| 1 | Dismantling, loading, unloading, transportation, shifting of old DG set of capacity 275 KVA, canopy (if any), silencer,exhaust pipe, panels, power cables, battery chargers, batteries and all other accessories including ducting (if any), disconnection of supply cable i/c dismentalling of DEA set canopy (if any) and reassembling of canopy (if any) at site i/c shifting from RSU CBD Shahdra to TE Bldg. Laxmi Nagar or any other exchange building within the jurisdiction of EE(E)LR as per the directions of Engineer-in-charge etc complete as required. |
| 2 | Dismantling, loading, unloading, transportation, shifting of 300 KVA AVR along with associate AVR By Pass panel, all type of cables, earthing connection etc complete as required includingtransportation from RSU CBD Shahdra to TE Bldg Laxmi Nagar or any other exchange building within the jurisdiction of EE(E)LR as per the directions of Engineer In Charge by heavy labour,chain pulley/hydra and shifting to the desired floor in the building as per location decided by Engineer in charge etc as required. |
| 3 | Dismantling, loading, unloading, transportation, shifting of (5 x 11 TR + 1 x 9 TR)Ductable AC unit along with indoor units & outdoor units, copper piping, drain piping, all types of cables, G.I ducting (if any), cable tray and MS platform / frame (if any) for outdoor AC units etc including transportation from RSU CBD Shahdra to TE Bldg Laxmi Nagar or any other exchange building within the jurisdiction of EE(E)LR as per the directions of Engineer In Charge by using heavy labour,chain pulley/hydra and shifting to the desired floor in the building as per location decided by Engineer in chargeetc as reqd. |
| 4 | Dismantling of Capacitor panel, AVR By pass panel, L T panels, AC panel, Phase reversal panel, change over panels, different types of electrical light fittings, celling fans, wall fans, exhaust fans, air curtain, electric motors with starters (if any), MCB distribution boards, MCCB\"s, Isolators, MCB\"s, various sizes copper/aluminium conductor electrical cables, conduits, earthing connection, cable trays, bus trunking (if any), MCCB box, switch & sockets, power point box, different sizes pvc insulated copper conductor single core cable, GI duct (if any), monoblock pump (if any), air circulator, water cooler (if any), emergency light (if any), window AC / split AC with all accesories (if any), fire panel, fire detectors, hooters, MCP, fire extinguisher cylinders, fire buckets, RSU building high volatge shielded enclosure arrangement (including aluminium sheets, M.S square pipe structure, copper strips for earthing) and any other remaining electrical material available in RSU building including loading, unloading, transportation, shifting from RSU CBD Shahdra to TE Bldg Laxmi Nagar or any other exchange building within the jurisdiction of EE(E)LR as per the directions of Engineer In Charge by using heavy labour,chain pulley/hydra and shifting to the desired floor in the building as per location decided by Engineer in charge and as per terms and conditions attached. Note: 1) The agency has to prepare a detailed Inventory of all Items to be dismantled i/c quantity before dismantling and shifting to other site and submit it to the JE(E) for taking gate pass. 2) The agency is fully responsible for any misplaced/short material receipt from RSU site and suitable recovery will be made for any such item. 3) The cables will be rolled into loops and approximate length should be mentioned in the inventory. |