| 1 | Construction of Community Hall at AD colony in Neikulam Panchayat.Earth work excavation and depositing on banks with initial lead and lift in gravelly soil stiff clay, hard stiff clay, murram, boulders mixed with gravel as per SS 20-B for foundation. |
| 2 | Filling M-Sand including cost and conveyance loading unloading from approved quarry to work site and labour charges for filling, ramming, etc. complete |
| 3 | Cement concrete (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour charges etc. complete as per standard specification. |
| 4 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick |
| 5 | Reinforced Cement concrete 1:1.5:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., |
| 6 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., Below |
| 7 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., Above sill level |
| 8 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4\"x41/4\"x21/4\" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. |
| 9 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. |
| 10 | Brick jelly Lime concrete by using 20 mm brick jelly with lime in the ratio of 32 : 12.5 including cost conveyance of all materials and labour charges for mixing laying compacting well beaten with wooden batens etc complete |
| 11 | Finishing the Top of Roof with one course of Pressed Tiles of size 20 cm x 20 cm x 2 cm laid in cement mortor 1 : 3 and pointing with the same mortor mixed with water proof compound including cost and conveyance off all materials and labour charges etc complete |
| 12 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. (Based on SoR 2024-25) |
| 13 | Special ceiling Plastering with CM 1:3 10mm thick including cost and conveyance charges etc., |
| 14 | Plastering in CM 1:5, 12mm thick including cost and conveyance charges etc., |
| 15 | Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 16 | Paving the floor with pre-polished concrete anti-skid step tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 17 | Supply of the following steel doors etc. complete |
| 18 | Supply of the following steel Window etc. complete |
| 19 | Supply of the following PVC pipes and PVC specials etc. complete For Seewage Line and Rainwater Down Fall Pipe with necessary bend ,shoes and clamp and labour charges etc complete |
| 20 | Painting Two Coats of OIL Bound Distember of approved colour over one Primer Coat including cost of Paint and labour charges etc complete |
| 21 | Painting Two Coats with exterior emulsion of approved colour over one Primer coat including cost of Paint and labour charges etc complete |
| 22 | Supplying and painting two coats new iron work such as steel doors ventilators, window bars etc., |
| 23 | Fixing Charges for Steel Door in Position etc complete |
| 24 | Fixing Charges for Steel Windows in Position etc complete |
| 25 | Provision For Hand rail Arrangements |
| 26 | Light / Fan Point SD 25 |
| 27 | Plug Point SD 38 |
| 28 | Plug Point SD 39 |
| 29 | 4 40w Tube light SD 88 |
| 30 | SD 65 |
| 31 | SD 70 |
| 32 | Bulk head 15 w SD 83 |
| 33 | Fan Fitting 0.3 m SD 110 |
| 34 | Provision for Name board |
| 35 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information |