| 1 | Supply of PG Clamp 95 sq.mm to 25 sq.mm |
| 2 | Supply of PG clamp 95 sq.mm to 95 sqmm |
| 3 | Supply of MS Stay Clamps for PCC Pole with Nut & bolt. |
| 4 | Supply ofSuspension Clamp with I hook. |
| 5 | Supply of Clamp For LT Distribution Box with Nut & bolt. |
| 6 | Supply of MS Clamp for Dead end Clamp with Nut & bolt. |
| 7 | Supply of Stay Insulator. |
| 8 | Supply of Piercing Connector25 sq.mm to 16 sq.mm2. |
| 9 | Supply of Piercing Connector120 sq.mm to 95 sq.mm2. |
| 10 | Supply of LT Distribution Box 3Phase 4Wire. |
| 11 | Supply of AL. Crimping Type Lusg 120 Sq.mm. |
| 12 | Supply of Aluminium Crimping Type Lusg 25 Sq.mm.(4X25) |
| 13 | Supply of half Clamp For LT Distribution Box |
| 14 | Erection of Earthing Rod. |
| 15 | Excavation of Pit for Stay Set |
| 16 | Erection of LT Stay Set |
| 17 | Grouting of Stay Set. |
| 18 | Excavation of Pit for Pole. |
| 19 | Erection of Single PCC Pole |
| 20 | Grouting of Pole. |
| 21 | Dismantling of LT Line 1 phase 2 Wire (Weasel) |
| 22 | Dismantling of LT Line 2 phase 3 Wire (Weasel) |
| 23 | Dismantling of LT Line 3 phase 4 Wire (Weasel) |
| 24 | Cartage of PCC Pole 21 to 50 km |
| 25 | Cartage of Petty Materail 21 to 50 Km |
| 26 | Disconnection & Re-connection of Consumers. |
| 27 | Laying/Erection Comm. LT AB Cable 3X120+95Sq. |
| 28 | Straightning of Tilled Poles |
| 29 | Back Cartage of Petty Materail 21 to 50 Km |
| 30 | Installation of LT Distribution Box. |
| 31 | Fixing of Dead Eend clamps |
| 32 | Fixing of Suspension Clamps with I Hook. |
| 33 | Installation of 120 Sq.mm LT Aluminium Lugs. |
| 34 | Installation of 25 Sq.mm LT Aluminium Lugs. |
| 35 | Fixing of Piercing Connector 120-95 sq.mm. |
| 36 | Fixing of Piercing Connector 120-35 sq.mm. |
| 37 | Fixing of PG Clamp 120 sq.mm to 120 sq.mm. |
| 38 | Fixing of PG Clamp 95 sq.mm to 95 sq.mm. |