| 1 | PROTOCOL ROOM EXTENSTION |
| 2 | Providing and installation of metal steel powder coated base pinup / writing board workstation made in alluminium powder coated section with laminated particle wood working top 19mm marine plywood both side .8mm thick laminated finish as per the design and dimension shown in figure or equivalent. All materials used for above shall confirm to the latest relevant IS standards. |
| 3 | Supplying and fixing of Full Height Storage made up in marine plywood with laminate finish as per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. |
| 4 | Supplying and fixing of 3ft x 12ft height storage made up in marine plywood with laminate finish as per the design and dimension shown in figure or equivalent. All the material used for the above shall confirm to the latest relevant IS standards. |
| 5 | Supplying of Office Table made up with marine plywood with laminate finish as per the design and dimension shown in figure or equivalent. All the materials used for the above items shall confirm to the latest relevant IS standard. Size 4ft x 2ft x 30” |
| 6 | Supplying and fixing of Table Runner made up in marine plywood with laminate finish as per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. |
| 7 | Inside False ceiling made in Gyproc Borad with required Metal Support / chanel Patti / rafter Patti / L patti (ISI Marked ) etc As Per Design.Size-12.4x6.7/outside cabin 2ft x 2ft grid ceiling. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. |
| 8 | Providng and installation of 18 guage alluminium powder coated Partition woodenframe work of 2.5\" x 1.5\" allumnium section with 9mm marine plywood both side laminate finishas per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. |
| 9 | Supplying and fixing ofPedestal made in marine plywood and laminate finish as per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. |
| 10 | Providing and installation of front door partition with door size: 30” x 84”using 18 guage alluminium powder coated Partition woodenframe work of 2.5\" x 1.5\" allumnium section with 12mm marine plywood both side laminate finishas per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards |
| 11 | Providing and fixing Vinyl flooring of approved shade and design with adhesive complete. |
| 12 | Wall painting (two or more coats) with plastic emulsion paint of approved brand and manufacture on new work to give an even shade. |
| 13 | Supplying of Wall Fan anchor or other equivalent brand |
| 14 | Supplying of High back chair as per the design and dimensions shown in Figure or equivalent.All the materials used for the above item shall confirm to the Latest Relevant IS Standards. |
| 15 | Supplying of Visitor Chairs made in ms crome plated as per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. |
| 16 | Supplying of Medium size Working Chairs made in ms crome plated as per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. |
| 17 | Wiring for light point/fan point/exhaust fan point/ call point/call bell point with 1.5 sq.mm FR PVC insulated copper conductor single core cable in surface/recessed PVC conduitwith modular switch,modular plates, suitable size modular GI box of specified category and earthing the point with 1.5 sq.mm FR PVC insulated and copper conductor single core cable etc. as required.Group A-With Cat A Modular Accessories. |
| 18 | 20 Watt consealed round make: Anchor/ Panasonic (White) |
| 19 | Supplying and fixing of Table Points 5A switch Sockets |
| 20 | Supplying and fixing of I/O 2nosper table |
| 21 | Supplying of CCTV 24 Hikvisionchanel 2MP IP,cameras -3/NVR 4ch/1tb HDD/1ch POE switch |
| 22 | A/C DB with MCCB / RCCB - Anchor DB / legarnd switch gear |
| 23 | UPS DB with MCCB / RCCB - Anchor DB / legarnd switch gear |
| 24 | Supplying of intercom/EPBX / phone - 8 lines |
| 25 | Supplying and fixing of ceiling access point D-link 5GHZ 867 MBPS |
| 26 | Supplying and fixing of incomer / Outgoing Panel20 amps each |
| 27 | Lighting DB with MCCB/ RCCB-AnchorDB / Legarnd - Switchgear |
| 28 | Supplying and installation of key phone programming (Make: Panasonic) |
| 29 | SupplyingandfixingofCeilingAccess Point - D- link 5GHZ 867 MBPS |
| 30 | Supplying of 4 u server rack |
| 31 | Supplying ofPatch Panel Dlink Loaded -24 port |
| 32 | Supplying of 24 port L2 Manageable Switch CISCO |
| 33 | Installation of wiring for UPS connection |
| 34 | Notice Board & Essel |
| 35 | Filming on glass |
| 36 | Signages |
| 37 | Removing Existing Furniture / Cleaning / Site Clearance |
| 38 | Breaking and demolishing of wall for making a window including plaster paint and making a sliding window in alluminium section powder coated section 22 gauge ivory colour Window size : 4ft x 4ft |
| 39 | PROTOCOL ROOM EXTENSION AIR CONDITIONER |
| 40 | Supply of High side equipments |
| 41 | DAIKIN 4 HP VRV TOP DISCHARGE VRV ODU UNIT SUPPLY (MODEL: RXMQ4BRV16) |
| 42 | DAIKIN 2 TR 4 WAY CASSETTE AC UNIT SUPPLY (FXFSQ63ARV16) |
| 43 | DAIKIN 0.6 TR HI WALL UNIT SUPPLY(MODEL: FXAQ20ARVE6) |
| 44 | REFNETS |
| 45 | Supply Of Low Side |
| 46 | Standard Installation, testing & commissioningof VRV ODU units |
| 47 | Standard Cassette ac installation |
| 48 | Standard HI WALL unit installation |
| 49 | Supply, installation, testing & commissioning of Refrigerant copper pipe suitable for Ac system & having guage thickness and inner dia as below. Piping should be insulated with Nitrile rubber foam tube type sleves for over coating and insulating on provided copper pipes having 13mm and 19MM thickness, RR make / JOBU Daikin Make |
| 50 | copper pipe |
| 51 | Supply of Control Cabling between Indoor & Outdoor Units. The Control Cable used shall be minimum Sheathed multistranded cable, properly protected in a GI Conduit with proper Junctions, end Flexible connections of 300mm for final connections with the Indoor Units with proper Glands etc., |
| 52 | Supply and laying, of 2.5 sqmm / 4C ,Communication cable |
| 53 | Supply and fixing of PVC drain water piping with 6mm thick nitrile rubber insulation complete with fittings (elbows, tees, reducers, U-traps, sockets etc as required) and any other item required to make the system complete.Nominal diameters in mm as indicated below. |
| 54 | 32mm |
| 55 | core cutting |
| 56 | Cassette Ac IDU installation kit (Fastner, Treading Rod Etc) |
| 57 | Supply of Extra refrigerant gas R 410a |
| 58 | ODU Ductable Fabrication work |
| 59 | Library Room |
| 60 | Supplying and fixing of Full Height book cabinetmade up in marine plywood with laminate finish as per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. Size 7ft x 9ft x 20” |
| 61 | Supplying and fixing of Full Height book cabinetmade up in marine plywood with laminate finish as per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. Size 13.5ft x 9ft x 20” |
| 62 | Supplying and fixing of Full Height book cabinetmade up in marine plywood with laminate finish as per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. Size 10ft x 9ft x 20” |
| 63 | Supplying of Office Table ofmade up with marine plywood with laminate finish as per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. Size 8 ft x 4ft |
| 64 | False ceiling made in Gyproc Borad with required Metal Support / chanel Patti / rafter Patti / L patti (ISI Marked ) etc As Per Design.Size-12.4x6.7All the materials used for the above item shall confirm to the Latest Relevant IS Standards. |
| 65 | Providing and installation of front door partition with door size: 24” x 84”using 18 guage alluminium powder coated Partition woodenframe work of 2.5\" x 1.5\" allumnium section with 12mm marine plywood both side laminate finishas per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards |
| 66 | Providing and fixing Vinyl flooring of approved shade and design with adhesive complete. |
| 67 | Wall painting (two or more coats) with plastic emulsion paint of approved brand and manufacture on new work to give an even shade. |
| 68 | Wall Fan |
| 69 | Supplying of Medium size Reading Chairs made in ms crome plated as per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. |
| 70 | Wiring for light point/fan point/exhaust fan point/ call point/call bell point with 1.5 sq.mm FR PVC insulated copper conductor single core cable in surface/recessed PVC conduitwith modular switch,modular plates, suitable size modular GI box of specified category and earthing the point with 1.5 sq.mm FR PVC insulated and copper conductor single core cable etc. as required.Group A-With Cat A Modular Accessories. |
| 71 | 20 Watt consealed round make: Anchor/ Panasonic (White) |
| 72 | Supplying and fixing of Table Points 5A switch Sockets |
| 73 | Supplying and fixing of I/O 2nosper table |
| 74 | LIBRARY ROOM AIR CONDITIONER |
| 75 | Supply of High side equipments |
| 76 | DAIKIN 4 TR 4 WAY CASSETTE AC UNIT SUPPLY (FCQF24ARV16) |
| 77 | Supply Of Low Side |
| 78 | Standard Cassette ac installation |
| 79 | Supply, installation, testing & commissioning of Refrigerant copper pipe suitable for Ac system & having guage thickness and inner dia as below. Piping should be insulated with Nitrile rubber foam tube type sleves for over coating and insulating on provided copper pipes having 13mm and 19MM thickness, RR make / JOBU Daikin Make |
| 80 | copper pipe |
| 81 | Supply of Control Cabling between Indoor & Outdoor Units. The Control Cable used shall be minimum Sheathed multistranded cable, properly protected in a GI Conduit with proper Junctions, end Flexible connections of 300mm for final connections with the Indoor Units with proper Glands etc., |
| 82 | Supply and laying, of 2.5 sqmm / 4C ,Communication cable |
| 83 | Supply and fixing of PVC drain water piping with 6mm thick nitrile rubber insulation complete with fittings (elbows, tees, reducers, U-traps, sockets etc as required) and any other item required to make the system complete.Nominal diameters in mm as indicated below. |
| 84 | 32mm |
| 85 | core cutting |
| 86 | Cassette Ac IDU installation kit (Fastner, Treading Rod Etc) |
| 87 | Supply of Extra refrigerant gas R 410a |
| 88 | ODU Ductable Fabrication work |
| 89 | GAD OFFICE |
| 90 | Providing and installation of metal steel powder coated base pinup / writing board workstation made in alluminium powder coated section with laminated particle wood working top 19mm marine plywood both side .8mm thick laminated finish as per the design and dimension shown in figure or equivalent. All materials used for above shall confirm to the latest relevant IS standards. |
| 91 | Supplying and fixing of Full Height Storage made up in marine plywood with laminate finish as per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. |
| 92 | Supplying of Office Table ofmade up with marine plywood with laminate finish as per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. |
| 93 | Supplying and fixing of Table Runner made up in marine plywood with laminate finish as per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. |
| 94 | Providng and installation of 18 guage alluminium powder coated Partition woodenframe work of 2.5\" x 1.5\" allumnium section with 12mm marine plywood both side laminate finishas per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. |
| 95 | Supplying and fixing ofPedestal made in marine plywood and laminate finish as per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. |
| 96 | Providing and installation of front door partition with door size: 24” x 84”using 18 guage alluminium powder coated Partition woodenframe work of 2.5\" x 1.5\" allumnium section with 12mm marine plywood both side laminate finishas per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards |
| 97 | Providing and fixing Vinyl flooring of approved shade and design with adhesive complete. |
| 98 | Wall painting (two or more coats) with plastic emulsion paint of approved brand and manufacture on new work to give an even shade. |
| 99 | Wall Mounted Fans of equilant brands |
| 100 | Supplying of Medium size Working Chairs made in ms crome plated as per the design and dimensions shown in Figure or equivalent. All the materials used for the above item shall confirm to the Latest Relevant IS Standards. |
| 101 | Supplying of single sofa chairs for waiting area made in sal wood frame with high density foam with good branded fabric Size 30” x 24” x 18” |
| 102 | Wiring for light point/fan point/exhaust fan point/ call point/call bell point with 1.5 sq.mm FR PVC insulated copper conductor single core cable in surface/recessed PVC conduitwith modular switch,modular plates, suitable size modular GI box of specified category and earthing the point with 1.5 sq.mm FR PVC insulated and copper conductor single core cable etc. as required.Group A-With Cat A Modular Accessories. |
| 103 | 20 Watt consealed round make: Anchor/ Panasonic (White) |
| 104 | Supplying and fixing of Table Points 5A switch Sockets |
| 105 | Supplying and fixing of I/O 2nosper table |
| 106 | Supplying of CCTV 24 Hikvisionchanel 2MP IP,cameras - 8 nos24\" NVR 16CH/2TB/HDD / POE switch |
| 107 | Supplying and fixing of incomer / Outgoing Panel20 amps each |
| 108 | Lighting DB with MCCB/ RCCB-AnchorDB / Legarnd - Switchgear |
| 109 | Supplying of Intercom/ Epbx / Phone -40 lines |
| 110 | Supplying and installation of key phone programming (Make: Panasonic) |
| 111 | Supplying and fixing of Ceiling Access Point - Tplink 5GHZ 867 MBPS |
| 112 | Supplying of 12 u server rack |
| 113 | Supplying ofPatch Panel Dlink Loaded -24 port |
| 114 | Supplying of 24 port L2 Manageable Switch CISCO |
| 115 | Installation of wiring for UPS connection |
| 116 | Notice Board & Essel |
| 117 | Supplying and installation of alluminium 18 gauge powder coated sliding windows using 8mm clear glass including installation charges |
| 118 | Supplying and fixing of AC ducts using 18mm marine plywood with laminate finish for covering of AC pipes |
| 119 | A/C DB with MCCB / RCCB - Anchor DB / legarnd switch gear |
| 120 | UPS DB with MCCB / RCCB - Anchor DB / legarnd switch gear |
| 121 | Supplying of roller blind as per the size and colour |
| 122 | Removing existing furniture and shifting within 200 mtr radious area |
| 123 | Site clearing / cleaning / Debris throw within 5km area |
| 124 | Opening of a new window on wall using masionary work including plaster painting Size: 4ft x 2.5ft |
| 125 | Supplying and installation of alluminium 18 gauge powder coated sliding windows for new opening windows using 8mm clear glass including installation charges |
| 126 | GAD ROOM AIR CONDITIONER |
| 127 | Supply of High side equipments |
| 128 | DAIKIN 2 TR HI WALL AC SUPPLY WITH WIRELESSREMOTE (MODEL: FXAQ63ARVE6) |
| 129 | DAIKIN 1.5 TR HI WALL AC SUPPLY WITH WIRELESSREMOTE (MODEL: FXAQ50ARVE6) |
| 130 | DAIKIN 14HP VRV ODU UNIT SUPPLY (MODEL:RXQ14ARY6) |
| 131 | SUPPLY OF REFNET JOINT |
| 132 | Supply Of Low Side |
| 133 | Vrv Odu Installation 14 HP |
| 134 | Installation testing and commissioning of indoorunit. |
| 135 | Installation of Highwall Units |
| 136 | Supply and fixing of PVC drain water piping with 6mm thick nitrile rubber insulation complete with fittings (elbows, tees, reducers, U-traps, sockets etc as required) and any other item required to make the system complete. Nominal diameters in mm asindicated below. |
| 137 | 33 mm |
| 138 | Supply, installation, testing & commissioning of Refrigerant copper pipe suitable for Split Ac system with R32 gas & having guage thickness and inner dia as below. Piping should be insulated with Nitrile rubber foam tube type sleves for over coating and insulating on provided copper pipes having 13mmthickness, |
| 139 | Supply & fixing of M.S.Structural work for outdoor units painted with blace epoxy paint fabricated as per the site requirment/ design only split ac |
| 140 | Supply & fixing of M.S.Structural work for outdoor units painted with blace epoxy paint fabricated as per the site requirment/ design only split ac |
| 141 | Supply and laying with PVC conduit, of 1 sqmm / 2C ,Communication cable for vrv units |
| 142 | Pressure Testing of the entire system upto 600 PSI, and holding the same for minimum 48 Hours.Flushing the system, Refrigerant Gas Charging in the system and final commissioning of the system. |
| 143 | Supply & charging of additional refrigent gas R 410A |
| 144 | Lifting & Shifting of VRV Outdoor Unit with LabourCharges |
| 145 | Core Cutting (if required) |