| 1 | Material |
| 2 | Bracing Clamp Top SP-55 with Nut & Bolt |
| 3 | Earth Wire Clamp for SP-55 with Nut & Bolt |
| 4 | PP & Clamp with Nut & Bolt ST Pole-55 |
| 5 | Bracing Clamp Bottom with Nut & Bolt SP-55 |
| 6 | Bracing Set 65x65x6 mm |
| 7 | Stay Clamp for SP-55 With Nut & Bolt |
| 8 | 33 KV Mid Span Jointing Kit |
| 9 | 33 KV Tension Clamp with Bail & IPC |
| 10 | 33 KV Cable Ties for Pin Insulator |
| 11 | 33 KV IPC for Covered to Covered Conductor |
| 12 | 33 KV IPC for Covered to Bare Conductor |
| 13 | IPC with aluminium bail for earthing |
| 14 | 33 KV Polymer Tension Insulator |
| 15 | 33 KV Polymer Pin Insulator (for covered conductor) |
| 16 | 33 LV ACS AL-59 (232 sqmm) Covered Conductor (as per EN 50397-1:2006). The conductor shall be stranded, round, non compacted and water tight, Non compacted shall be comply with all the requirement of EN 50397-1.2006 The stranded conductor shall be longitudionally water blocked by means of a water blocking material the semi conducting screen inner insulation and outer insulation should be extruted in one step. The outer covering insulation shall be UV stabilized tracking resistant black XLPE |
| 17 | Labour |
| 18 | Construction of returning wall & plinth |
| 19 | Erection of earthing rod |
| 20 | Fabrication of steel |
| 21 | Excavation of pit for stay set |
| 22 | Grouting of stay set |
| 23 | Excavation of pit for pole |
| 24 | Erection of SP-55 single pole |
| 25 | Erection of SP-55 double pole |
| 26 | Erection of SP-55 (11 KV/ 33 KV) four pole |
| 27 | Grouting of pole |
| 28 | Muffing of pole |
| 29 | Looping & Chopping of Tree Branches |
| 30 | Cartage SP-55 Pole, 150-200 km |
| 31 | Cartage of petty material, 150-200 km |
| 32 | Headload cartage SP-55 Pole (0-1 km) |
| 33 | Headload cartage of material (1-3 km) |
| 34 | Laying earth wire for earth on 33 KV line |
| 35 | Dismantling of 33 KV line with earth wire |
| 36 | Fixing of 33 KV tension clamp with IPC |
| 37 | Fixing of 33 KV suspesion ties |
| 38 | Fixing of 33 KV IPC for CC to CC conductor |
| 39 | Fixing of 33 KV IPC for CC to bare conductor |
| 40 | Fixing of 33 KV mid span jointing kit |
| 41 | Fixing of IPC with Aluminium bail for earthing |
| 42 | Fixing of bracing set |
| 43 | Laying, sagging of covered conductor for 33 KV |
| 44 | Back Carriage of scrap material |
| 45 | Fixing of Aluminium Lugs |