Supply Of Materials For The Construction Of Gram Panchayat Building Bailur Gp Khanapur - Fitter(Grade1).,.,Mason (Brick Layer) Ist Class.,.,Carpender 1St Class.,.,Blacksmith 1St Class.,.,Mason (Brick Layer )2Nd Class.,.,Carpenter (Average).,.,Carpenter 2Nd Class.,.,Quarry Spalls.,,Rubble Stones.,,Broken Stone Aggregate 40 Mm Size,,Casurina Poles 75 - 100 Mm Dia.,Silver Oak, Or Equivalent Planks 38 Mm Thick.,,Jungle Wood Runners And Plank.,,Hom Of Vibrator 0.71 Days.,,Broken Stone Aggregate 20 Mm Size,,Mixer (Concrete) - 1 Cum Capacity.,,Plasticizer / Super Plasticizer.,.,Broken Stone Aggregate 12 Mm To 10 Mm Size,,Casurina Poles 100 - 150 Mm.,,Burnt Bricks Class 35 (Non Modular).,,Binding Wire,.,Tmt Bars Fe 500,.,Granite / Trap Broken Metal 100 Mm And Down Size,White Cement Based Putty At 2Sqm / Kg At Rs. 1050 Per Kgs.,,Add For Small Tools And Plants At 1%,Stone Dresser (With Tools),,Stone Cutter Class - I,,Plastic Sheet,,Plaster Of Paris.,,Pigment.,Wastages,Hassan Green Granite 20Mm Thick.,Mason Class Ii (With Tools).,.,White Cement,,Ceramic Tiles Of Size 30 X 30 Cms.,Add Watering Charges At 1 % On Labour.,,Add White Cement For Pointing At 2% On Material,Mixer (Concrete Small Used In Culvert.),Coarse Sand (Zone Iii),,Portland Cement,.,Border Tiles 30 X 10 Cms,,Colour Glazed Tiles 30X60 Cms 6Mm Thick,,Hom Of Machinaries For Planing,.,Add Cutting And Other Wastage 5%,,Mathi/Nandi Wood Planks For Panels 25 Mm Thick,,Mathi/Nandi Wood Scantling,,Add Hom Of Welding And Grinding Machine At 2% On Material,Fabricator_.,Plain Glass 5.50 Mm Thick_,Chrominum Plated Screws.,.,Cleat Angles_,Alluminium Handles - 15 Mm.,.,Alluminium Tower Bolt - 20 Cm.,.,Pvc Edge Beading.,Rubber Beading For Shutters Beading,.,.,Nylon Roller,,Powder Coated 60-70 Micron.01,Mason Class I (With Tools),,Add Hom Of Welding And Grinding Machine At 4% On Material,,Welder Grade I,,Fitter Class I,,Ms Flat,.,M.S Rods,,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint.,,Ready Mix Primer Paint (Ready Mix Red Lead Paint).,,Add Brush At 1% On Cost Of Paint.,,Enamel Metal Paint.,,Add Brush, Putty, Sand Paper At 2% On Cost Of Paint.,.,Whitening,.,Dry Distemper.,.,Add Watering Charges At 1 % On Material.,,Add Brush, Putty, Sand Paper, Roller At 5% On Cost Of Paint.,,Water Proofing Cement Paint.01,Handling Loading And Unloading 3% On Material.04,Labour Charges For Lifting And Placing In Position And Making Connection At 7% On Material.03,Polyenthylene Water Storage Tank Of Specified Capacity L.12,Add Handling Loading And Unloading At 2% On Material.,,Add Brush, Putty At 5% On Cost Of Distemper Primer,Liquid Wood Filter,Add Handling Loading And Unloading At 1% On Material.,,Add Providing And Removing Scaffolding At 3% On Labour.,,Painter Class I.,,Add Brush, Putty, Sand Paper At 5%, On Cost Of Paint,Enamel Paint,.