|
| 1 | GST % for the tender Please select the rate of GST in cell AY13. Rate selected shall be applicable for the entire BoQ. |
| 2 | F&S AMC SERVICE ITEMS |
| 3 | Servicing of solenoid valve of deluge valve of foam flooding system on quarterly basis |
| 4 | Inspection, maintenance, dechocking & cleaning of foam pourer system by opening of foam maker assembly and flushing with water, performance testing and re-install foam makers in original condition including all labours, tools and tackles, complete in all respect. Including cold cutting of stud & bolts along with replacement of Gasket and stud bolt, if any as per direction of EIC. (On quarterly basis) |
| 5 | Maintenance and inspection of 5/9Kg CAPACITYDCP extinguisher as per direction of EIC. Reporting to be done as per SHE manual format including oiling, greasing, testing as per direction of EIC inclusive of all tools & tackles, consumable, transportation labour charges etc(Rate per extinguisher) |
| 6 | Maintenance and inspection of 50/75 KG. CAPACITYDCP extinguisher as per direction of EIC. Reporting to be done as per SHE manual format including oiling, greasing , testing as per direction of EIC inclusive of all tools & tackles, consumable, transportation labour charges etc (Rate per extinguisher) |
| 7 | Maintenance and inspection of 2 KG. CAPACITYCO2 extinguisher as per direction of EIC. Reporting to be done as per SHE manual format including oiling, greasing, testing as per direction of EIC inclusive of all tools & tackles, consumable, transportation labour charges etc(Rate per extinguisher) |
| 8 | Maintenanceand inspection of4.5 KG. CAPACITYCO2 extinguisher as per direction of EIC. Reporting to be done as per SHE manual format including oiling, greasing, testing as per direction of EIC inclusive of all tools & tackles, consumable, transportation labour charges etc (Rate per extinguisher) |
| 9 | Maintenanceand inspection of 6.8KG. CAPACITYCO2 extinguisher as per direction of EIC. Reporting to be done as per SHE manual format including oiling, greasing, testing as per direction of EIC inclusive of all tools & tackles, consumable, transportation labour charges etc(Rate per extinguisher |
| 10 | Maintenance and inspection of water cum foam monitors and hydrants as per direction of EIC. Reporting to be done as per SHE manual format including oiling, greasing , testing as per direction of EIC inclusive of all tools & tackles, consumable, transportation labour charges etc(Rate per monitor/hydrant) |
| 11 | Maintenance and inspection of fire fighting delivery hoses as per direction of EIC. Reporting to be done as per SHE manual format including oiling , greasing ,testing as per direction of EIC inclusive of all tools & tackles, consumable, transportation labour charges etc(Rate per hose) |
| 12 | Complete overhauling of hand operated siren including oiling , greasing, painting and testing as per direction of EIC inclusive of all tools & tackles, consumable, transportation etc. |
| 13 | Dechocking of foam sprinkler nozzles provided in main line engine shed by removing the nozzles , flushing the system, refitting the nozzles & cleaning the Y strainer near deluge valve complete in all respect inclusive of tools tackles, labours , consumables like teflon tape etc. as per direction of EIC(Rate per engine shed) |
| 14 | TESTING of AFFF as per BIS: 4989 from reputed institute like Gujarat Industrial Research of all batches available at Jamnagar pump station (Rate per period) |
| 15 | Half Yearly Calibartion of Portable type Gas detector(Explosivemeter /Oxygen meter/Multigas detector from govt approved /origional manufactureparty & submission of certifacte accordingly as per direction of EIC including transportation, consumable, tools and tackle etc. |
| 16 | Hydrostatic testing, inspection of safety valve,andrefilling of high pressure cylinder through CCE approved party andchargingupto required pressure includingtakingdelivery of the cylinder from the station and returning the same inclusive of all labour material, transportation and all the other incidental expenses.The cylinder is to be returned back to the station within 15 working days from the date of receiving from the station. (For 2Kg CO2 cyl.) |
| 17 | Hydrostatic testing, inspection of safety valve,andrefilling of high pressure cylinder through CCE approved party andchargingupto required pressure includingtakingdelivery of the cylinder from the station and returning the same inclusive of all labour material, transportation and all the other incidental expenses)The cylinder is toT be returned back to the station within 15 working days from the date of receiving from the station.(For 4.5 Kg CO2 cyl.) |
| 18 | Hydrostatic testing, inspection of safety valve,andrefilling of high pressure cylinder through CCE approved party andchargingupto required pressure includingtakingdelivery of the cylinder from the station and returning the same inclusive of all labour material, transportation and all the other incidental expenses). The cylinder is to be returned back to the station within 15 working days from the date of receiving from the station.(For 6.8 Kg CO2 cyl.) |
| 19 | Refilling of 2.0 KG CO2 cylinder all labour, transportation etc. complete as per specification and direction of EIC/Site-Engineer. The cylinder is to be returned back to the station within two week from the date of receiving from the station. |
| 20 | Refilling of 4.5KG CO2 cylinder all labour, transportation etc. complete as per specification and direction of EIC/Site-Engineer. The cylinder is to be returned back to the station within two week from the date of receiving from the station. |
| 21 | Refilling of 6.8KG CO2 cylinder all labour, transportation etc. complete as per specification and direction of EIC/Site-Engineer. The cylinder is to be returned back to the station within two week from the date of receiving from the station. |
| 22 | Refilling of breathing apparatus set cylinder with dry compressed air up to a pressure of 200/300 Bar as per direction of EIC, inclusive of transportation, handling charges, hydrotesting from CCE approved party complete in all respect |
| 23 | Refilling of CO2 gas in cartidges for using in DCP extinguishersincluding all labour, transportation etc. complete as per specification and direction of EIC/Site-Engineer. (CO2 CARTRIDGE OF 200gms) |
| 24 | Hydrotesting of DCP Type Fire Extinguishers of various capacities at an internal pressure of 30 kgf/cm2 as per IS-2171 and OISD-STD-142. Painting of the cylinders with one coat of red oxide primer and two coats of synthetic enamel(Asian Paint / Berger / Nerolac ) paint of desired shade(including trolley if required) - 75 KG capacity DCP Extingusher |
| 25 | Hydrotesting of DCP Type Fire Extinguishers of various capacities at an internal pressure of 30 kgf/cm2 as per IS-2171 and OISD-STD-142. Painting of the cylinders with one coat of red oxide primer and two coats of synthetic enamel(Asian Paint / Berger / Nerolac ) paint of desired shade(including trolley if required) - 5/9 KG capacity DCP Extingusher |
| 26 | For 750 GPM monitor on monthly basis -checking, inspection, servicing,maintenance, greasing, cleaning, oiling, along with all tools, tackles ,manpower material supply, oiling through grease nipple provided on bearing worm wheel and worm shaft, cleaning, performance checking for complete vertical and horizontal movement, water throw, foam suction, ensuring proper tighting off flanges, clearing the debris around the etc as per approved procedure including tools & tackles, report submission complete as per direction of Site Engineer/EIC. Water resistant low friction synthetic grease, grease gun and all other consumable etc shall be arranged by vendor. After testing, AFFF j erry-can must be positioned and replenished near moniotr including shifting, transportation etc. |
| 27 | Filling of foam compound/foam solution in foam tanks/foam trolley of fire fighting system in pump station area through 30L jerry cans including labour, collecting foam cans etc. in all respect. (Rates per 30L jerry cns etc. in all respect. (Rates per 30L jerry cans) |
| 28 | Cleaning of portable fire fighting equipment e.g. extinguishers, foam monitors, hydrant stands, hose boxes, foam flooding unit, air vessels, MEFG etc making it stain free as and when required as per direction of EIC |
| 29 | Maintenance of Foam deluge valve of Mainline pump shed fixed foam flooding system |
| 30 | Removing of old damaged air mesh in foam pourer outlet(250 kl tank) and replacing with new GI Mesh(approx size 1.2\"X1.2\" of 2mm dia) as directed by EIC including supply of mesh, tools and tackles etc in all complete. |
| 31 | F&S AMC COMPOSITE ITEMS |
| 32 | Painting of 2Kg Co2 extinguisher with one coat of red oxide primer & two coats of Fire red synthetic enamel paint (Asian Paint / Berger / Nerolac ). Before painting old stickers to be removed & surface preparation to be done by contractor.New water proof type inspection sticker will be supplied by contractor as per direction of EIC |
| 33 | Painting of 4.5 Kg Co2 extinguisher with one coat of red oxide primer & two coats of Fire red synthetic enamel paint (Asian Paint / Berger / Nerolac ). Before painting old stickers to be removed & surface preparation to be done by contractor. New water proof type inspection sticker will be supplied by contractor as per EIC |
| 34 | Painting of 6.8Kg CO2 extinguisher with one coat of red oxide primer & two coats of Fire red synthetic enamel paint (Asian Paint / Berger / Nerolac ). Before painting old stickers to be removed & surface preparation to be done by contractor. New water proof type inspection sticker will be supplied by contractor as per direction of EIC |
| 35 | Supply and fitting of discharge hose with clamps (6.5mtr length). Hose should not burst or show leakage before a pressure of 50Kgf/cm2. for 50/70/75 Kg DCP Extinguisher |
| 36 | Supply and fitting of brass connection tube between CO2 cylinder & DCP cylinder with leather washer. for 50/70/75 Kg DCP Extinguisher |
| 37 | Supply & fitting fire hydrant disc washer made of neoprene rubber as per direction of EIC and IS Type A of IS 937 : 1981 |
| 38 | Supply & fitting Fire hydrant/ fire hose coupling washer for LANDING VALVE DOUBLE HEADOUTLETS (TYPE B) as per IS Type A of IS 937 |
| 39 | Supply and fitting of Spindle assembly for HYDRANT OUTLETS including check nut and wheel as per IS5290 : 1993 for LANDING VALVE DOUBLE HEAD OUTLET (TYPE B)( Gunmetal)hydrants |
| 40 | Supply & fitting of glass of hose box inclusive of rubber beading wherever required complete in all respect inclusive of material, labour, consumables etc.(Rate for both glasses & rubber beading) |
| 41 | Painting of Hydrant outlets (single hydrant double valve/single hydrant double headed) on both sidesby luminous Fire Red (2 coat) along with cleaning and metal primer (one coat) as per direction EIC complete inall respect including labour ,paint , tools tackles , consumable etc direction EIC complete in all respect including labour , tools tackles , consumable etc. |
| 42 | Supply and application of one coat of Epoxy zinc rich primer to a DFTof 50 microns followed by two coats of epoxy high build finish paint toadry film thickness of 100 microns per coat. Fire Red shade forfirewater lines and Canary Yellow shade for foam pourer lines. Total DFTshall be in the range of 250 microns. foam pourer pipings, total sprinkler system, exterior pipin sprinkler lines, hose box, AFFF containers etc. as per site engineer/EIC |
| 43 | Supply and Fitting of new wind socks reflective floroscent type in two colour (as per IOC specification ), removing of old wind sock over FLT and water tank as per direction of site engineer/ EIC. Wind sock should be made from strong and durable nylon or flat material with anticorrosive anti-agening polyurethane coating to increase tear resistance. It should not tear easily. Warranty of 12months should be given. |
| 44 | Supply & Erection of stand post of wind sock in place damaged stand post as per specification of IOC and EIC including tools and tackle, labour charge sets complete in all respect |
| 45 | Supply and installation of PVC Pick up tube for foam cum water monitors (of various size) 4 M lengh as per sample as per direction of EIC. |
| 46 | Supply & changing of level pipes (hollow) of Acrylic/glass in foam tankof foam pourer, fire tender and foam flooding system etc. inclusive of all tools & tackles, consumable, transportation etc dia and height may varry from 8 mm to 12 mm and 1 to 2 meter respectively . Rates per unit |
| 47 | Writing of slogans (in Hindi, English, Gujarati) at all heights with approved paints and shade as per the direction of EIC, date changing on Pressure vessels, HOT crane, instructionsetc. Alongwith all tools , tacklesmaterialetc. The rate covers background painting(application of 1 coat primer and 2 coat paint on the board before writing) |
| 48 | Supply, Printing & Fixing of multi colour Flex Banner as per required size & design complete in all the respect as per direction of EIC. |