0 2.0 Nurse station 18.0 2.0 0.6 0.1 0.85 1.8359999999999996 21.599999999999998 1.0 18.0 Procedure room 9.0 1.0 0.6 0.1 0.85 0.4589999999999999 5.3999999999999995 1.0 9.0 SECOND FLOOR 0.0 2.6569 2.8899999999999997 X DIRECTION 0.0 23 23 Electrical room 1.0 1.0 5.0 0.1 4.07 2.035 5.0 Ele to FHC 1.0 1.0 3.5 0.1 4.07 1.4245000000000003 3.5 Staff toilet 2.0 1.0 5.0 0.1 4.07 4.07 10.0 Isolation room 1 to 20 20.0 2.0 3.2 0.1 4.07 52.096000000000004 128.0 Shower to Toilet 2.0 1.0 5.0 0.1 4.07 4.07 10.0 DU Store /General store 3.0 1.0 1.7 0.1 4.07 2.0757000000000003 5.1 Isolation room 1 to 10 & Isolation room 10 to 20 4.0 1.0 33.5 0.1 4.07 54.538000000000004 134.0 FHC 2.0 1.0 1.9 0.1 4.07 1.5466000000000002 3.8 Y DIRECTION 0.0 UPS Room 1.0 1.0 2.45 0.1 4.07 0.9971500000000002 2.45 Ele/ELV/Fire/FHC 4.0 1.0 0.9 0.1 4.07 1.4652000000000003 3.6 Staff toilet to Electrical room 1.0 1.0 7.1 0.1 4.07 2.8897 7.1 Shower 2.0 1.0 2.2 0.1 4.07 1.7908000000000004 4.4 Shower-Toilet 2.0 1.0 1.4 0.1 4.07 1.1396 2.8 Isolation room 1 to 20 20.0 2.0 1.7 0.1 4.07 27.676000000000005 68.0 AHU to Staff toilet 1.0 1.0 9.55 0.1 4.07 3.8868500000000004 9.55 DU Store to General store 1.0 1.0 2.85 0.1 4.07 1.1599500000000003 2.85 Isolation room 1 to 20 5.0 1.0 2.9 0.1 4.07 5.901500000000001 14.5 FHC 1.0 1.0 0.5 0.1 4.07 0.20350000000000001 0.5 X DIRECTION 0.0 23 23 Isolation room 1 to 10 & Isolation room 10 to 20 4.0 1.0 33.5 0.1 4.07 54.538000000000004 134.0 Clean utility / Sterile store 3.0 2.0 1.6 0.1 4.07 3.907200000000001 9.600000000000001 Y DIRECTION 0.0 Isolation room 1 to 20 1.0 1.0 24.1 0.1 4.07 9.808700000000002 24.1 Isolation room 10 to 11 1.0 1.0 24.1 0.1 4.07 9.808700000000002 24.1 Isolation rom 1 to 20 8.0 1.0 6.1 0.1 4.07 19.8616 48.8 Clean utility to Sterile store 1.0 2.0 5.15 0.1 4.07 4.192100000000001 10.3 Plumbing duct 9.0 1.0 4.1 0.1 4.2 15.498000000000001 36.9 Plumbing duct 2.0 1.0 3.2 0.1 4.2 2.6880000000000006 6.4 HVAC Duct 1.0 1.0 3.1 0.1 4.2 1.3020000000000003 3.1 TERRACE FLOOR 0.0 X DIRECTION 0.0 Plumbing duct 9.0 1.0 4.1 0.1 1.5 5.535 36.9 Plumbing duct 2.0 1.0 3.2 0.1 1.5 0.9600000000000002 6.4 HVAC Duct 1.0 1.0 3.1 0.1 1.5 0.4650000000000001 3.1 Parapet over headroom 2.0 1.0 42.0 0.1 0.3 2.52 84.0 Ele to HVAC duct 1.0 1.0 9.2 0.1 1.5 1.38 9.2 JOINERIES GROUND FLOOR GROUND FLOOR External 20cm MD ( 2000mm wide 12mm thick frameless toughened glass sliding door + 1500 mm wide 12 mm thick fixed toughened glass on both sides) 1.0 1.0 5.0 2.4 12.0 D ( Aluminium Double swing Door) 2.0 1.0 1.8 2.25 8.1 FD ( Fire Rated Door - Double door) 1.0 1.0 1.8 2.25 4.05 GD ( Toughend glass door ) 1.0 1.0 1.5 2.4 3.5999999999999996 V ( UPVC Ventillator ) 2.0 1.0 1.2 0.6 1.44 V1 ( UPVC Ventillator ) 2.0 1.0 0.9 0.6 1.08 V2 ( UPVC Ventillator ) 5.0 1.0 0.6 0.6 1.7999999999999998 W ( UPVC sliding window) 20.0 1.0 1.8 1.5 54.0 W1 ( UPVC sliding window) 5.0 1.0 1.5 1.5 11.25 W2 ( UPVC sliding window)- sill height :1400 mm 5.0 1.0 1.8 0.85 7.6499999999999995 W3 ( UPVC sliding window) 1.0 1.0 1.2 1.5 1.7999999999999998 RS1 ( Rolling shutter ) 1.0 1.0 3.0 2.4 7.199999999999999 INTERNAL 20cm 0.0 D ( Aluminium Double swing Door) 9.0 1.8 2.25 36.449999999999996 D1 (Half glazed Aluminium Double swing Door) 0.0 1.5 2.25 0.0 D2 - ( Aluminium Door) 2.0 1.2 2.25 5.3999999999999995 D2 \" ( Aluminium sliding door ) 1.0 1.2 2.25 2.6999999999999997 D3 ( Aluminium Double Door) 3.0 1.0 2.25 6.75 D4 ( Aluminium Door) 8.0 0.9 2.25 16.2 DD ( Duct door ) 2.0 0.6 1.8 2.16 FD ( Fire Rated Door - Double door) 2.0 1.8 2.25 8.1 FD1( Fire Door ) 1.0 1.0 FDD ( Fire Duct Door ) 2.0 0.9 1.8 3.24 Internal 10cm 0.0 D ( Aluminium Double swing Door) 2.0 1.8 2.25 8.1 D1 (Half glazed Aluminium Double swing Door) 1.0 1.5 2.25 3.375 D2 \" ( Aluminium sliding door ) 1.0 1.2 2.25 2.6999999999999997 D3 ( Aluminium Double Door) 2.0 1.0 2.25 4.5 D4 ( Aluminium Door) 9.0 0.9 2.25 18.224999999999998 D5 ( FRP) 7.0 0.8 2.1 11.760000000000002 FIRST FLOOR EXTERNAL 20 CM V ( UPVC Ventillator ) 5.0 1.2 0.6 3.5999999999999996 V2 ( UPVC Ventillator ) 13.0 0.6 0.6 4.68 W ( UPVC sliding window) 8.0 1.0 1.8 1.5 21.6 W2 ( UPVC sliding window)- sill height :1400 mm 17.0 1.8 0.85 26.01 W ( UPVC sliding window) 9.0 1.8 1.5 24.299999999999997 FG1 ( Fixed glass ) 2.0 2.9 2.15 12.469999999999999 INTERNAL 20cm D ( Aluminium Double swing Door) 3.0 1.8 2.25 12.15 D1 (Half glazed Aluminium Double swing Door) 2.0 1.5 2.25 6.75 D2 - ( Aluminium Door) 2.0 1.2 2.25 5.3999999999999995 D3 ( Aluminium Double Door) 3.0 1.0 2.25 6.75 D4 ( Aluminium Door) 2.0 0.9 2.25 4.05 D5 ( FRP) 1.0 0.8 2.1 1.6800000000000002 DD ( Duct door ) 2.0 0.6 1.8 2.16 FD ( Fire Rated Door - Double door) 1.0 1.8 2.25 4.05 FD1( Fire Door ) 1.0 1.2 2.25 2.6999999999999997 FDD ( Fire Duct Door ) 2.0 0.9 1.8 3.24 INTERNAL 10cm 0.0 D1 (Half glazed Aluminium Double swing Door) 2.0 1.5 2.25 6.75 D3 ( Aluminium Double Door) 2.0 1.0 2.25 4.5 D4 ( Aluminium Door) 15.0 0.9 2.25 30.375 D5 ( FRP) 18.0 0.8 2.1 30.240000000000002 SECOND FLOOR External 20cm V ( UPVC Ventillator ) 4.0 1.0 1.2 0.2 0.6 0.576 V2 ( UPVC Ventillator ) 12.0 1.0 0.6 0.2 0.6 0.864 W ( UPVC sliding window) 9.0 1.0 1.8 0.2 1.5 4.86 W2 ( UPVC sliding window)- sill height :1400 mm 18.0 1.0 1.8 0.2 0.85 5.508 FG1 ( Fixed glass ) 2.0 1.0 2.9 0.2 2.15 2.4939999999999998 INTERNAL 20cm 0.0 D1 (Half glazed Aluminium Double swing Door) 3.0 1.0 1.5 0.2 2.25 2.025 D2 - ( Aluminium Door) 1.0 1.0 1.2 0.2 2.25 0.54 D3 ( Aluminium Double Door) 7.0 1.0 1.0 0.2 2.25 3.1500000000000004 D4 ( Aluminium Door) 2.0 1.0 0.9 0.2 2.25 0.81 D5 ( FRP) 1.0 1.0 0.8 0.2 2.1 0.3360000000000001 DD ( Duct door ) 2.0 1.0 0.6 0.2 1.8 0.432 FD ( Fire Rated Door - Double door) 2.0 1.0 1.8 0.2 2.25 1.62 2F FD1( Fire Door ) 1.0 1.0 1.2 0.2 2.25 0.54 FDD ( Fire Duct Door ) 2.0 1.0 0.9 0.2 1.8 0.6480000000000001 Internal 10cm 0.0 D2 \" ( Aluminium sliding door ) 1.0 1.0 1.2 0.1 2.25 0.27 D3 ( Aluminium Double Door) 2.0 1.0 1.0 0.1 2.25 0.45 D4 ( Aluminium Door) 2.0 1.0 0.9 0.1 2.25 0.405 D5 ( FRP) 28.0 1.0 0.8 0.1 2.1 4.704000000000001 D2 - ( Aluminium Door) 1.0 1.0 1.2 0.1 2.25 0.27 D4 ( Aluminium Door) 1.0 1.0 0.9 0.1 2.25 0.2025 THIRD FLOOR 0.0 EXTERNAL 20 CM 0.0 V ( UPVC Ventillator ) 5.0 1.0 1.2 0.2 0.6 0.7200000000000001 V2 ( UPVC Ventillator ) 8.0 1.0 0.6 0.2 0.6 0.576 W ( UPVC sliding window) 6.0 1.0 1.8 0.2 1.5 3.24 W2 ( UPVC sliding window)- sill height :1400 mm 20.0 1.0 1.8 0.2 0.85 6.12 W3 ( UPVC sliding window) 1.0 1.0 1.2 0.2 1.5 0.36 FG1 ( Fixed glass ) 2.0 1.0 2.9 0.2 2.15 2.4939999999999998 INTERNAL 20 CM 0.0 D ( Aluminium Double swing Door) 5.0 1.0 1.8 0.2 2.25 4.05 D1 (Half glazed Aluminium Double swing Door) 1.0 1.0 1.5 0.2 2.25 0.675 D2 - ( Aluminium Door) 1.0 1.0 1.2 0.2 2.25 0.54 D3 ( Aluminium Double Door) 2.0 1.0 1.0 0.2 2.25 0.9 D5 ( FRP) 1.0 1.0 0.8 0.2 2.1 0.3360000000000001 DD ( Duct door ) 2.0 1.0 0.6 0.2 1.8 0.432 FD ( Fire Rated Door - Double door) 1.0 1.0 1.8 0.2 2.25 0.81 3F FD1( Fire Door ) 1.0 1.0 1.2 0.2 2.25 0.54 FDD ( Fire Duct Door ) 2.0 1.0 0.9 0.2 1.8 0.6480000000000001 INTERNAL 10 CM 0.0 D2 - ( Aluminium Door) 5.0 1.0 1.2 0.1 2.25 1.35 D2 \" ( Aluminium sliding door ) 1.0 1.0 1.2 0.1 2.25 0.27 D3 ( Aluminium Double Door) 3.0 1.0 1.0 0.1 2.25 0.675 D4 ( Aluminium Door) 10.0 1.0 0.9 0.1 2.25 2.025 D5 ( FRP) 22.0 1.0 0.8 0.1 2.1 3.6960000000000006 FOURTH FLOOR 0.0 External 20cm 0.0 V ( UPVC Ventillator ) 2.0 1.0 1.2 0.2 0.6 0.288 V2 ( UPVC Ventillator ) 9.0 1.0 0.6 0.2 0.6 0.6479999999999999 W ( UPVC sliding window) 11.0 1.0 1.8 0.2 1.5 5.94 W2 ( UPVC sliding window)- sill height :1400 mm 6.0 1.0 1.8 0.2 0.85 1.836 FG1 ( Fixed glass ) 2.0 1.0 2.9 0.2 2.15 2.4939999999999998 INTERNAL 20cm D ( Aluminium Double swing Door) 3.0 1.0 1.8 0.2 2.25 2.43 D1 (Half glazed Aluminium Double swing Door) 1.0 1.0 1.5 0.2 2.25 0.675 D2 - ( Aluminium Door) 2.0 1.0 1.2 0.2 2.25 1.08 D3 ( Aluminium Double Door) 1.0 1.0 1.0 0.2 2.25 0.45 D4 ( Aluminium Door) 4.0 1.0 0.9 0.2 2.25 1.62 DD ( Duct door ) 2.0 1.0 0.6 0.2 1.8 0.432 FD ( Fire Rated Door - Double door) 2.0 1.0 1.8 0.2 2.25 1.62 FDD ( Fire Duct Door ) 2.0 1.0 0.9 0.2 1.8 0.6480000000000001 SD (Sliding Aluminium door) 2.0 1.0 1.5 0.2 2.25 1.35 INTERNAL 10cm SD (Sliding Aluminium door) 2.0 1.0 1.5 0.2 2.25 1.35 D ( Aluminium Double swing Door) 6.0 1.0 1.8 0.2 2.25 4.86 D2 - ( Aluminium Door) 2.0 1.0 1.2 0.1 2.25 0.54 D3 ( Aluminium Double Door) 3.0 1.0 1.0 0.1 2.25 0.675 D4 ( Aluminium Door) 28.0 1.0 0.9 0.1 2.25 5.67 D5 ( FRP) 9.0 1.0 0.8 0.1 2.1 1.5120000000000002 TERRACE FLOOR EXTERNAL 20cm D4 ( Aluminium Door) 3.0 1.0 0.9 0.2 2.25 1.215 W ( UPVC sliding window) 1.0 1.0 1.8 0.2 1.5 0.54 JOINERIES GROUND FLOOR GROUND FLOOR External 20cm MD ( 2000mm wide 12mm thick frameless toughened glass sliding door + 1500 mm wide 12 mm thick fixed toughened glass on both sides) 1.0 1.0 5.0 2.4 12.0 Toughened glass door D ( Aluminium Double swing Door) 2.0 1.0 1.8 2.25 8.1 Al DOUBLE SWING FD ( Fire Rated Door - Double door) 1.0 1.0 1.8 2.25 4.05 fire door GD ( Toughend glass door ) 1.0 1.0 2.8 2.4 6.72 Toughened glass door V ( UPVC Ventillator ) 2.0 1.0 1.2 0.6 1.44 UPVC VENT 0.72 V1 ( UPVC Ventillator ) 2.0 1.0 0.9 0.6 1.08 UPVC VENT 0.54 V2 ( UPVC Ventillator ) 5.0 1.0 0.6 0.6 1.7999999999999998 UPVC VENT 0.36 W ( UPVC sliding window) 20.0 1.0 1.8 1.5 54.0 UPVC SLIDING 3 PANEL 2.7 W1 ( UPVC sliding window) 5.0 1.0 1.5 1.5 11.25 UPVC SLIDING 3 PANEL 2.25 W2 ( UPVC sliding window)- sill height :1400 mm 5.0 1.0 1.8 0.85 7.6499999999999995 UPVC SLIDING 3 PANEL 1.53 W3 ( UPVC sliding window) 1.0 1.0 1.2 1.5 1.7999999999999998 UPVC SLIDING 2 PANEL 1.7999999999999998 RS1 ( Rolling shutter ) 1.0 1.0 3.0 2.4 7.199999999999999 ROLLING SHUTTER INTERNAL 20cm D ( Aluminium Double swing Door) 9.0 1.8 2.25 36.449999999999996 Al DOUBLE SWING D1 (Half glazed Aluminium Double swing Door) 0.0 1.5 2.25 0.0 Haf glazed Al DOUBLE SWING D2 - ( Aluminium Door) 2.0 1.2 2.25 5.3999999999999995 AL DOOR D2 \" ( Aluminium sliding door ) 1.0 1.2 2.25 2.6999999999999997 AL SLIDING DOOR D3 ( Aluminium Door) 3.0 1.0 2.25 6.75 AL DOOR D4 ( Aluminium Door) 8.0 0.9 2.25 16.2 AL DOOR DD ( Duct door ) 2.0 0.6 1.8 2.16 DUCT DOOR FD ( Fire Rated Door - Double door) 2.0 1.8 2.25 8.1 fire door FD1( Fire Door ) 1.0 1.2 2.25 2.6999999999999997 fire door FDD ( Fire Duct Door ) 2.0 0.9 1.8 3.24 DUCT DOOR Internal 10cm D ( Aluminium Double swing Door) 2.0 1.8 2.25 8.1 Al DOUBLE SWING D1 (Half glazed Aluminium Double swing Door) 1.0 1.5 2.25 3.375 Haf glazed Al DOUBLE SWING D2 \" ( Aluminium sliding door ) 1.0 1.2 2.25 2.6999999999999997 AL SLIDING DOOR D3 ( Aluminium Door) 2.0 1.0 2.25 4.5 AL DOOR D4 ( Aluminium Door) 9.0 0.9 2.25 18.224999999999998 AL DOOR D5 ( FRP) 7.0 0.8 2.1 11.760000000000002 FRP FIRST FLOOR FIRST FLOOR 0.0 EXTERNAL 20 CM V ( UPVC Ventillator ) 5.0 1.2 0.6 3.5999999999999996 UPVC VENT 0.72 V2 ( UPVC Ventillator ) 13.0 0.6 0.6 4.68 UPVC VENT 0.36 W ( UPVC sliding window) 8.0 1.0 1.8 1.5 21.6 UPVC SLIDING 3 PANEL 2.7 W2 ( UPVC sliding window)- sill height :1400 mm 17.0 1.8 0.85 26.01 UPVC SLIDING 3 PANEL 1.53 W ( UPVC sliding window) 9.0 1.8 1.5 24.299999999999997 UPVC SLIDING 3 PANEL 2.7 FG1 ( Fixed glass ) 2.0 2.9 2.15 12.469999999999999 FIXED GLASSS INTERNAL 20cm D ( Aluminium Double swing Door) 3.0 1.8 2.25 12.15 Al DOUBLE SWING D1 (Half glazed Aluminium Double swing Door) 2.0 1.5 2.25 6.75 Haf glazed Al DOUBLE SWING D2 - ( Aluminium Door) 2.0 1.2 2.25 5.3999999999999995 AL DOOR D3 ( Aluminium Door) 3.0 1.0 2.25 6.75 AL DOOR D4 ( Aluminium Door) 2.0 0.9 2.25 4.05 AL DOOR D5 ( FRP) 1.0 0.8 2.1 1.6800000000000002 FRP DD ( Duct door ) 2.0 0.6 1.8 2.16 DUCT DOOR FD ( Fire Rated Door - Double door) 1.0 1.8 2.25 4.05 FIRE DOOR FD1( Fire Door ) 1.0 1.2 2.25 2.6999999999999997 FIRE DOOR FDD ( Fire Duct Door ) 2.0 0.9 1.8 3.24 FIRE DOOR INTERNAL 10cm D1 (Half glazed Aluminium Double swing Door) 2.0 1.5 2.25 6.75 Haf glazed Al DOUBLE SWING D3 ( Aluminium Door) 2.0 1.0 2.25 4.5 AL DOOR D4 ( Aluminium Door) 15.0 0.9 2.25 30.375 AL DOOR D5 ( FRP) 18.0 0.8 2.1 30.240000000000002 FRP SECOND FLOOR SECOND FLOOR 0.0 External 20cm V ( UPVC Ventillator ) 4.0 1.0 1.2 0.6 2.88 UPVC VENT 0.72 V2 ( UPVC Ventillator ) 12.0 1.0 0.6 0.6 4.319999999999999 UPVC VENT 0.36 W ( UPVC sliding window) 15.0 1.0 1.8 1.5 40.5 UPVC SLIDING 3 PANEL 2.7 W2 ( UPVC sliding window)- sill height :1400 mm 12.0 1.0 1.8 0.85 18.36 UPVC SLIDING 3 PANEL 1.53 FG1 ( Fixed glass ) 2.0 1.0 2.9 2.15 12.469999999999999 FIXED GLASS INTERNAL 20cm D1 (Half glazed Aluminium Double swing Door) 3.0 1.0 1.5 2.25 10.125 Haf glazed Al DOUBLE SWING D2 - ( Aluminium Door) 1.0 1.0 1.2 2.25 2.6999999999999997 AL DOOR D3 ( Aluminium Door) 7.0 1.0 1.0 2.25 15.75 AL DOOR D4 ( Aluminium Door) 2.0 1.0 0.9 2.25 4.05 AL DOOR D5 ( FRP) 1.0 1.0 0.8 2.1 1.6800000000000002 FRP DD ( Duct door ) 2.0 1.0 0.6 1.8 2.16 DUCT DOOR FD ( Fire Rated Door - Double door) 2.0 1.0 1.8 2.25 8.1 FIRE DOOR 2F FD1( Fire Door ) 1.0 1.0 1.2 2.25 2.6999999999999997 FIRE DOOR FDD ( Fire Duct Door ) 2.0 1.0 0.9 1.8 3.24 DUCT DOOR Internal 10cm D2 \" ( Aluminium sliding door ) 1.0 1.0 1.2 2.25 2.6999999999999997 AL SLIDING DOOR D3 ( Aluminium Door) 2.0 1.0 1.0 2.25 4.5 AL DOOR D4 ( Aluminium Door) 2.0 1.0 0.9 2.25 4.05 AL DOOR D5 ( FRP) 28.0 1.0 0.8 2.1 47.040000000000006 FRP D2 - ( Aluminium Door) 1.0 1.0 1.2 2.25 2.6999999999999997 AL DOOR D4 ( Aluminium Door) 1.0 1.0 0.9 2.25 2.025 AL DOOR THIRD FLOOR 0.0 THIRD FLOOR 0.0 EXTERNAL 20 CM 0.0 V ( UPVC Ventillator ) 5.0 1.0 1.2 0.6 3.5999999999999996 UPVC VENT 0.72 V2 ( UPVC Ventillator ) 8.0 1.0 0.6 0.6 2.88 UPVC VENT 0.36 W ( UPVC sliding window) 6.0 1.0 1.8 1.5 16.200000000000003 UPVC SLIDING 3 PANEL 2.7 W2 ( UPVC sliding window)- sill height :1400 mm 20.0 1.0 1.8 0.85 30.599999999999998 UPVC SLIDING 3 PANEL 1.53 W3 ( UPVC sliding window) 1.0 1.0 1.2 1.5 1.7999999999999998 UPVC SLIDING 2 PANEL 1.7999999999999998 FG1 ( Fixed glass ) 2.0 1.0 2.9 2.15 12.469999999999999 FIXED GLASS INTERNAL 20 CM 0.0 D ( Aluminium Double swing Door) 5.0 1.0 1.8 2.25 20.25 Al DOUBLE SWING D1 (Half glazed Aluminium Double swing Door) 1.0 1.0 1.5 2.25 3.375 Haf glazed Al DOUBLE SWING D2 - ( Aluminium Door) 1.0 1.0 1.2 2.25 2.6999999999999997 AL DOOR D3 ( Aluminium Door) 2.0 1.0 1.0 2.25 4.5 AL DOOR D5 ( FRP) 1.0 1.0 0.8 2.1 1.6800000000000002 FRP DD ( Duct door ) 2.0 1.0 0.6 1.8 2.16 DUCT DOOR FD ( Fire Rated Door - Double door) 1.0 1.0 1.8 2.25 4.05 FIRE DOOR 3F FD1( Fire Door ) 1.0 1.0 1.2 2.25 2.6999999999999997 FIRE DOOR FDD ( Fire Duct Door ) 2.0 1.0 0.9 1.8 3.24 DUCT DOOR INTERNAL 10 CM D2 - ( Aluminium Door) 5.0 1.0 1.2 2.25 13.5 AL DOOR D2 \" ( Aluminium sliding door ) 1.0 1.0 1.2 2.25 2.6999999999999997 AL SLIDING DOOR D3 ( Aluminium Door) 3.0 1.0 1.0 2.25 6.75 AL DOOR D4 ( Aluminium Door) 10.0 1.0 0.9 2.25 20.25 AL DOOR D5 ( FRP) 22.0 1.0 0.8 2.1 36.96000000000001 FRP FOURTH FLOOR 0.0 FOURTH FLOOR 0.0 External 20cm 0.0 V ( UPVC Ventillator ) 2.0 1.0 1.2 0.6 1.44 UPVC VENT 0.72 V2 ( UPVC Ventillator ) 9.0 1.0 0.6 0.6 3.2399999999999998 UPVC VENT 0.36 W ( UPVC sliding window) 11.0 1.0 1.8 1.5 29.700000000000003 UPVC SLIDING 3 PANEL 2.7 W2 ( UPVC sliding window)- sill height :1400 mm 6.0 1.0 1.8 0.85 9.18 UPVC SLIDING 3 PANEL 1.53 FG1 ( Fixed glass ) 2.0 1.0 2.9 2.15 12.469999999999999 FIXED GLASS INTERNAL 20cm D ( Aluminium Double swing Door) 3.0 1.0 1.8 2.25 12.15 Al DOUBLE SWING D1 (Half glazed Aluminium Double swing Door) 1.0 1.0 1.5 2.25 3.375 Haf glazed Al DOUBLE SWING D2 - ( Aluminium Door) 2.0 1.0 1.2 2.25 5.3999999999999995 AL DOOR D3 ( Aluminium Door) 1.0 1.0 1.0 2.25 2.25 AL DOOR D4 ( Aluminium Door) 4.0 1.0 0.9 2.25 8.1 AL DOOR DD ( Duct door ) 2.0 1.0 0.6 1.8 2.16 DUCT DOOR FD ( Fire Rated Door - Double door) 2.0 1.0 1.8 2.25 8.1 FIRE DOOR FDD ( Fire Duct Door ) 2.0 1.0 0.9 1.8 3.24 DUCT DOOR SD (Sliding Aluminium door) 2.0 1.0 1.5 2.25 6.75 AL SLIDING DOOR INTERNAL 10cm SD (Sliding Aluminium door) 2.0 1.0 1.5 2.25 6.75 AL SLIDING DOOR D ( Aluminium Double swing Door) 6.0 1.0 1.8 2.25 24.3 Al DOUBLE SWING D2 - ( Aluminium Door) 2.0 1.0 1.2 2.25 5.3999999999999995 AL DOOR D3 ( Aluminium Door) 3.0 1.0 1.0 2.25 6.75 AL DOOR D4 ( Aluminium Door) 28.0 1.0 0.9 2.25 56.699999999999996 AL DOOR D5 ( FRP) 9.0 1.0 0.8 2.1 15.120000000000001 FRP TERRACE FLOOR TERRACE FLOOR 0.0 EXTERNAL 20cm D4 ( Aluminium Door) 3.0 1.0 0.9 2.25 6.075 AL DOOR W ( UPVC sliding window) 1.0 1.0 1.8 0.2 1.5 0.54 UPVC SLIDING 3 PANEL 2.7 D5 ( FRP) 7.0 0.8 2.1 11.760000000000002 FRP D5 ( FRP) 1.0 0.8 2.1 1.6800000000000002 FRP D5 ( FRP) 18.0 0.8 2.1 30.240000000000002 FRP D5 ( FRP) 1.0 1.0 0.8 2.1 1.6800000000000002 FRP D5 ( FRP) 28.0 1.0 0.8 2.1 47.040000000000006 FRP D5 ( FRP) 1.0 1.0 0.8 2.1 1.6800000000000002 FRP D5 ( FRP) 22.0 1.0 0.8 2.1 36.96000000000001 FRP D5 ( FRP) 9.0 1.0 0.8 2.1 15.120000000000001 FRP GROUND FLOOR GROUND FLOOR FD ( Fire Rated Door - Double door) 1.0 1.0 1.8 2.25 4.05 fire door FD ( Fire Rated Door - Double door) 2.0 1.0 1.8 2.25 8.1 fire door FD1( Fire Door ) 1.0 1.0 1.2 2.25 2.6999999999999997 fire door FIRST FLOOR FIRST FLOOR FD ( Fire Rated Door - Double door) 1.0 1.0 1.8 2.25 4.05 FIRE DOOR FD1( Fire Door ) 1.0 1.0 1.2 2.25 2.6999999999999997 FIRE DOOR SECOND FLOOR SECOND FLOOR FD ( Fire Rated Door - Double door) 2.0 1.0 1.8 2.25 8.1 FIRE DOOR FD1( Fire Door ) 1.0 1.0 1.2 2.25 2.6999999999999997 FIRE DOOR THIRD FLOOR 0.0 THIRD FLOOR FD ( Fire Rated Door - Double door) 1.0 1.0 1.8 2.25 4.05 FIRE DOOR FD1( Fire Door ) 1.0 1.0 1.2 2.25 2.6999999999999997 FIRE DOOR FOURTH FLOOR 0.0 FOURTH FLOOR FD ( Fire Rated Door - Double door) 2.0 1.0 1.8 2.25 8.1 FIRE DOOR GROUND FLOOR GROUND FLOOR D2 - ( Aluminium Door) 2.0 1.2 2.25 5.3999999999999995 AL DOOR D3 ( Aluminium Door) 3.0 1.0 2.25 6.75 AL DOOR D4 ( Aluminium Door) 8.0 0.9 2.25 16.2 AL DOOR D3 ( Aluminium Door) 2.0 1.0 2.25 4.5 AL DOOR D4 ( Aluminium Door) 9.0 0.9 2.25 18.224999999999998 AL DOOR FIRST FLOOR FIRST FLOOR 0.0 D2 - ( Aluminium Door) 2.0 1.2 2.25 5.3999999999999995 AL DOOR D3 ( Aluminium Door) 3.0 1.0 2.25 6.75 AL DOOR D4 ( Aluminium Door) 2.0 0.9 2.25 4.05 AL DOOR D3 ( Aluminium Door) 2.0 1.0 2.25 4.5 AL DOOR D4 ( Aluminium Door) 15.0 0.9 2.25 30.375 AL DOOR SECOND FLOOR SECOND FLOOR 0.0 D2 - ( Aluminium Door) 1.0 1.0 1.2 2.25 2.6999999999999997 AL DOOR D3 ( Aluminium Door) 7.0 1.0 1.0 2.25 15.75 AL DOOR D4 ( Aluminium Door) 2.0 1.0 0.9 2.25 4.05 AL DOOR D3 ( Aluminium Door) 2.0 1.0 1.0 2.25 4.5 AL DOOR D4 ( Aluminium Door) 2.0 1.0 0.9 2.25 4.05 AL DOOR D2 - ( Aluminium Door) 1.0 1.0 1.2 2.25 2.6999999999999997 AL DOOR D4 ( Aluminium Door) 1.0 1.0 0.9 2.25 2.025 AL DOOR THIRD FLOOR 0.0 THIRD FLOOR 0.0 D2 - ( Aluminium Door) 1.0 1.0 1.2 2.25 2.6999999999999997 AL DOOR D3 ( Aluminium Door) 2.0 1.0 1.0 2.25 4.5 AL DOOR D2 - ( Aluminium Door) 5.0 1.0 1.2 2.25 13.5 AL DOOR D3 ( Aluminium Door) 3.0 1.0 1.0 2.25 6.75 AL DOOR D4 ( Aluminium Door) 10.0 1.0 0.9 2.25 20.25 AL DOOR FOURTH FLOOR 0.0 FOURTH FLOOR 0.0 D2 - ( Aluminium Door) 2.0 1.0 1.2 2.25 5.3999999999999995 AL DOOR D3 ( Aluminium Door) 1.0 1.0 1.0 2.25 2.25 AL DOOR D4 ( Aluminium Door) 4.0 1.0 0.9 2.25 8.1 AL DOOR D2 - ( Aluminium Door) 2.0 1.0 1.2 2.25 5.3999999999999995 AL DOOR D3 ( Aluminium Door) 3.0 1.0 1.0 2.25 6.75 AL DOOR D4 ( Aluminium Door) 28.0 1.0 0.9 2.25 56.699999999999996 AL DOOR TERRACE FLOOR TERRACE FLOOR 0.0 D4 ( Aluminium Door) 3.0 1.0 0.9 2.25 6.075 AL DOOR CONSTRUCTION OF BUILDING FOR INTERNATIONAL STUDENTS HOSTEL & GIRLS HOSTEL THRIKKAKKARA CAMPUS OF COCHIN UNIVERSITY OF SCIENCE & TECHNOLOGY Tender No. HITES/IDS/CUSAT/25/22 (e-tender ID: 2025_HITES_820592_1) Name of the bidder Volume V-BOQGENERAL ABSTRACT SL.No DESCRIPTION AMOUNT (EXCL GST) A INTERNATIONAL STUDENTS HOSTEL 0.0 B GIRLS HOSTEL 0.0 GRAND TOTAL (A+B) Excl. GST 0.0 Zero Rupees and Zero Paise CONSTRUCTION OF BUILDING FOR INTERNATIONAL STUDENTS HOSTEL & GIRLS HOSTEL THRIKKAKKARA CAMPUS OF COCHIN UNIVERSITY OF SCIENCE & TECHNOLOGY Tender No. HITES/IDS/CUSAT/25/22 (e-tender ID: 2025_HITES_820592_1) ABSTRACT - GIRLS HOSTEL Name of the bidder SL.No DESCRIPTION AMOUNT (EXCL GST) I CIVIL WORKS INCL.MAIN BUILDING, DG SHED, COMPOUND WALL, GATE, SUMP 0.0 II PLUMBING WORKS 0.0 III ELECTRICAL WORKS 0.0 IV ELV 0.0 V FIREFIGHTING & ALARM SYSTEM 0.0 TOTALAMOUNT (EXCL GST) 0.0 Zero Rupees and Zero Paise CONSTRUCTION OF BUILDING FOR INTERNATIONAL STUDENTS HOSTEL & GIRLS HOSTEL THRIKKAKKARA CAMPUS OF COCHIN UNIVERSITY OF SCIENCE & TECHNOLOGY Tender No. HITES/IDS/CUSAT/25/22 (e-tender ID: 2025_HITES_820592_1) Name of bidder BOQ - GIRLS HOSTEL Item No DSR code Details of items Unit QUANTITY Rate (Rs.) In figures (Excluding GST) Rate (Rs.) In words (Excluding GST) Amount(Excluding GST) I. CIVIL WORKS |
| 24 | 2.6.1 |
| 25 | 2.7.1 |
| 26 | 2.8.1 |
| 27 | 2.9.1 |
| 28 | 2.26.1 |
| 29 | 2.26.2 |
| 30 | DSR ANALYSIS |
| 31 | DSR ANALYSIS |
| 32 | DSR ANALYSIS |
| 33 | 4.1.3 |
| 34 | 4.1.8 |
| 35 | 4.2.5 |
| 36 | DSR ANALYSIS |
| 37 | DSR ANALYSIS |
| 38 | DSR ANALYSIS |
| 39 | DSR ANALYSIS |
| 40 | DSR ANALYSIS |
| 41 | DSR ANALYSIS |
| 42 | 5.22.6 |
| 43 | 5.22A.6 |
| 44 | 5.9.1 |
| 45 | 5.9.2 |
| 46 | 5.9.3 |
| 47 | 5.9.5 |
| 48 | 5.9.6 |
| 49 | 5.11.1 |
| 50 | 5.9.15 |
| 51 | 5.9.7 |
| 52 | 5.9.16.1 |
| 53 | 5.9.19 |
| 54 | 50.4.1.1 |
| 55 | 19.18.3 |
| 56 | 50.6.1.4 |
| 57 | 50.6.1.5 |
| 58 | 50.6.1.6 |
| 59 | DSR ANALYSIS |
| 60 | DSR ANALYSIS |
| 61 | DSR ANALYSIS |
| 62 | 7.1.1 |
| 63 | 7.2.1 |
| 64 | 21.1.1.2 |
| 65 | 21.1.2.2 |
| 66 | DSR ANALYSIS |
| 67 | 9.126.1 |
| 68 | 9.127.2 |
| 69 | 21.3.3 |
| 70 | DSR ANALYSIS |
| 71 | 9.100.1 |
| 72 | 9.97.3 |
| 73 | 9.97.5 |
| 74 | 50.9.15.1 |
| 75 | 9.103 |
| 76 | 9.1.1 |
| 77 | 9.21.1 |
| 78 | 9.121 |
| 79 | 9.122.2 |
| 80 | MR Door leaf should be minimum 60mm thick fully flush double skin door. Door leaf must be manufactured from 1.2mm(18gauge) thick galvanised steel sheet. The infill material shall be honeycomb craft paper insulation. All doors shall be factory prepped for receiving appropriate hardware and provided with necessary reinforcement for hinges, locks,and door closers. The edges should be interlocked with a bending radius of 1.4mm. For double leaf doors integrated astragals has to be provided on the meeting stile for both active and inactive leaf. The shutters shall be mounted to the frame with SS 304 grade ball bearing type hinges of size 100x89x3 mm alongwith all suitable hardware (Triple ponit panic bar,SS ball bearing hinges,door closer, panic Trim,6mm thick 300X400MM vision panel fire clear glass, etc complete).Vision lite glass size 300mm x 400mm (max area upto 0.12sqm) wherever applicable should be provided with single layeredclear fire rated glass panes as per guidelines laid down under IS 3614 : 2021 vide clause no. 7.2.7 table no. 2 with a clipon arrangement. The glass will be provided with fire rated ceramic tape of suitable size alround on either face. Every Glass panes must carry a permanent marking of approved make . Door must be tested with vision panelˇ6mm thick pyroswiss glass of approved make. DOUBLE LEAF 1800X2100MM 0.0 |
| 81 | MR Door leaf should be minimum 60mm thick fully flush double skin door. Door leaf must be manufactured from 1.2mm(18 gauge) thick galvanised steel sheet. The infill material shall be honeycomb craft paper insulation. All doors shall be factory prepped for receiving appropriate hardware and provided with necessary reinforcement for hinges, locks, and door closers. The edges should be interlocked with a bending radius of 1.4mm. For double leaf doors integrated astragals has to be provided on the meeting stile for both active and inactive leaf. The shutters shall be mounted to the frame with SS 304 grade ball bearing type hinges of size 100x89x3 mm along with all suitable hardware (Triple point panic bar, SS ball bearing hinges, door closer, panic Trim, 6mm thick 300X400MM vision panel fire clear glass, etc complete). Vision lite glass size 300mm x 400mm (max area upto 0.12sqm) wherever applicable should be provided with single layered clear fire rated glass panes as per guidelines laid down under IS 3614 : 2021 vide clause no. 7.2.7 table no. 2 with a clipon arrangement. The glass will be provided with fire rated ceramic tape of suitable size alround on either face. Every Glass pane must carry a permanent marking of approved make. Door must be tested with vision panel- 6mm thick pyroswiss glass of approved make. SINGLE LEAF 1000X2100MM |
| 82 | 9.101.1 |
| 83 | 10.25.1 |
| 84 | 10.25.2 |
| 85 | 9.48.2 |
| 86 | 10.28 |
| 87 | 10.19 |
| 88 | 10.16.3 |
| 89 | 12.1.3 |
| 90 | 13.61.1 |
| 91 | 11.41.2 |
| 92 | 11.48.2 |
| 93 | 11.46.2 |
| 94 | DSR ANALYSIS |
| 95 | 8.2.2.2 |
| 96 | 11.56.1 |
| 97 | 11.55.1 |
| 98 | 8.3.2 |
| 99 | 11.6.1 |
| 100 | 11.20.3 |
| 101 | 8.9.1.2 |
| 102 | DSR ANALYSIS |
| 103 | 13.1.2 |
| 104 | 13.16.1 |
| 105 | 13.1.1 |
| 106 | 13.8.1 |
| 107 | 13.22 |
| 108 | 13.26 |
| 109 | 13.44.1 |
| 110 | 13.52.1 |
| 111 | DSR ANALYSIS |
| 112 | 13.83.2 |
| 113 | DSR ANALYSIS |
| 114 | 13.45.1 |
| 115 | 21.7.1 |
| 116 | 22.22A |
| 117 | 22.23A |
| 118 | 22.26 |
| 119 | 16.78.1 |
| 120 | 16.79 |
| 121 | 16.91.2 |
| 122 | 30.2.57.1 |
| 123 | MR TOTAL (CIVIL WORKS) EXCL.GST 0.0 II. PLUMBING WORKS |
| 124 | 18.21.2.1 |
| 125 | 17.28.2.1 |
| 126 | 18.53.1 |
| 127 | 17.31 |
| 128 | 50.17.1.2 |
| 129 | 50.17.1.1 |
| 130 | 17.71 |
| 131 | 18.8.2 |
| 132 | 18.8.3 |
| 133 | 18.8.4 |
| 134 | 18.7.2 |
| 135 | 18.7.3 |
| 136 | 18.7.4 |
| 137 | 18.7.5 |
| 138 | 18.7.6 |
| 139 | 18.9.2 |
| 140 | 18.9.3 |
| 141 | 18.9.4 |
| 142 | 18.9.5 |
| 143 | 18.17.1A |
| 144 | 18.17.1 |
| 145 | 18.17.2 |
| 146 | 18.17.3 |
| 147 | 18.17.4 |
| 148 | 18.17.5 |
| 149 | 18.17.6 |
| 150 | 18.19.5.1 |
| 151 | 18.32.1 |
| 152 | 18.37.1 |
| 153 | 18.76.1 |
| 154 | 50.18.8.3.2 |
| 155 | 50.18.8.6.2 |
| 156 | 50.18.7.6.2 |
| 157 | 50.18.7.5.2 |
| 158 | 50.18.9.22.8 |
| 159 | 50.18.9.21.7 |
| 160 | 12.44 |
| 161 | 19.4.1.1 |
| 162 | 19.4.2.1 |
| 163 | 19.7.1.1 |
| 164 | 19.7.2.1 |
| 165 | 19.8.1.1 |
| 166 | 19.8.2.1 |
| 167 | 19.16 |
| 168 | 18.9.7 |
| 169 | 18.18.2 |
| 170 | 19.32.1 |
| 171 | MR TOTAL (PLUMBING WORKS) excl.GST 0.0 7049678.81 III. ELECTRICAL WORKS |
| 172 | WIRING |
| 173 | 1.10.3 |
| 174 | 1.14.1 |
| 175 | 1.14.2 |
| 176 | 1.14.3 |
| 177 | 1.21.1 |
| 178 | 1.21.2 |
| 179 | 1.21.3 |
| 180 | 1.22.16 |
| 181 | 1.27.1 |
| 182 | 1.50.1 |
| 183 | 1.55.3 |
| 184 | MCBs AND DISTRIBUTION BOARDS |
| 185 | 2.3.3 |
| 186 | 2.4.1 |
| 187 | 2.4.2 |
| 188 | 2.4.3 |
| 189 | 2.5.1 |
| 190 | 2.5.2 |
| 191 | 2.10.1 |
| 192 | 2.10.3 |
| 193 | 2.10.4 |
| 194 | 2.10.5 |
| 195 | 2.12.1 |
| 196 | 2.13.1 |
| 197 | 2.13.2 |
| 198 | 2.14.2 |
| 199 | 2.15.1 |
| 200 | 2.15.2 |
| 201 | 2.15.3 |
| 202 | CABLE TRAY |
| 203 | 4.6.2 |
| 204 | 4.6.4 |
| 205 | EARTHING |
| 206 | MV CABLE LAYING |
| 207 | 7.1.1 |
| 208 | 7.1.3 |
| 209 | 7.2.1 |
| 210 | 7.2.3 |
| 211 | 7.5.1 |
| 212 | 7.5.3 |
| 213 | 7.7.1 |
| 214 | 7.7.3 |
| 215 | 7.8.1 |
| 216 | 7.8.3 |
| 217 | MV ENDING TERMINATION |
| 218 | 9.1.25 |
| 219 | 9.1.27 |
| 220 | 9.1.32 |
| 221 | 9.1.33 |
| 222 | 9.1.34 |
| 223 | MISCELLANEOUS CIVIL ITEMS (A) |
| 224 | 14.13.3 |
| 225 | 14.16.5 |
| 226 | MISCELLANEOUS CIVIL ITEMS (B) |
| 227 | 10.18 |
| 228 | DG SET AND AMF LT PANEL |
| 229 | LT CABLES |
| 230 | LIGHT FITTINGS AND FAN |
| 231 | LIGHTNING PROTECTION |
| 232 | SOLAR PV SYSTEM |
| 233 | LIGHTING CONTROL |
| 234 | MISCELLANEOUS ELECTRICAL ITEMS |
| 235 | LMR TOTAL AMOUNT (ELECTRICAL WORKS) EXCL GST 0.0 IV. ELV Works |
| 236 | LMR TOTAL AMOUNT (ELV WORKS) EXCL GST 0.0 V. FIRE FIGHTING WORKS |
| 237 | MR FIRE DETECTION & ALARM WORKS |
| 238 | MR TOTAL (FIRE FIGHTING WORKS) EXCL. GST ` 0.0 NB: Please refer the feasibility report attached before quoting the rate TOTAL TOTAL INCLUDING GST 18% CONSTRUCTION OF BUILDING FOR INTERNATIONAL STUDENTS HOSTEL & GIRLS HOSTEL THRIKKAKKARA CAMPUS OF COCHIN UNIVERSITY OF SCIENCE & TECHNOLOGY Tender No. HITES/IDS/CUSAT/25/22 (e-tender ID: 2025_HITES_820592_1) Name of bidder ABSTRACT - INTERNATIONAL STUDENTS HOSTEL SL.No DESCRIPTION AMOUNT (EXCL GST) I CIVIL WORKS 0.0 II PLUMBING WORKS 0.0 III ELECTRICAL & ELV WORKS 0.0 IV FIREFIGHTING & ALARM SYSTEM 0.0 TOTAL AMOUNT (EXCL GST) 0.0 Zero Rupees and Zero Paise CONSTRUCTION OF BUILDING FOR INTERNATIONAL STUDENTS HOSTEL & GIRLS HOSTEL THRIKKAKKARA CAMPUS OF COCHIN UNIVERSITY OF SCIENCE & TECHNOLOGY Tender No. HITES/IDS/CUSAT/25/22 (e-tender ID: 2025_HITES_820592_1) Name of bidder BOQ - INTERNATIONAL STUDENTS HOSTEL Item No DSR code Details of items Unit QUANTITY Rate (Rs.) In figures (Excluding GST) Rate (Rs.) In words (Excluding GST) Amount(Excluding GST) I. CIVIL WORKS |
| 239 | 2.1.1 |
| 240 | 2.6.1 |
| 241 | 2.26.1 |
| 242 | 4.1.8 |
| 243 | DSR ANALYSIS |
| 244 | DSR ANALYSIS |
| 245 | DSR ANALYSIS |
| 246 | DSR ANALYSIS |
| 247 | 5.9.1 |
| 248 | 5.9.3 |
| 249 | 5.9.5 |
| 250 | 5.9.6 |
| 251 | 5.9.2 |
| 252 | 5.9.7 |
| 253 | 5.9.16.1 |
| 254 | 5.9.19 |
| 255 | 5.11.1 |
| 256 | 5.22.6 |
| 257 | 5.22A.6 |
| 258 | 50.6.1.5 |
| 259 | 50.6.1.6 |
| 260 | 50.6.2.2 |
| 261 | 50.6.2.3 |
| 262 | 10.28 |
| 263 | 10.26.1 |
| 264 | 9.1.1 |
| 265 | 21.3.2 |
| 266 | 9.21.1 |
| 267 | 9.22.1 |
| 268 | 10.6.1 |
| 269 | 9.70.1 |
| 270 | 9.121 |
| 271 | 9.122.2 |
| 272 | 21.1.1.2 |
| 273 | 21.1.2.2 |
| 274 | 21.3.1 |
| 275 | 21.11.3 |
| 276 | 9.101.1 |
| 277 | DSR ANALYSIS |
| 278 | 13.61.1 |
| 279 | DSR ANALYSIS |
| 280 | DSR ANALYSIS |
| 281 | 13.83.2 |
| 282 | DSR ANALYSIS |
| 283 | 13.1.1 |
| 284 | 13.16.1 |
| 285 | 13.11 |
| 286 | 13.7.1 |
| 287 | 9.48.2 |
| 288 | DSR ANALYSIS |
| 289 | 11.48.2 |
| 290 | DSR ANALYSIS |
| 291 | DSR ANALYSIS |
| 292 | 8.13.1 |
| 293 | 8.3.2 |
| 294 | DSR ANALYSIS |
| 295 | DSR ANALYSIS |
| 296 | 11.36 |
| 297 | 10.25.1 |
| 298 | 10.16.1 |
| 299 | DSR ANALYSIS |
| 300 | MR The edges should be interlocked with a bending radius of 1.4mm. For double leaf doors integrated astragals has to be provided on the meeting stile for both active and inactive leaf. The shutters shall be mounted to the frame with SS 304 grade ball bearing type hinges of size 100x89x3 mm alongwith all suitable hardware (Triple ponit panic bar,SS ball bearing hinges,door closer,panic Trim,6mm thick 300X400MM vision panel fire clear glass, etc complete) Vision lite glass size 300mm x 400mm (max area upto 0.12sqm) wherever applicable should be provided with single layered clear fire rated glass panes as per guidelines laid down under IS 3614 : 2021 vide clause no. 7.2.7 table no. 2 with a clipon arrangement. The glass will be provided with fire rated ceramic tape of suitable size alround on either face. Every Glass pane must carry a permanent marking of approved make . Door must be tested with vision panel 6mm thick pyroswiss glass of approved make. DOUBLE LEAF 1800X2100MM NO 3.0 Zero Rupees and Zero Paise 0.0 |
| 301 | MR Door leaf should be minimum 60mm thick fully flush double skin door. Door leaf must be manufactured from 1.2mm(18gauge) thick galvanised steel sheet. The infill material shall be honeycomb craft paper insulation. All doors shall be factory prepped for receiving appropriate hardware and provided with necessary reinforcement for hinges, locks, and door closers. The edges should be interlocked with a bending radius of 1.4mm. For double leaf doors integrated astragals has to be provided on the meeting stile for both active and inactive leaf. The shutters shall be mounted to the frame with SS 304 grade ball bearing type hinges of size 100x89x3 mm alongwith all suitable hardware (Mortice Dead Lock and bsk cylinder SS ball beraing hinges,Door closer,SS D type handle 300*22d B2B,6mmthick 300x400mm vision panel fire clear glass etc complete). Vision lite glass size 300mm x 400mm (max area upto 0.12sqm) wherever applicable should be provided with single layered clear fire rated glass panes as per guidelines laid down under IS 3614 : 2021 vide clause no. 7.2.7 table no. 2 with a clipon arrangement. The glass will be provided with fire rated ceramic tape of suitable size alround on either face. Every Glass pane must carry a permanent marking of approved make . Door must be tested with vision panelˇ6mm thick pyroswiss glass of approved make. SINGLE LEAF 1000X2100MM NO 1.0 Zero Rupees and Zero Paise 0.0 |
| 302 | 5.41.1 |
| 303 | 22.22A TOTAL (CIVIL WORKS) EXCL. GST 0.0 II. PLUMBING WORKS |
| 304 | 17.72 |
| 305 | 18.53.1 |
| 306 | 17.31 |
| 307 | 18.65 |
| 308 | 17.34.1 |
| 309 | 17.10.1.2 |
| 310 | 17.73.2 |
| 311 | 50.18.9.19.1 |
| 312 | 50.18.9.21.2 |
| 313 | 50.18.9.21.3 |
| 314 | 12.42.3.2 |
| 315 | 50.18.8.6.2 |
| 316 | 50.18.8.8.1 |
| 317 | 5018.8.9.1 |
| 318 | 18.8.2 |
| 319 | 18.8.3 |
| 320 | 18.7.1 |
| 321 | 18.7.2 |
| 322 | 18.7.3 |
| 323 | 18.7.4 |
| 324 | 18.7.5 |
| 325 | 18.7.6 |
| 326 | 18.9.3 |
| 327 | 18.9.6 |
| 328 | 18.17.1 |
| 329 | 18.17.2 |
| 330 | 18.17.3 |
| 331 | 18.17.4 |
| 332 | 18.19.4.1 |
| 333 | 50.18.9.9.1 |
| 334 | 50.18.9.10.1 |
| 335 | 19.4.1.2 |
| 336 | MR TOTAL EXCL.GST (PLUMBING WORKS) 0.0 III. ELECTRICAL AND ELV WORKS |
| 337 | WIRING AND END TERMINATION |
| 338 | 1.10.3 |
| 339 | 1.10.1 |
| 340 | 1.10.2 |
| 341 | 1.14.1 |
| 342 | 1.14.2 |
| 343 | 1.14.3 |
| 344 | 1.21.1 |
| 345 | 1.21.2 |
| 346 | 1.21.3 |
| 347 | 1.24.8 |
| 348 | 1.24.1 |
| 349 | 1.24.3 |
| 350 | 1.24.4 |
| 351 | 1.24.5 |
| 352 | 1.27.1 |
| 353 | 1.55.1 |
| 354 | 1.55.2 |
| 355 | 1.55.3 |
| 356 | 7.1.4 |
| 357 | 7.2.4 |
| 358 | 7.6.1 |
| 359 | 7.6.4 |
| 360 | 7.8.1 |
| 361 | 7.8.2 |
| 362 | 7.8.4 |
| 363 | 7.7.3 |
| 364 | 14.15.1 |
| 365 | 9.1.22 |
| 366 | 9.1.24 |
| 367 | 9.1.27 |
| 368 | 9.1.31 |
| 369 | 9.1.30 |
| 370 | 9.1.32 |
| 371 | 9.1.33 |
| 372 | Distribution Boards ,Earthing And Lightning Arrester |
| 373 | 2.3.3 |
| 374 | 2.4.1 |
| 375 | 2.4.2 |
| 376 | 2.4.3 |
| 377 | 2.5.2 |
| 378 | 2.10.4 |
| 379 | 2.10.5 |
| 380 | 2.12.1 |
| 381 | 2.14.1 |
| 382 | 2.15.1 |
| 383 | 2.15.2 |
| 384 | 2.5.1 |
| 385 | 2.10.1 |
| 386 | 2.2.14 |
| 387 | 2.13.1 |
| 388 | 2.13.2 |
| 389 | 90.16.1.3 |
| 390 | 90.16.1.4 |
| 391 | Fire Safety Equipment\"s |
| 392 | Cable tray |
| 393 | 4.1.2 |
| 394 | 4.1.1 |
| 395 | 4.1.4 |
| 396 | 4.1.7 |
| 397 | 4.2.1 |
| 398 | 4.2.2 |
| 399 | 4.2.4 |
| 400 | 4.2.7 |
| 401 | 4.3.1 |
| 402 | 4.3.2 |
| 403 | 4.3.4 |
| 404 | 4.3.7 |
| 405 | 4.4.1 |
| 406 | 4.4.2 |
| 407 | 4.4.4 |
| 408 | 4.4.7 |
| 409 | 4.5.1 |
| 410 | 4.5.2 |
| 411 | 4.5.4 |
| 412 | 4.5.7 |
| 413 | Light/Fan Fixtures |
| 414 | LT Panels & UPS |
| 415 | ELV SYSTEM-HOROZONTAL COPPER CONNECTIVITY & NETWORKING |
| 416 | NETWORKING RACKS |
| 417 | NETWORK SWITCHES |
| 418 | WI-FI |
| 419 | IP SURVEILANCE SYSTEM |
| 420 | TOTAL AMOUNT (ELECTRICAL AND ELV WORKS) EXCL GST 0.0 IV. FIREFIGHTING WORKS FIRE FIGHTING SYSTEM |
| 421 | MR TOTAL AMOUNT ( FIREFIGHTING WORKS) EXCL. GST ` 0.0 NB: Please refer the feasibility report attached before quoting the rate |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail