| 1 | Civil works |
| 2 | 2.6.1Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge.All kinds of soil |
| 3 | 2.8.1Earth work in excavation by mechanical means (Hydraulic excavator) /manual meansin foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including gettingout the excavated soil and disposal of surplus excavated soil as directed, within a leadof 50 m.All kinds of soil |
| 4 | 2.26.1 Extra for every additional lift 1.5 m or part there of in excavation / banking excavatedor stacked materials.All kinds of soil |
| 5 | 2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides offoundation etc. in layers not exceeding 20 cm in depth, consolidating each depositedlayer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 6 | 4.1.8 Providing and laying in position cement concrete of specified grade excluding thecost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mmnominal size derived from natural sources) |
| 7 | 5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 8 | 5.9.2 Centering and shuttering including strutting, etc. and removal of form for:Walls (anythickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 9 | 5.9.3 Centering and shuttering including strutting, etc. and removal of form for:Suspendedfloors, roofs, landings, balconies and access platform |
| 10 | 5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels,beams, plinth beams, girders bressumers and cantilevers |
| 11 | 5.9.6 Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts |
| 12 | 5.9.7 Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) |
| 13 | 5.33.2.1 Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cment, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement All work above plinth level upto floor V levelConcrete of M25 grade with minimum cement content of 330 kg /cum |
| 14 | 5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 15 | 5.22A.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placingin position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more |
| 16 | 5.33.1.1 Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability withoutimpairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement All work upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum |
| 17 | 13.16.1 6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) |
| 18 | 50.6.1.2 Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cmor nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etccomplete. |
| 19 | 13.1.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) |