| 1 | Earth Excavation in hard soil within initial lead of 50m and initial lift of 1.5m and initial lift of 1.5 m including rough dressing and leveling the bed as per the specification approved by the dept. and direction eng-in-charge |
| 2 | Filling in foundation with sand well watered and rammed including cost,conveyance,royality and taxes etc. complete of all materials to work site as the specification approved by the dept. and direction -i-charge |
| 3 | p.c.c(1:3:6)with 4cm size HG CRUSHER BROKEN metal including all cost,conveyance,royality and taxes etc. complete of all materials to work site as per specification approved by the deptt. and direction of engg-in-charge. |
| 4 | RCC work in CC M-20 grade oc concrete using 20mm and down graded size Base of column pedestal column up to plinth band |
| 5 | RCC work in CC M-20 grade oc concrete using 20mm and down graded size Base of column pedestal column up to plinth band middle |
| 6 | RCC work in CC M-20 grade oc concrete using 20mm and down graded size Base of column pedestal column up to Lintel |
| 7 | RCC work in CC M-20 grade oc concrete using 20mm and down graded size Base of column pedestal column column and beam |
| 8 | RCC work in CC M-20 grade oc concrete using 20mm and down graded size Base of column pedestal column up toRoof slab |
| 9 | RCC work in CC M-20 grade oc concrete using 20mm and down graded size Base of column pedestal column up toChhaja |
| 10 | Cutting,straightening coiled or bent up TOR steel,bending,binding,welding and jointing if necessary and tying the grills and placing in position including cost |
| 11 | Fly ash bric masonary in cement mortar (1:6)including watering and curing etc complete includig cost conveyance,royalties,cess DMF and EMF |
| 12 | in superstructure |
| 13 | 16 mm thick cp (1,:6) after racking out the joints including watering and curing etc. |
| 14 | 12mm thick CP in cm(1:46to RCC surface finished smooth including closed deeping chipping and slury |
| 15 | 12mm thick CP in cm(1:4)to RCC surface finished smooth including closed deeping chipping and slury |
| 16 | 6mm thick CP in cm(1:4)to RCC surface finished smooth including closed deeping chipping and slury |
| 17 | 2.5cm thick grading plaster in cm(1:2:2) over roof slab with 6mm sise hb chips |
| 18 | Supplying,fitting and fixing verified tiles in floors of size 600mmx600 mm of approved make laid on 20mm thick cement mortar (1:4) |
| 19 | priming one coat with any approved primer to including watering and curing complete |
| 20 | wall painting 2 coats to walls with water proffing weather coat pain of any approved shade on New work afetr cleaning |
| 21 | wall painting 2 coats to walls with plastic emulsion paint of any approved shade on New work |
| 22 | supplying ,fitting and fixing of window(sliding type) mad eup aluminium section 9778 as windows frame |
| 23 | painting 2 coats of synthetic enamel paint over coat of primer of approved qulaity |
| 24 | Supplying ,fitting and fixing of window(sliding type) made up aluminium section 97778 |
| 25 | add for sign board and photograph (pre during and post) Please Enable Macros to View BoQ information |