Erection Of 6.00 Metre High 3 Legged Roof Top Pole At The Newly Proposed Site At Taljhari, Sahebganj. (Ba: Dhanbad) Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : a) 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) 0.80 Cum 2 Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). 0.70 Cum 3 Centering and shuttering including strutting, propping etc. and removal of form for : a) Lintels, beams, plinth beams, girders, bressumers and cantilevers 6.00 Sqm b) Columns, Pillars, Piers, Abutments, Posts and Struts 5.00 Sqm 4 Steel reinforcement for R.C.C. work including straightening, cutting,
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.