| 1 | BUILDING PORTION |
| 2 | School building with total plinth area 2740 sqm.(G+1)(RCC Framed Structure) along with andas per preliminary Drawing attached. |
| 3 | PORCH |
| 4 | Multipurpose Hall |
| 5 | Kitchen & Dining Hall (Single Storey) with plinth area: 757.00 Sqm(RCC Framed Structure) as per preliminary Drawing attached. |
| 6 | 1.50 Boys Dormitory (G+2)RCC Framed structure students with 6 Nos Warden Residence with a total plinth area: 3135.00 sqm.(1174.00x1.50+89.00x6) as per preliminary Drawing attached. |
| 7 | 1.50 Girls Dormitory (G+2)RCC Framed structure students with 6 Nos Warden Residence with a total plinth area: 3189.00 sqm.(1770.00x1.50+89.00x6) as per preliminary Drawing attached. |
| 8 | Principal Residence with plinth area: 130.00 sqm.(S/S, RCC Framed structure as per preliminary drawing attached |
| 9 | Vice Principal Residence with plinth area: 106.00 sqm (S/S, RCC Framed structure as per preliminary drawing attached |
| 10 | Type-III-Staff Qtrs 18 Nos with total plinth area 1440 sqm (1 Block G+1 and 1 block G+2 Floors), RCC Framed structure as per preliminary drawing attached |
| 11 | 8. Type-II- Staff Qtrs 13 Nos(2 blocks G+2Floors), with total plinth area 910 sqm RCC Framed structure as per preliminary drawing attached |
| 12 | Guest House residence, S/S, RCC Framed structure with total plinth area 80 sqm as per preliminary drawing attached |
| 13 | Electric Substation Building(S/S, RCC Framed structure with plinth area: 40 sqm. as per preliminary drawing attached |
| 14 | Pump House (S/S, RCC Framed structure with plinth area: 12 sqm. as per preliminary drawing attached |
| 15 | Parents waiting room(S/S, RCC Framed structure with plinth area: 14.51 sqm. as per preliminary drawing attached. |
| 16 | Tuck Shop (S/S, RCC Framed structure with plinth area: 8.91 sqm. as per preliminary drawing attached. |
| 17 | FIRE FIGTING |
| 18 | ROOF TOP |
| 19 | FURNITURE |
| 20 | Development works required as per detail survey& LOP. But major developmental works includes roughly following components: |
| 21 | I. Internal Footpath/pathways – 696 Rmt. |
| 22 | II. Internal Road-CC Pavement (M-30 dewatering with nominal reinforcement)-620 Rmt. |
| 23 | III. Parking with paver block as required as per LOP. |
| 24 | UG Water recharge pit-1 Nos of capacity 50000 ltrs. |
| 25 | External Water supply 25 mm |
| 26 | External Water supply 50mm. |
| 27 | UG Water Tank of Capacity – 100000.00 Ltrs.(1 LAC Ltrs) |
| 28 | Submersible pumping set |
| 29 | External Apron drainage system(0.30x0.30 – 642 mtrs |
| 30 | External storm water connecting drain – 30.00 rmts |
| 31 | Cross drainage(0.3 x 0.3) -5 nos |
| 32 | Cross drainage(0.45 x 0.45) -5 nos |
| 33 | External Sewerage system 300mm |
| 34 | External Sewerage system200mm. |
| 35 | Septic tank – 700 user |
| 36 | Septic tank –200 users |
| 37 | Street lighting(Elect. And Solar) |
| 38 | Providing of DG Set 58.50 KVA |
| 39 | 400M EPDM(Ethylene Propylene Diene Monomer) Running Track & Football Field with gallery, Two side RCC bleachers(sitting arrangement) with kotastone finishing. |
| 40 | Horticulture work with carpet grass, palm tree and hedging etc. |
| 41 | Multi Sports Complex – 2Nos(1 for Boys and 1 for girls). |
| 42 | Bore well – 2 Nos as directed by Engineer in Charge. |
| 43 | Retaining wall 3m height, length= 500 mtrs. |
| 44 | Land development (cutting and Filling) as per site condition |
| 45 | Campus Boundary Wall |
| 46 | Campus boundary wall total length 1450 Rmt |
| 47 | Main entry gate with sentry booth. |