| 1 | SURFACE DRESSING : Surface dressing n exc 15 cm deep in soft loss soil along with Site Clearance ofServiceable Materials:- Any vegetable, earth, sand, gravel, stone, debris of brickwork, concrete, masonry, MS frame work, iron, steel, pipelines etc., |
| 2 | DISMANTLING : Dismantling of following existing structure of any description and nature at any place and position as per site in-charge including shifting/cleaning the materials from site. Complete in all respect as directed by EIC. a) CGI Sheet |
| 3 | DISMANTLING : Dismantling of following existing structure of any description and nature at any place and position as per site in-charge including shifting/cleaning the materials from site. Complete in all respect as directed by EIC.b)Dismantling fencing wire mesh,any type |
| 4 | DISMANTLING : Dismantling of following existing structure of any description and nature at any place and position as per site in-charge including shifting/cleaning the materials from site. Complete in all respect as directed by EIC. c)Brickwork or stone/ boulder masonry, built in cement morter including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles |
| 5 | PCC IN FLOOR : Providing PCC type B-1, 1:2:4 (20 mm aggregate) in foundation filling Floor, Mass Concrete.M&L |
| 6 | BRICK SOLING: Bricks, sub class B, laid dry, laid flat, in floors, old size bricks include for laying on and including 25mm thick layer of sand and filling the joints with same. |
| 7 | RCC : Supply providing laying Reinforced cement concrete Design Mix M-20 with 20mm graded aggregate in Foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete all complete |
| 8 | STEEL REINFORCEMENT : TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips. |
| 9 | BRICK WORKS : Brickwork with subclass‘B’ bricks,straight or curved on plan exc 6m mean radius built in cement morter 1:4 |
| 10 | PLASTERING :Renderingcement plaster 10 mm thick on fair faces of brick work or concrete surfaces.: cement plaster 1:6. Rendering is to be finished even & smooth without using extra cement. |
| 11 | NET FINISHING EXTRA CEMENT : Rendering 10mm thick on fair faces of brick work or concrete surfaces, if the additional thickness is provided as floating/setting coat. |
| 12 | WEARPROOF TOPPING: Proving & Laying 20mm thick Wearproof topping with PCC, 1:2:4 (6mm graded aggregate with 15% dust) incorporating an approved metallic floor hardner, laid on concrete floors and pavings, and finished even & smooth by Brushing neat cement slurry with 3.0kg of cement per sq. metre |
| 13 | WEARPROOF TOPPING: Suppy only Metallic floor hardener, quality as approvedby MSF Authority. Quantity- minimum 3.0 Kg per 1.0 Sqm or as per manufacturer specification. |
| 14 | MS FRAME WORK : Framed work as in doors or gates of angle or other section with gusset plates, rails, braces, etc., complete, drilled for fixing of steel sheeting or other covering.Doors, etc. to be prepared for hanging or sliding with and including either hooks and hinges or steel hanging door fittings (exclusive of steel sheeting or other covering, running rails and guides) and hanging; also fastening and fixing completeSuppy & Painting instructural steel with one shop coat of zinc chromate primer paint (including preparation of surface) at Contractor’s workshop before fabrication |
| 15 | MS FRAME WORK : Supply & fixing Expanded metal Weight per square metre n. Exc 4 kg, cut to length, bent to shape required and tying with and including annealed mild steel wire not less than 0.9mm dia or fixing with galvanised steel staples supplied and fixed complete to wood or steel members |
| 16 | Corrogated Galvalume Sheeting: Supplying & fixing Pre-painted galvalume aluminium zinc coating GI based corrugated steel sheets 0.50 mm thick of any colour having tensile strength of 550 Mpa &total coating (Zinc-AL) 150gsm as in roof covering and cladding to wall, fixed with J/L hooks with EPDM washers to fix with existing structure.a) Roof covering (Slope) |
| 17 | Corrogated Galvalume Sheeting: Supplying & fixing Pre-painted galvalume aluminium zinc coating GI based corrugated steel sheets 0.50 mm thick of any colour having tensile strength of 550 Mpa &total coating (Zinc-AL) 150gsm as in roof covering and cladding to wall, fixed with J/L hooks with EPDM washers to fix with existing structure.b) Curve roof covering |
| 18 | Plain Galvalume Sheeting: Supplying & fixing Pre-painted galvalume aluminium zinc coating GI based plain steel sheets 0.50 mm thick of any colour having tensile strength of 550 Mpa &total coating (Zinc-AL) 150gsm as in roof covering and cladding to wall, fixed with J/L hooks with EPDM washers to fix with existing structure. |
| 19 | MILD STEEL SHEETING :Supplying, fitting & fixing 2.50mm thick plain, black, mild steel sheeting, in valley gutters by revetting or continuous welding. Minimum end over lapping is 100 mm. M&L |
| 20 | MILD STEEL SHEETING :Supplying, fitting & fixing 1.60mm thick plain, black, mild steel sheeting for dividing strip |
| 21 | DOWNTAKE PIPE (M&L) : Supplying, laying, cutting, fitting & fixing of 100mm dia MS ERW PIPE fixed to walls complete with suport, fitting bend, tees, flanges and all necessary accessories in any lenth laid in trenches. the joints of pipeline should be made water proof. M&L a) 100mm dia MS ERW PIPE |
| 22 | CLEANING OF VALLEY GUTTER & DOWN TAKE PIPES ETC : Taking down eaves gutters andrainwater pipes (any size or pattern), including all fittings, heads, shoes, bends, swan-necks, etc., including cleaning or refixing overall as fixed along the centre line over fittings and accessories. Cleaning properly the smoke dust, silt, leaves & other materials from the valley gutter & down take pipes of any size, description & nature at any place,position & height as per site requirerment including cleaning & removing of rubbish connected with surface drains (open or covered) laying inside the section upto the outside main drain as per instruction of S-I-C.Rain water must pass smoothly without any leakage through valley gutter & downtake pipes. Applying evently a tack coat of industrial bitumen 85/25 at the rate 1.2 kg/sqm. Whole job should be completed as per direction of E-I-C. |
| 23 | PAINTING : Supply & painting in Surfaces of any description, over 10cm in width or girth,not otherwise described with 2 coats of synthetic enamel paint |
| 24 | CONTRACTORS\" PROPERTY/ CREDIT ITEM: The dismantled materials will be contractor\"s property & deduction will be made on these materials.The contractor should visit the site before making quotation.b) CGI Sheets/CGI Curve Sheets |