|
| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Dismantling brick work and including stacking asdirected by the engineer-in-charge with in a distance of 60 meter (200 f+B5:B22eet). |
| 3 | Dismantling old plaster including raking out joints and disposal of debriswith in a distance of 60 meter directed by the engineer-in-charge. |
| 4 | Earth work in excavation in foundation ordinary soil including lift upto 1.50m and lead upto 30m & alsoi/c backfilling, watering and ramming of excavated earth in to the trenches, cost of all material, T&P etc. complete. |
| 5 | C.C. (1:3:6) in base in cement, coarse sand, aggregates including all cost of material, labour, T&P etc. complete. |
| 6 | Ist class brick work in (1:5) in Cement Mortarincluding all cost of material, labour, T&P etc. complete. |
| 7 | 12mm thick plaster 1:4 C.M. i/c all cost of labour, material T&P. |
| 8 | Providing cement primer on old/new surface i/c cost of all material, labour T & P etc. Complete. |
| 9 | Centering and Shuttering for R.C.C. workincluding all cost of material, labour, T&P etc. complete. ( including Mummty) |
| 10 | R.C.C. (1:1.5:3)including all costof material, labour, T&P etc. but excluding cost of steel bending,binding complete. |
| 11 | Supply and placing of reinforcement including all cost of reinforcement, bending, binding, cost of bending wire etc. complete. |
| 12 | C.C. (1:2:4) in base in cement, coarse sand, aggregates including all cost of material, labour, T&P etc. complete. |
| 13 | Providing and fixing of steel gate i/c all cost of labour, material T&P including fitting. including fitting. |
| 14 | R.B.M. below interlocking C.C.Tiles. |
| 15 | Providing and Laying 80 mm thick I shaped interlocking CC tiles i/c all cost of labour, material T&P.as directed by Engineer-in-charge. |
| 16 | Providing and Laying 5mm thick ordinary Sand under interlocking CC tilesi/c all cost of labour, material T&P.as directed by Engineer-in-charge. |
| 17 | Providing cement primer on old/new surface i/c cost of all material, labour T & P etc. Complete. |
| 18 | Finishing wall with one coat of water proof cement paint weather coat of approved quality on previously new surface with this paint to give an even shade includingsupply of all materials, labour, Tools and plants etc. required for proper completion of the work. |
| 19 | Applying primer coat over new Steel or other metal surface after paint including preparing wood work surface including preparingthe surface by thoroughly cleaning oil grease dirt and other foreigh matter and scoured with wire brushes fine steel/wood scrappers sand papering and knotting including coat of all and supply of all materials,labour and T&P etc. required for proper completion of the work. |
| 20 | Painting two coat over Priming coat (But excluding cost of priming coat) on wood or Steel or other metal surface with superior synthatic enamel paint of standard make brushing to give an even shade and finished and including cleaning the surface all dirt dust and other foreign matter sand papering and striping including cost matter and scoured withwire brushes fine steel/wood scrappers sand papering and knotting including coat of all and supply of all materials,labour and T&P etc. required for proper completion of the work. |
| 21 | Providing and fixing 50 mm dia P.V.C. vent pipei/c all fitting such as sockit, Tee, Bend andetc.and labour T&P etc. |
| 22 | Providing and fixing100 mm dia P.V.C. vent pipei/c all fitting such as sockit, Tee, Bend andetc.and labour T&P etc. |
| 23 | Providing and fixing white vitreous china orissa pattern W.C. pan of size 580x440 mm with P/S trap, 10 lit low level white P.V.C. flushing cistern with manually controlled device with all fitting i/call material, labour T&P etc . |