Bids Are Invited For Labour For Disconnecting Existing Ht Lt Supply From Defective Transformer Disconnection Complete All As Directed By Engr-In-Charge - Labour For Disconnecting Existing Ht/Lt Supply From Defective Transformer, Opening Transformer Cover, Meggering Of Defectivfe Transformer. All Elect Connection Of The Trolly Mounted Transofrmer At The Site. After Repair Connection Of Reapaired Transformer And Disconnection Of Trolly Mounted Transformer , Labour For Crane For Lifting Transofrmer In The Veh And Transportation Complete All As Directed By Engr-In-Charge - Labour For Crane For Lifting Transofrmer In The Veh And Transportation To The Auth Wksp And Return Back The Same After Repair , S And F Hv Side Windings With Suitable Size Of Copper Conductor Complete All As Directed By Engr-In-Charge - S&F Hv Side Windings With Suitable Size Of Copper Conductor , S And F Lv Side Windings With Suitable Size Of Copper Conductor Complete All As Directed By Engr-In-Charge - S&F Lv Side Windings With Suitable Size Of Copper Conductor , Labour For Oven Charging For Transformer Windings Complete All As Directed By Engr-In-Charge , S And F New Transformer Oil, Low Viscosity Of Dielectric Strength Complete All As Directed By Engr-In-Charge - S & F New Transformer Oil, Low Viscosity Of Dielectric Strength Not Less Than 50 Kv In To The Conservator Tank/Body Tank Of The Transformer , S And F Tape, Paper Insulating Strings Etc Gently And Carefully, Washing Of The Dust, Complete All As Directed By Engr-In-Charge - S&F Tape, Paper Insulating Strings Etc Gently And Carefully, Washing Of The Dust, Rust And Idr From All Parts Including Taking Oiut Ht/Lt Leg Coil Core Tank And Cooling Tubes , Painting Of The Inner And Outer Side Of The Transformer With Zinc Chromate Complete All As Directed By Engr-In-Charge - Painting Of The Inner And Outer Side Of The Transformer With Zinc Chromate Paint And Outer Side By Synthetic Enameled Paint Over A Coat Of Primer (Grey Colour) , Supply And Fix Ht Porecelain Bushing Complete With Brass Tinned Complete All As Directed By Engr-In-Charge - Supply And Fix Ht Porecelain Bushing Complete With Brass/Tinned Copper Rod With Nuts And Gasket Set Complete , Supply And Fix Lt Porecelain Bushing Complete With Brass Tinned Copper Rod Complete All As Directed By Engr-In-Charge - Supply And Fix Lt Porecelain Bushing Complete With Brass/Tinned Copper Rod With Nuts And Gasket Set Complete , Supply And Fix Tap Cahnger Switch 11 Kv Complete With Rod And Gasket Complete Complete All As Directed By Engr-In-Charge - Supply And Fix Tap Cahnger Switch 11 Kv Complete With Rod And Gasket Complete , Supply And Fix Breather Assy With New Silica Gel Complete All As Directed By Engr-In-Charge - Supply And Fix Breather Assy With New Silica Gel , Testing Of The Transformer After Repair As Directed By Engr-In-Charge , Labour For Shifting Of Trolly Mounted Transformer 315 Kva From Age Em Sub Divn To The Proposed Site And Same Will Be Return Back After Completion Of Wk Complete All As Directed By Engr-In-Charge - Labour For Shifting Of Trolly Mounted Transformer 315 Kva From Age Em Sub Divn To The Proposed Site And Same Will Be Return Back After Completion Of Wk , Labour For Disconnecting Existing Ht Supply From Transformer And Opening The Complete All As Directed By Engr-In-Charge - Labour For Disconnecting Existing Ht Supply From Transformer And Opening The Transformer For Changing The Defective Part And Re-Assemble The Same After Repair , S And F Gaskets Of Suitable Size Sealing Washers O Rings And Other Consumbels Such As Tape, Paper Insulating Strings Etc All As Reqd At Site Complete All As Directed By Engr-In-Charge - S&F Gaskets Of Suitable Size, Sealing Washers, O Rings And Other Consumbels Such As Tape, Paper Insulating Strings Etc All As Reqd At Site , Supply And Fix New Silica Gel Of Blue Colour Complete All As Directed By Engr-In-Charge - Supply And Fix New Silica Gel Of Blue Colour , Dehydration Filtaration Of Old Transformer Oil At Site With Protable Complete All As Directed By Engr-In-Charge - Dehydration/Filtaration Of Old Transformer Oil At Site With Protable Plant To Improve The Dielectric Strength 45 To 60 Kv , S And F New Transformer Oil, Low Viscosity Of Dielectric Strength Not Less Than 50 Kvcomplete All As Directed By Engr-In-Charge - S&F New Transformer Oil, Low Viscosity Of Dielectric Strength Not Less Than 50 Kv Into The Conservator Tank/Body Tank Of The Transformer , M And L For Dismantling Motors Upto 2.20 Kw Capacity Complete All As Directed By Engr-In-Charge - M&L For Dismantling Motors Upto 2.20 Kw Capacity, Taking Down And Carry To Workshop, Complete All As Directed By Engineer-In-Charge , Material And Labour For Repairing Servicing The 3 Phase 415V Electric Induction Motor Complete All As Directed By Engr-In-Charge - Material And Labour For Repairing Servicing The 3 Phase 415V Electric Induction Motor By Carefully Disconnecting The Connection Cables And Earthings , M And L For Testing Of Alignment Of Door Tracks Rails Both Sides By Complete All As Directed By Engr-In-Charge - M&L For Testing Of Alignment Of Door Tracks (Rails) Both Sides By Putting/Adding Additional Material (Filling) By Gas Cutting & Welding The Same And Making Them Smooth By Grinding For Smooth Functioning Of Door Complete All As Specified And Directed. , Taking Down Old Unsv Gears, Pinion, Warm Gear Etc And Supply And Fixing New Gears, Complete All As Directed By Engr-In-Charge - Taking Down Old Unsv Gears, Pinion, Warm Gear Etc And Supply And Fixing New Gears, Pinion, Warm Gear, Oil Seals, Packings Etc Including All Other Accessories, Fixtures, Nut Bolts & Washers As Required For Fixing Gears, Gear Oil (Gear Oil 320) , S And F Iron Cable Carrier Rollers Complete All As Directed By Engr-In-Charge - S & F Iron Cable Carrier (Rollers) , Supply In Replacement Of Wheel Bearing Complete All As Directed By Engr-In-Charge - Supply In Replacement Of Wheel Bearing , S And F In Replacement Of Pvc Sheathed Multistranded Flexible Copper Cable Of 3 Core 4.0 Sqmm 1100 Volt Grade Complete All As Directed By Engr-In-Charge - S & F In Replacement Of Pvc Sheathed Multistranded Flexible Copper Cable Of 3 Core 4.0 Sqmm 1100 Volt Grade , Decarburizing Cleaning Complete Control Panel Of By Cleaning Bus Bar Chamber Complete All As Directed By Engr-In-Charge - Decarburizing/Cleaning Complete Control Panel Of By Cleaning Bus Bar Chamber Iwht Suitable Chemical And Ensure Proper Decarburizing, Internal Wiring And Replacing The Damged Wires Of Existing Size, Refixing The Same After Applying Suitable Solution To The Bus Bar Insulator & Checking All The Connections, Tightening The Nuts, Bolts & Thimbles Of In-Coming Out-Going System Complete Incl Replacmenet Of Defective Rusted Bolts & Nuts, Repairing To Door/Shutter Hinges And Locking Arrangements , Supply In Filling Of Gear Oil Sp 320 For Top Up Upto To Required Level Or In Replacement Of Unserviceable Oil Complete All As Directed By Engr-In-Charge - Supply In Filling Of Gear Oil Sp 320 For Top Up Upto To Required Level Or In Replacement Of U/S Oil , Supply In Refilling Of Grease Including Cleaning Of Old Grease Complete All As Directed By Engr-In-Charge - Supply In Refilling Of Grease Including Cleaning Of Old Grease , S And F In Replacement Of Single Phase Preventor As Per Existing Make And Model Complete All As Directed By Engr-In-Charge - S & F In Replacement Of Single Phase Preventor As Per Existing Make And Model , S And F In Replacment Of Power Contactor Of Capacity 40 Amp, 3 Pole Suitable Complete All As Directed By Engr-In-Charge - S&F In Replacment Of Power Contactor Of Capacity 40 Amp, 3 Pole Suitable Total Quantity : 4625