| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. |
| 2 | Earth work in excavation in hard soil within initial lead & lift includingrough dressing and breaking clods maximum 5cm. To 7cm.& laying in layers not exceeding 0.3m. In depth to properprofile as directed by the E-I-C. |
| 3 | Filling foundation & plinth with sand watered & rammed etc complete including cost, conveyance, royalty of sand etc complete. |
| 4 | Cement Concrete (1:3:6) with 40mm size H.G. Chips including all cost, conveyance, royalty, taxes of all materials required for the work complete. |
| 5 | Cement Concrete (1:2:4) with 12mm size C.B. Chips including all cost, conveyance, royalty, taxes of all materials required for the work etc complete. |
| 6 | R.C.C.work of M-20 grade with 20mm & down grade crusher broken hard granite stone chips including hoisting and laying etc.complete. |
| 7 | (A) Base of Column |
| 8 | (B) Column and Beam |
| 9 | Supplying,cutting ,fitting and placing uncoated HYSD bar reinforcement including cost of binding wire complete as per drawing and technical specification etc complete. |
| 10 | Supplying, fitting, fixing of MS gate, post, bracing and welded wire mesh for fencing with errection including carriage and transportation etc comp. |
| 11 | 12mm thick cement plaster (1:6) for brick work including cost, conveyance, royalty, taxes of all materials required for the work complete. |
| 12 | Priming one coat with any approved Primer including cost of wall cement primer water based including all labour, materials etc. |
| 13 | Wall painting two coats with weather coat of approved shade on new work to give an even shade including cost of paint etc,compete. |
| 14 | Painting two coats with approved enamel paint over a coat of primer on new Iron works etc complete including all taxes. |
| 15 | Transparency display board with Photograph. Please Enable Macros to View BoQ information |