| 1 | PART A CONSTRUCTION OF Shegaon-1 GRADED BUNDING NO. 1PTGI-1/01/12, (12/1) |
| 2 | Item No. 1: Excavation in soil, soft murum including boulders up to 0.6 m dimeter (0.113cum) for canal,seating of embankment filter drains/ catch water drains etc. andplacing cost of all materials, machinery,labor, dressing bed and sides to required level and profile etc., complete with lead up to 15 m and 6m lift. |
| 3 | MREGS (शा.नि.क्र.मंजूरी 2023/प्र.क्र.1057/मग्रारो-1 दि.8एप्रिल 2024) बाब क्र.1 |
| 4 | MREGS संस्करण( शा.नि.क्र.मंजूरी 2023/प्र.क्र.1057/मग्रारो-1 दि.8एप्रिल 2024) बाब क्र.9 अ |
| 5 | Item No.16:Providing and constructing 300 mm thick dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials labour, hand packing/wedging stone chips, finishing etc. complete with lead up to 50 m and all lifts as directed |
| 6 | Item No.:Provision for work insurance charges at 1% ofwork cost |
| 7 | Item No.:Provision for welfare cess at 1% of work cost |
| 8 | PART B CONSTRUCTION OF Shegaon-1 GRADED BUNDING NO. 2PTGI-1/01/12, (12/2) |
| 9 | Item No. 1: Excavation in soil, soft murum including boulders up to 0.6 m dimeter (0.113cum) for canal,seating of embankment filter drains/ catch water drains etc. andplacing cost of all materials, machinery,labor, dressing bed and sides to required level and profile etc., complete with lead up to 15 m and 6m lift. |
| 10 | MREGS (शा.नि.क्र.मंजूरी 2023/प्र.क्र.1057/मग्रारो-1 दि.8एप्रिल 2024) बाब क्र.1 |
| 11 | MREGS संस्करण( शा.नि.क्र.मंजूरी 2023/प्र.क्र.1057/मग्रारो-1 दि.8एप्रिल 2024) बाब क्र.9 अ |
| 12 | Item No.16:Providing and constructing 300 mm thick dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials labour, hand packing/wedging stone chips, finishing etc. complete with lead up to 50 m and all lifts as directed |
| 13 | Item No.:Provision for work insurance charges at 1% ofwork cost |
| 14 | Item No.:Provision for welfare cess at 1% of work cost |
| 15 | PART B CONSTRUCTION OF Shegaon-1 GRADED BUNDING NO. 2PTGI-1/01/12, (12/2) |
| 16 | Item No. 1: Excavation in soil, soft murum including boulders up to 0.6 m dimeter (0.113cum) for canal,seating of embankment filter drains/ catch water drains etc. andplacing cost of all materials, machinery,labor, dressing bed and sides to required level and profile etc., complete with lead up to 15 m and 6m lift. |
| 17 | MREGS (शा.नि.क्र.मंजूरी 2023/प्र.क्र.1057/मग्रारो-1 दि.8एप्रिल 2024) बाब क्र.1 |
| 18 | MREGS संस्करण( शा.नि.क्र.मंजूरी 2023/प्र.क्र.1057/मग्रारो-1 दि.8एप्रिल 2024) बाब क्र.9 अ |
| 19 | Item No.16:Providing and constructing 300 mm thick dry rubble stone pitching with pin headers at 2 per sqm using stones and stone chips from approved source including cost of all materials labour, hand packing/wedging stone chips, finishing etc. complete with lead up to 50 m and all lifts as directed |
| 20 | Item No.:Provision for work insurance charges at 1% ofwork cost |
| 21 | Item No.:Provision for welfare cess at 1% of work cost |