| 1 | Jungle clearance in borrow area , building premises,flanks and slopes of the roads,canals and embankments by removing the grass and the jungle bushes from top including weeding out shrubs,roots and levelling etc. complete as per direction of E/I. (WRD SOR Item No-5.1.3.1 Common Part - A -2.02(201)) |
| 2 | E/W in excavation in canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with kankar,pebbles and boulders upto 300 mm size and disposal of spoil upto 10 m with all lifts all complete as per specification and direction of E/I. (Vide Item No. 7.1.43.1) part - B , pg. No. -138 |
| 3 | E/W in excavation in canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with kankar, pebbles and boulders upto 300 mm size and disposal of spoil upto 500 m with all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I. (WRD SOR ITEM NO-7.1.43.2) |
| 4 | Use rate of 10 H.P. Diesel Pumpset including diesel, mobil, Operator etc all complete.(WRD-PM-29, Pg-83) |
| 5 | E/W in stripping by hydraulic M/C in grade A&B type of soil including morrum soil mixed with kankar , pebbles boulders, up to 300 mm size and disposal of the same along with all organic material in the country side beyond 150m upto 500m in all by tipper including construction & maintenance of hall road etc all complete as per specification and direction of E/I.(Vide item NO : 5.1.6.1, WRD ) |
| 6 | Supplying and laying Sand filter on slope of dam as per design, drawing with watering and compaction including cost of materials royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. (WRD SOR-5.6.5 & Part-A 6.5) |
| 7 | Supplying and laying (properly as per design and drawing) rip -rap with good quality of boulder duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage as per specification and direction of E/I. (WRD SOR-5.6.8 & Part-A 6.8) |
| 8 | Earth work in excavation of foundation trenches of toe wall,spillway,head regulator, outlet, intake well etc. as per designed section in all kinds of soil including moorum soil, soil mixed with kankar, pebbles and boulders upto 300mm size and disposal of the same (beyond 50 m away from the edge of the trenches) with initial lead of 150m and initial lift of 1.5 m as per specification and direction of E/l.(Vide Item No. - 5.1.14.1 of WRD Part -B ,Pg No.-100 |
| 9 | Providing and laying P.C.C or R.C.C. M150 with nominal mix of (1:2:4) in foundation of various components of canal or embankment structures with approved quality of 20mm graded coarse aggregate of required grade as per design and approved quality of sand of requisite F.M (2.5 to 3.0) washed and screened excluding cost of shuttering or form-work as well of reinforcement ,its cutting,bending, binding and placing including necessary tools and plants and vibrating,curing,royalty all taxes etc. complete job as per specifications and direction of E/I. (WRD-7.3.4 & BCD-5.3.1.2) |
| 10 | Providing rough dressed random rubble stone masonry in cement mortar (1:4) in foundation with approved quality of coarse sand of requisite F.M (2.5 to 3) washed and screened with raking out joints curing, scaffolding and its removal wherever required including royalty and all taxes etc. complete job as per specifications and direction of E/I.(WRD-7.4.10 & PART-A-4.28 or 5.2.28 Pg No-204) |
| 11 | Providing rough dressed random rubble stone masonry in cement mortar (1:4) in superstructure with approved quality of coarse sand of requisite F.M (2.5 to 3) washed and screened with raking out joints curing, scaffolding and its removal wherever required including royalty and all taxes etc. complete job as per specifications and direction of E/I.(WRD-7.4.13 & PART-A-4.31 or 5.2.31 Pg No-204) |
| 12 | Earthwork in filling foundation trenches and back filling of structures in layer not exceeding 150 mm.thick well watered, earth obtained from excavation of foundation trenches and placed in a suitable profile within a lead of 30M and lift of 1.5M complete job, as per specification and direction of E/I. (WRD-6.1.16 Pg No-120) |
| 13 | Providing 25mm thick cement plaster (1:4) with approved quality of sand of requisite F.M (2.5 to 3.0) washed and screened including curing, scaffolding wherever required and its removal, royalty and all taxes etc. complete job as per specifications and direction of E/I.(WRD-7.5.5 & PART - A-3.12/5.7.12 Pg-200) |
| 14 | Supplying laying boulder in rock toe, heel trenches of the dam as per design,drawing including the cost of materials royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. (Vide Item No. 5.6.4) / Corrigendum of Part-A,Pg No.-46. |
| 15 | Providing1.5mm thick cement punning including curing etc. complete job as per specifications and direction of E/I.(WRD-7.5.10 & PART-A-3.11 or 5.7.11 Pg No-200) |
| 16 | Providing Centering and shuttering including strutting, propping etc. and removal of form for Foundation, footings, bases of columns, etc. for mass concrete and string courses etc.(Vide Item No.- 5.3.17 of WRD Part- B, Pg No.- 110) |
| 17 | Dismantling of structures ( Dismantling of existing structures like culverts, Bridges, retaining walls and other structure comprising of masonary, cement concrete , wood work, steel work, including T&P and scaffolding wherever necessary,sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lits and lead of 1000 meters.)(vide item No .2.04(part(3),Part -A , Pg .no.-196) |
| 18 | Providing and laying P.C.C. or R.C.C. M -200 with nominal mix of (1:1.5:3) in various componet of dam superstructure with approved quality of 20mm graded coarse aggregate of required graded as per design approved quality of sand of requisite F.M (2.5 to 3) washed and screened excluding cost of shuttering or form work as well of reinforcement its cutting, bending, binding and placing but including necessary tools and plants and vibration, cutting, royalty all taxes etc. complete job as per specification and direction of E/l.(Vide Item No.- 5.3.11 of WRD Part- B, Pg No.- 109) / Vide Item No.-5.3.9.1 of BCD, Pg.No.-107. |
| 19 | provinding tor steel reinforcement of 8mm. Dia rods as per approved design and drawing with cutting, bending and binding with annealed wire with cost of wire removal of rust , placing the rods in position ( including carriage of bars to work site) all complete as per building specification and direction of E/I. |
| 20 | Dismantling old plaster & ponting in cement or lime mortar and racking out joints 15mm . Depths watering and disposal of unserviceable materials with all leads all complete job as specification & direction of E/I 5:10:7 B.C.D. Part (B) |
| 21 | Providing HR Gate with fitting fixing all complete by agency |
| 22 | Carriage of materials |
| 23 | (i) Cement – Lead 55 {(P) + 0(k)} |
| 24 | (ii) Sand – Lead 25 KM{(P) + 1KM(k)} |
| 25 | (iii) Stone Chips – Lead 30 KM{(P) + 1KM (k)} |
| 26 | (iv) Boulder lead 30 km (p) + 1 km (k) |
| 27 | After adding GST @18% on total estimated value the total estimated amount is |
| 28 | Labour Cess @1% on above total estimated amount Please Enable Macros to View BoQ information |