| 1 | Taking down cement plaster/ terrazo finish on brick wall or concrete surfaces including racking out joints, hacking for keys scrubbing down with water all as specified and directed by Engineer - in - Charge. |
| 2 | M & L rendering 15mm thick on fair facesof brick work or concrete surfacesin CM 1:6 finished even & smooth without using extra cement at any height and providing necessary scaffolding, safety precaution and other requisite arrangement all as specified and directed by Engineer - in - Charge . |
| 3 | M&L for Rendering 10 mm thick in cement mortar (1:3) on concrete surfaces up to 15 metre height on ceiling surfaces suh as in Chajja/ mumty at any positon including necessary scafolding work, finished even and fair without using extra cement complete all as specified as specified and as directed by Engineer-in-Charge. |
| 4 | M & L 15mm thick rendering in Cement Mortar 1:4 on fair face of brick or concrete surfaces upto 15 metre height finished even and smooth without using extra cement complete all as specified and directed by Engineer - in - Charge. Note:- The rates do not include for the supply of integral water proofing compound, which shall be paid for in addition at “supplied only rates separately, as applicable. |
| 5 | Supply only liquid waterproofing compound all as specified and directed by Engineer - in - Charge. |
| 6 | M & L two coats of distemper oil emulsion over a coat of primer and wall putty (Asian / JK / Birla), preparatory to distempering, on newlyplastered surfaces of walls including preparation of surfaces all as specified and directed by Engineer - in - Charge. |
| 7 | Repair to RCC sunshades, chajjas, balconies, coloumns, bands, beams and similar RCC work at any position up to 15 meter height by dismantling loose/ disintegrated portion and fixing of TMT and chicken wire mesh of size 12.5 mm x 1 mm securing with clips/ chicken wire mesh wherever required and dubbing out with cement concrete 1:1.5:3, 15 mm to 50 mm thick, using 6 to 12 mm graded stone aggregate to make up and finished the required shape including providing of necessary scaffolding and formwork for carring out work of height uptofour storey building, if required and finished with 5 mm thick rendering in cement mortar 1:4 finished even and fair without using extra cement complete all as specified and as directed by Engineer-in-Charge.Note: Rate quoted shall be inclusive of chicken wire mesh. |
| 8 | M & L two coats of distemper oil emulsion over a coat of primer, preparatory to distempering on old surfaces after complete removal of existing treatment upto 6 metre height including necessary scafolding and safety arrangement all as specified and directed by Engineer - in - Charge. |
| 9 | M&L for applying a layer of wall care putty 1mm thick on new or old decorated surface all as specified and directed by Engineer - in - Charge. |
| 10 | M & L one coat of distemper oil emulsion on wall surface, preparatory to distempering on old surfaces upto 6 metre height including necessary scafolding and safety arrangement all as specified and directed by Engineer - in - Charge. |
| 11 | M & L one coat of distemper oil emulsion on ceiling surface, preparatory to distempering on old surfaces upto 6 metre height including necessary scafolding and safety arrangement all as specified and directed by Engineer - in - Charge. |
| 12 | M&L plastic emulsion paint one coat including preparation of old decorated plastered or unplastered surfaces of wallsor concrete surfaces complete all as specified and as directed by Engineer-in-Charge. |
| 13 | M & L for preparation of old painted wooden surfaces of any description over 10 cm width or girth not otherwise described and applying one coat of synthetic enamel paint all as specified and directed by Engineer - in - Charge . |
| 14 | M & L for preparation of old painted steel surfaces of any description over 10 cm width or girth not otherwise described and applying one coat of synthetic enamel paint all as specified and directed by Engineer - in - Charge . |
| 15 | S&F Solid PVC Wall Lining consisting of5mm thick Plain colour PVC sheetinclusive of solvent cement and fixing atsite on with Vinyl plasted on it with 100mm letter cut fixed with rawl plugs and screws all as specified and directed by Engineer - in - Charge. |
| 16 | M & L one coat of distemper oil emulsion (Terracotta/ Shingle Red or any colour as approved) on old decorated plastered surfaces of walls including preparation of surfaces by washing, rubbing down and stopping of distempered surfaces complete all as specified and directed by Engineer - in - Charge . |
| 17 | M & L applying one coat of cement base paint on old decorated plastered surfaces of walls including preparation of surfaces by washing, rubbing down and stopping of painted surfaces complete all as specified and directed by Engineer - in – Charge |
| 18 | M & L applying one coat of exterior emulsion paint on old decorated plastered surfaces of walls including preparation of surfaces by washing, rubbing down and stopping of painted surfaces complete all as specified and directed by Engineer - in – Charge |
| 19 | SMART PERIODICAL |
| 20 | Complete removal of existing treatment by scrapping of walls, chajjas, ceilings, fins, facias etc. using mechanical means like mechanical sander etc. with internal dust extraction system for surface preparation prior to painting work complete all as specified and as directed by Engineer-in-Charge. |
| 21 | Material and Labour for widening of cracks from wall/ ceiling surfaces in V Groove upto 5 mm deep by using scrapper blade or angle cutter and filling the crack by applying a layer of acrylic crack filler paste or similar material complete all as specified and as directed by Engineer-in-Charge. |
| 22 | Material and Labour for applying with one coat of exterior primer which provides exceptional whiteness and opacity and ensures strong adhesion of the top coat. Priming work shall be carried out post all repair and preparatory works including cleaning the surface by removing loose particles, dust and other foreign materials using water by pressure washer all as directed by Engineer-in-Charge. |
| 23 | Material and Labour for applying with 2 coats of acrylic waterproof primer coating which is formulated with acrylic polymers having crack bridging ability of upto 1 mm, tensile strength of 1.8 mpa, 100% elongation and can withstand upto 5 bars hydrostatic pressure to provide better mechanical strength and adhesion to the surface all as per manufacturer\"s instruction complete. Priming work to be carried out post all repair and preparatory works including cleaning the surface from loose particles, dust and other foreign materials using water by pressure washer all as directed by Engineer-in-Charge. |
| 24 | Material and Labour for applying 2 coats of modified acrylic exterior emulsion having excellent scrub and peel resistance, superior whiteness, excellent finish, resistance to fading of colours, advanced anti fungal and algal protection against all round weather and paint performance of Minimum 5 Years so as to obtain an acceptable finish all as per manufacturer\"s instruction and directed by Engineer-in-Charge. |
| 25 | Providing and applying waterproof wall putty (cement-based or polymer-modified as approved) in two or more coats over prepared plastered surface to achieve smooth, even finished surface suitable for uniform application and curing as per manufacturer’s instruction and as directed by Engineer-in-Charge. |
| 26 | Notes for item 19.01 to 19.06:(a) The work pertaining to periodical services shall be executed as per MoU between tenderer and manufacturer of paints and their authorised applicator after approval by the GE as per MoU performa attached at Serial page No. 109 & 110. (b) The Contractor shall upload with the documents under cover I \"Memoradum of Understanding\" (MOU) with at least one of the manufacturers mentioned in the contract, failing which the bid shall not be opened and shall be liable to rejected.(c) Scaffolding, trestles, ladders, cradles and protective measures etc, as necessary for execution of work shall be arrenged by the contractor without any extra cost to the department.(d) Authorised applicator of the company with trained painters will only be allowed to execute the work and the applicator will submit the experience certificate from the company. |
| 27 | (e) The entire quantity of material will be calculated and brought in a maximum 3 phases and will be accepted only post verification of PVs and Challan from the company through Mail.(f) Material will be kept in the custody of MES rep and will be issued to the authorised applicator as per requirement.(g) Packing material/ empty Buckets will not be handed over to the contractor and will be destroyed after completion of work through a BOO. |
| 28 | (g) Buildings will be handed over to the contractor in a phased manner and subsequently to the authorised applicator only after completion of civil work like plastering/ repairing as required.(h) Entire work will be divided into four stages as under and will be certified by a company technical rep whether the stages completed are as per manufacturer’s instruction and passed by Engr-in-Charge/ GE:-(a) State :1Preliminary Inspection (b) Stage 2:Preparation of surface(c) Stage 3: Priming / Base Coat(d)Stage 4: Final coat of painting |
| 29 | (j)Stage passing register will be properly maintained duly signed by all Concerned.(k) Preparation of plastered or unplastered surface or removal of existing treatment by scrapping of walls, chajjas, ceilings, fins, facias etc. shall be done using mechanical sander with internal dust extraction system for clean environment.(l) All priming/ painting work will be done by mechanical sprayer only.(m) All rates quoted will be inclusive of all scaffolding as and when required as per the schedule attached and no work will be allowed without proper scaffolding, height of each building are as indicated in the list of buildings.(n) The contractor shall submit manufacturer generated 05 years warranty card for each building during submission of RAR and Final Bill.(o) A guaranty amount @ 10% will be kept as reserve till completion of warranty period and will be released thereafter. (p) Any deterioration during the warranty period will be rectified by the manufacturer without any financial effect. |