Tender For Provision Of Otm Accommodation Under Ge 873 Ews; 1 Lump sum price worked out by the contractor for BUILDING WORKSas listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/belowthe lump sum price prepriced by the MES B/F from Sl page No. 44(R) 2 Lump sum price worked out by the contractor for (SITE CLEARANCE, EXCAVATION & EARTH WORK)as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/belowthe lump sum price prepriced by the MES B/F from Sl page No. 46(R) 3 Lump sum price worked out by the contractor for (INTERNAL WATER SUPPLY)as listed in Schedule ‘A’ Part-III representing percentage ( + or - denomination) derived under last column of this schedule above/belowthe lump sum price prepriced by the MES B/F from Sl page No. 48 4 Lump sum price worked out by the contractor for (INTERNAL ELECTRIFICATION)as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/belowthe lump sum price prepriced by the MES B/F from Sl page No. 54 5 Lump sum price worked out by the contractor for (ROAD, PATH & HARDSTANDING)as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/belowthe lump sum price prepriced by the MES B/F from Sl page No. 57 6 Lump sum price worked out by the contractor for (SEWAGE DISPOSAL)as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/belowthe lump sum price prepriced by the MES B/F from Sl page No. 59 7 Lump sum price worked out by the contractor for (EXTERNAL ELECTRIFICATION)as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/belowthe lump sum price prepriced by the MES B/F from Sl page No. 62(R) 8 Lump sum price worked out by the contractor for (EXTERNAL WATER SUPLAY)as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/belowthe lump sum price prepriced by the MES B/F from Sl page No. 63 9 Lump sum price worked out by the contractor for (HOT WATER SUPPLY)as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/belowthe lump sum price prepriced by the MES B/F from Sl page No. 64(R) 10 Lump sum price worked out by the contractor for (STANDBY DG SET FOR CHS WORKS)as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/belowthe lump sum price prepriced by the MES B/F from Sl page No. 65 11 SCH A PART - XI(Miscellaneous B/R and E/M works Note: This schedule is not pre-priced by MES and the rate indicated as Rs 0.00 under Col 5 signifies this fact only 12 INTERNAL ELECTRIFICAIONS&F Double door three phase prewired distribution board vertical DB TPN 4 way with acrylic door made out of CRCA sheets 1.6 mm thick,phosphatised powder coated with copper Bus Bar 200 Amps, 415 V,IP 43/IK09, Earth Stud, Din Rail, Polymide terminal blocks for incoming and outgoing circuits, inbuilt loose wire box ,ground terminal blocks ,duly prewired with thimbled flame retardant copper conductors and poly layer for protection in and includingMCCB4 pole 100 Amp rating repturing capacity 16 KA Note:- Single Phase MCBs are to be measured and paid for seperately. 13 S&F LED building security light, pressure die cast aluminum housing, 20/25 watts capacity, toughned glass, 240V, IP 66 class, impact resistence IK07, with suitable in-built electronic driver complete incld. fixed on a bracket made out of 1.5 mtr long Med grade GI pipe 40 mm dia bend to shape as directed fitted on wall at a height not less than 5 mtr from groundwith MS clamp, nuts and bolts and washers as required at site and incld. connecting luminarie to the nearest ceiling rose/junction box with 1.5 sqmm PVC insulated 3 core wire complete all as directed and specified by Engr-in-Charge. NOTE - Cost of all minor spares and jobs required for fixing of light fixture on wall and for electrical connections are deemed to be included in the quoted rate. 14 ROAD, PATH & HARDSTANDINGM&L for 2mm thick thermoplastic paint after perparation new bituminious surface of road by sractching spot, oil greasy sports marking material stripsconforming to BS3762 with 205 glass beads having reflective index of 1.5mm , 75% sptrical with indigenous or for foundation plan having sufficient strength to withstand heavy load without deforming and having softening point 25 to 30 of areain width of n.exc 15cm , strip in white or golden yellow colour according to IRC 35-1970 completed all as specified. 15 SEWAGE DISPOSALM&L for RCC septic tank designed to carry seage and sullage water, excavation in any type of soil, PCC 1:4:8 below foundation, RCC M30 Design Mix in walls, Base Slab, Baffle walls and Roof slab including beams etc with vent shaft, manhole opening with cover connection etc, complete as per drawing No : CELZ/TD/ST-3009 Sheet (1/4 to 4/4) dt 22 Dec 2022 for 100 Users complete. 16 M&L for RCC septic tank designed to carry seage and sullage water, excavation in any type of soil, PCC 1:4:8 below foundation, RCC M30 Design Mix in walls, Base Slab, Baffle walls and Roof slab including beams etc with vent shaft, manhole opening with cover connection etc, complete as per drawing No : CELZ/TD/ST-3009 Sheet (1/4 to 4/4) dt 22 Dec 2022 for 50 Users complete. 17 EXTERNAL ELECTRIFICATIONSupply, installation, testing and commissioning LT panel factory made dust and vermin proof outdoor type made out of 3.15 mm thick CRCA sheet including seperate compartment for each MCCB & for cable and busbar, mounted on frame of MS angle iron 40mmx40mmx6 mm with front and back openable door with lock & Key including necessary grouting and double coat powder coated of grey colour painting complete with following accessories.Necessary PU gasket should be provided on doors panel including foundation all as specified and directed having following:- 18 Aluminium bus bar chamber (4 Strips) 3 phase 415 volts 200Amps all as required Incomming(a)Supply and fix 4 Pole MCCB 125 Amp, 50 Hz, 415 V with rupturing capacity 35/36 KA. - 01 Nos Outgoing (b) Supply and fix 4 Pole MCCB 100 Amp, 50 Hz, 415 V with rupturing capacity 35/36 KA -. 02 Nos (01 Nos Spare)(c) Supply and fix 2 Pole MCCB 16 Amp, 50 Hz, 415 V with rupturing capacity 10 KA (03 Nos) (01 No spare(d) Indication lamps for R, Y, B - 1 Nos(e) Digital voltmeter 0-500 volts with selector switch - 01 Set(f)Digital ammeter with CTs of suitable as per incoming braker.(g) Panel Wiring with suitable size PVC insulated PVC sheathed 1100 volts grade with copper conductor multi-stranded cable with lugs on both ends of cable.(h) Front operated ON LOAD change overswitch 415V, 4poleof capacity 125 Amps. - o1 No (j) Lock pedestal - 01 No 19 Supply, installation, testing and commissioning LT panel, factory made dust and vermin proof outdoor type made out of 3.15 mm thick CRCA sheet including seperate compartment for each MCCB & for cable and busbar, mounted on frame of MS angle iron 40mmx40mmx6 mm with front and back openable door with lock & Key including necessary grouting and double coat powder coated of grey colour painting complete with following accessories.Necessary PU gasket should be provided on doors panelincluding foundation all as specified and directed having following;- 20 Aluminium bus bar chamber (4 Strips) 3 phase 415 volts 200 Amps all as required Incomming(a)Supply and fix 4 Pole MCCB 125 Amp, 50 Hz, 415 V with rupturing capacity 35/36 KA. - 01 Nos Outgoing (b) Supply and fix 4 Pole MCB,TPN 25 Amp, 50 Hz, 415 V with rupturing capacity 16 KA - 03 Nos (01 Spare)(c) Indication lamps for R, Y, B - 1 Nos(d) Digital voltmeter 0-500 volts with selector switch - 01 Set(e)Digital ammeter with CTs of suitable ratio as per incomer breaker- 01 Set (f) Panel Wiring with suitable size PVC insulated PVC sheathed 1100 volts grade with copper conductor multi-stranded cable with lugs on both ends of cable.(g) Front operated ON LOAD change overswitch 415V, 4poleof capacity 125 Amps. - o1 No (h) Lock pedestal - 01 No 21 Supply, installation, testing and commissioning LT panel factory made dust and vermin proof outdoor type made out of 3.15 mm thick CRCA sheet including seperate compartment for each MCCB & for cable and busbar, mounted on frame of MS angle iron 40mmx40mmx6 mm with front and back openable door with lock & Key including necessary grouting and double coat powder coated of grey colour painting complete with following accessories.Necessary PU gasket should be provided on doors panelincluding foundation all as specified and directed having following:- 22 Aluminium bus bar chamber (4 Strips) 3 phase 415 volts 100 Amps all as required Incomming (a)Supply and fix 4 Pole MCCB 63 Amp, 50 Hz, 415 V with rupturing capacity 35/36 KA. - 01 No Outgoing :-(b) Supply and fix 4 Pole MCB 25 TPN 32 Amp, 50 Hz, 415 V with rupturing capacity 16 KA - 03 Nos (01 Spare)(c) Indication lamps for R, Y, B - 1 Nos(d) Digital voltmeter 0-500 volts with selector switch - 01 Set(e)Digital ammeter with CTs of suitable r asper incomer breaker.(f) Panel Wiring with suitable size PVC insulated PVC sheathed 1100 volts grade with copper conductor multi-stranded cable with lugs on both ends of cable.(g) Front operated ON LOAD change overswitch 415V in sheet metal enclosures 4poleof capacity 125 Amps. - o1 No (h) Lock pedestal - 01 No 23 Supply, installation, testing and commissioning LT panel factory made dust and vermin proof outdoor type made out of 3.15 mm thick CRCA sheet including seperate compartment for each MCCB & for cable and busbar, mounted on frame of MS angle iron 40mmx40mmx6 mm with front and back openable door with lock & Key including necessary grouting and double coat powder coated of grey colour painting complete with following accessories.Necessary PU gasket should be provided on doors panelincluding foundation all as specified and directedhaving following:- 24 Aluminium bus bar chamber (4 Strips) 3 phase 415 volts 200 Amps all as required Incomming :-(a)Supply and fix 4 Pole MCCB 125 Amp, 50 Hz, 415 V with rupturing capacity 35/36 KA. - 01 No Outgoing:-(b) Supply and fix 4 Pole MCCB 32 Amp, 50 Hz, 415 V with rupturing capacity 16 KA. (03 Nos) (01 Spare)(c) Supply and fix 4 Pole MCB, TPN 20 Amp, 50 Hz, 415 V with rupturing capacity 16 KA.(02 Nos)(d) Single phase rotary automatic light controller nature switch with voltage range 120-440V,AC,20Amps,IP-65,50hz (e) Indication lamps for R, Y, B - 1 Nos(f) Digital voltmeter 0-500 volts with selector switch - 01 Set(g)Digital ammeter with CTs of suitable asper incomer breaker.(h) Panel Wiring with suitable size PVC insulated PVC sheathed 1100 volts grade with copper conductor multi-stranded cable with lugs on both ends of cable.(j) Front operated ON LOAD change overswitch 415V4 poleof capacity 63 Amps. - o1 No (k) Lock pedestal - 01 No 25 Supply, installation, testing and commissioning LT panel, factory made dust and vermin proof outdoor type made out of 3.15 mm thick CRCA sheet including seperate compartment for each MCCB & for cable and busbar, mounted on frame of MS angle iron 40mmx40mmx6 mm with front and back openable door with lock & Key including necessary grouting and double coat powder coated of grey colour painting complete with following accessories.Necessary PU gasket should be provided on doors panelincluding foundation all as specified and directed having following:- 26 Aluminium bus bar chamber (4 Strips) 3 phase 415 volts 250 Amps all as required Incomming :-(a)Supply and fix 4 Pole MCCB 160 Amp, 50 Hz, 415 V with rupturing capacity 35/36 KA. - 01 No Outgoing (b)Supply and fix 4 Pole MCCB 100 Amp, 50 Hz, 415 V with rupturing capacity 35/36 KA. - 01 No (c) Supply and fix 4 Pole MCB,TPN 16 Amp, 50 Hz, 415 V with rupturing capacity 16 KA.(02 No) 01 Spare(d) Supply and fixMCB,SP 06-32 Amp, 50 Hz, 415 V with rupturing capacity 16 KA.(02 No) 01 Spare(e) Indication lamps for R, Y, B - 1 Nos(f) Digital voltmeter 0-500 volts with selector switch - 01 Set(g)Digital ammeter with CTs of suitableasper incomer breaker- 01 Set (h) Panel Wiring with suitable size PVC insulated PVC sheathed 1100 volts grade with copper conductor multi-stranded cable with lugs on both ends of cable.(j) Front operated ON LOAD change overswitch 415V 4poleof capacity 160 Amps. - o1 No (k) Lock pedestal - 01 No 27 Supply, installation, testing and commissioning LT panel, factory made dust and vermin proof outdoor type made out of 3.15 mm thick CRCA sheet including seperate compartment for each MCCB & for cable and busbar, mounted on frame of MS angle iron 40mmx40mmx6 mm with front and back openable door with lock & Key including necessary grouting and double coat powder coated of grey colour painting complete with following accessoriesNecessary PU gasket should be provided on doors panelincluding foundation all as specified and directed having following:- 28 Aluminium bus bar chamber (4 Strips) 3 phase 415 volts 300 Amps all as required Incomming(a)Supply and fix 4 Pole MCCB 200 Amp, 50 Hz, 415 V with rupturing capacity 35/36 KA. - 01 No Outgoing (b)Supply and fix 4 Pole MCCB 125 Amp, 50 Hz, 415 V with rupturing capacity 35/36 KA. - 01 No (c) Supply and fix 4 Pole MCB TPN 32 Amp, 50 Hz, 415 V with rupturing capacity 16 KA. (04 Nos) (d) Indication lamps for R, Y, B - 1 Nos(e) Digital voltmeter 0-500 volts with selector switch - 01 Set(f)Digital ammeter with CTs of suitable ratio & selector switch 0-200 A cap- 01 Set (g) Panel Wiring with suitable size PVC insulated PVC sheathed 1100 volts grade with copper conductor multi-stranded cable with lugs on both ends of cable.(h) Front operated ON LOAD change overswitch 415V4poleof capacity 200 Amps. - o1 No (j) Lock pedestal - 01 No 29 Supply and fixing junction box made out of 3.15mm thick MS sheet powdered coated with locking arrangement of size (35cmx20cmx10cm) including 01No 6 Amp SP MCB, 4 Nos bus bar of suitable size with suitable number of holes fixed on street light pole with suitable MS clamps all as specified and directed by Engr-in-Charge. 30 Supply, installation, testing and commissioning of open well submersible pump with control panel, 0.5 HP capacity 07 to 40 mtr head complete all as specified and directed by Engr-in-Charge. 31 Supply, installation testing and commisioning of fully automatic dual Tank water level controler sensor with dry run protection. 32 Supply, installation, Testing and commissioning of thermosyphonic type solar water heating system of 500 LPD capacity per day. The solar water heating system shall comprise of the following:- 33 (a) Supply and fixing cylindrical type hot water tank of capacity 500 ltr with 4 equal compartments made of stainless steel sheet 2mm thick including insulation with PUF 50 mm thick of 40 kg/cum density covered with 22 SWG thick aluminium sheet cladding and staging all as specified & directed.(b) Supply and fixingcollector flat plate typeISI marked including cover plate, collector box, absorber, insulation and mild sheet staging all as specified & directed.(c) Supply and fixing temprature gauge ISI marked dial type having range 0-100 °C(d) Water piping from collectors to hot water tank including insulation with 50 mm thick PUF insulation of 40 kg/cum dencity covered with 26 SWG aluminium sheet including air vent pipe complete as per manufacturers instructions.(e) All required valves for inlet/outlet pipes all as per manufacturers instructions. Note : The firm should produce NOC from the Company (not from dealer) if not available the above model. (Drawing will be provided by contractorin prior and will be approved by Engr-in-Charge.)Note:Solar water heater rates include the cost of civil wks,cold and hot water tanks,cold and hot water pipe lines,insulation,electical cabelling etc. 34 HOT WATER SUPPLYM&L for providing ant freezing /tracer cable required to keep the pipe warm upto avoiding freezing all as specified including electric wiring cable of suitable size for connection all as specified and directed. 35 Supply and Fixing insulation tubing of size suitable for 50/40/25mm thick outer dia pipe and 13mm thick conductivity of nitrile rubber tubes class”o” plain, complete all as specified and directed.Note: Rated including aluminum cladding of 28SWG thickness on insulatedpipe having 50/40/25 mm dia and 13mm thick nitrile rubber tube complete all as specified and directed. 36 DG SET Supply, installation, testing and commissioning of diesel engine driven genrating set of capacity82.5 KVA,Silent DG Set Comprising of developing 102 BHP,415 Volts, 50Hz; 0.8 power factor, mounted on common base frame with flexible coupling, 1500 RPM at NTP with silencer pipe protected with asbestos rope independently supported from engine to outside of power house upto 1.00 metre, AVM pads, PCC 1:2:4 type B-1 (using 20 mm graded crushed stone aggregate) foundation as per manufacturers design, cold starting kit, battery start with suitable cables for connecting from DG Set to panel board, Panel complete with relay and switch gears for automatic starting on main failure. The DG set shall be capable of operating in temp range of(-) 35° to (+) 35° C) at an altitude of 3600 mtr above mean sea level (MSL)complete with and including the following: 37 (A) PRIME MOVER :Diesel engine of suitable capacity coolant cooled type Radiator mounted, closed circuit as per IS system having rated speed 1500 RPM. Engine shall be equipped with all standard fitting as per manufacturers recommendations and mounted on common base frame with following accessories/fittings:- (i) Fly wheel with housing.(ii) Air Cleaner - Oil bath type (iii) Corrosion resistors. (iv) Fuel filter, Oil filter (v) FIP system including pump injectors, solenold controls, nozzled governors etc. (vi) Oil cooler and oil pumps as applicable. (vii) Radiators fan belt. 38 (viii) Water pump assembly including thermostat etc. (ix) Silencer with buffers or expansion joints, tail piece duly insulated with asbestos lagging and sufficiently extended to carry exhaust outside the power house building/room. (x) Engine protection device against low lubricant oil pressure, high oil temperature, over speeding of engine.(xi) Battery charging ammeter. (xIi) Ignition key and starting with push button switch. (xiII) Eletronic governor controlling. (xIv) Cold starting kit fitting with engine. (xv) Anti vibration pads of required numbers.(xvi)12 Volts DC electrical starting equipment comprising of the following :- (a) 01 No 12 Volts 180 AH battery ofmaintenance free including of iron frame as directed at site by Engr-in-Charge. (b) Battery charging altemator with in built regulator. (c) Self Starter 12 V capacity. (d) Battery leads (copper cables) of suitable size with brass thembles and terminals.(B) ALTERNATOR : Alternator rating 100 KVA, 3 Phase, 50 cycles 415 volt, 4 wire supply at NTP 0.8 power factor running @ 1500 RPM, self regulated, mounted on a strong fabricated steel frame suitable for mounting on a permanent foundation to be coupled with above engine. The alternator shall be Relivent IS alongwith self regulated AVR system. 39 (B) ALTERNATOR : Alternator rating 100 KVA, 3 Phase, 50 cycles 415 volt, 4 wire supply at NTP 0.8 power factor running @ 1500 RPM, self regulated, mounted on a strong fabricated steel frame suitable for mounting on a permanent foundation to be coupled with above engine. The alternator shall be Relivent IS alongwith self regulated AVR system. (C) GENERATOR MONITORING SYSTEM: Comprising of following :-(i) Microprocessor based genset controller for metering, monitoring, governing and protection.(ii) Engine protection for low lubrication oil pressure, high coolant temp (alarm and shutdown).(iii) Alternator protection parameters like under voltage, over current, under frequency, over frequency (alarm and shutdown).(iv) Data logging : Engine hours, control hours, engine start and recent fault codes.(v) Certifications : Certificates to meet the requirements of relevant ISO, CE, CSA and other equivalent. 40 D) ACOUSTIC ENCLOSURE : Enclosure is free standing floor mounted factory built and moduler in construction to facilitate easy assembly at work site will be drop over housing type. It will consist of acoustically treated panel housed in sheets steel will provide easy access for maintenance, repairs and operation be designed to meet MoEF/CPCB norms. The enclosure is custom built to suit conditions, with the following features. (i) Custom built product for various equipments, which ensure the optimum performance. (ii) Rugged in constuructions maintenance free and modular designs which facilitate easy at site.(iii) 16 SWG (1.6 mm) thick CRCA sheets to be used for enclosure panel to ensure longer life against weathering action. High quality fire retardent acoustic insulation material to be used for maximum sound absorption. Acoustic layers are supported by perforted sheets. (iv) Sheet metal components of the enclouser should undergo various stages of surface treatment prior to painting which leads to be better life of the enclouser against weathering action. (v) Special paint treatment with pure polyester powder/ epoxy to be provided for better weather resistance.(vi) Well designed ventilation system to be provided to pump up the heat in the chamber efficiently.vii) For effective acoustic/ weather sealing a special type weather sealing gaskets, new frame rubber gaskets to be used.(viii) Working space is to be provided around the equipment for easy maintenance/ repairs.(ix) Necessary cut out provision for entry and exit of fuel lines cable to be incorporated in the enclosure as per the requirement.(x) A see through transparent window (glass or acrylic) in front of engine panel to provide for monitering the operation.(xi) Ducting if required, bellows, mechanical hardware like locks, hinges, fasteners etc to be provided. 41 (x) A see through transparent window (glass or acrylic) in front of engine panel to provide for monitering the operation.(xi) Ducting if required, bellows, mechanical hardware like locks, hinges, fasteners etc to be provided.(xii) Deliverables 75 dBA @ 1 mtr at full load under free field conditions. The temp inside the enclosure will be as per manufacturers recommendations above ambient temp.(xiii) The enclosure should provided with bulk head light fitting for inside illumination.(xiv) The battery should place inside the enclosure beside DG set on a suitable paltform.(xv) The DG set should be provided with external emergency stop push button.(xvi) The ecoustic enclosure part shall be of powder coated after pre-treatment process. The powder coating shade should be as per manufacturers design. The base frame should be painted with epoxy based black shade. (xvi) The ecoustic enclosure part shall be of powder coated after pre-treatment process. The powder coating shade should be as per manufacturers design. The base frame should be painted with epoxy based black shade. (xvii) Make of enclosure : As per OEM.(E)OTHER FITTINGS & TESTING OF DG SET(i) Battery Charger.Battery charger having electric circuit consiting of triodes, rectifier, capacitors and resistance etc. The battery charger should be able to charge the battery at all the time whenever electric supply given to battery charger through control panel or electric power point. (ii) FUEL TANK.Inbuilt fuel tank Cap for 12 hours running as per standard specifications of manufacturer includingoil level indicator etc. of manufacturer. (iii) Rubber matting Chequred of size 2 m x 1 m x 12 mm thick - 02 Nos. Note for item No 1(i) Derating factor should be considered at the time of DG set testing as per OEM recommendations.(ii) The cost of foundation shall be deemed to be included in rates quoted by the contractor as per manufacturer design. (iii) DHPP for testing purpose shall be supplied by the contractor without any extra cost to Govt. (iv) The contractor shall arrange for artificial load (Water/Electric load) for final testing of DG Set at site and the cost is deemed to be including in above offer. (v)DLP for the period of two years as per manufactures maint schedule and as directed by Engr-in-Charge is deemed to be included in the above offer. 42 vi) One set of latest Spare part catelogue with price, exploded view of parts and users manuel are deemed to be included in the offer.(vii) Rate quoted shall deemed to be inclusive of cable and termination from Generator to AMF Panel, with necessary holes to wall including making the distrubed surface good to meet the existing specification all as required at site complete all as specified.(viii) Civil Works : All civil works including PCC platform as per manufacturer design and related to foundations including of panel and Equipments including making food of existing disturbed surfaces during installation and commissioning of genset. (ix) The size of PCC plateform shall be minimum 300mm below and above the ground level. 43 Supply, installation, testing and commissioning of diesel engine driven genrating set of capacity125 KVA,developing 175 BHP, 415 Volts, 0.8 power factor, mounted on common base frame with flexible coupling, 1500 RPM at NTP with silencer pipe protected with asbestos rope independently supported from engine to outside of power house upto 1.00 metre, AVM pads, PCC 1:2:4 type B-1 (using 20 mm graded crushed stone aggregate) foundation as per manufacturers design, cold starting kit, battery start with suitable cables for connecting from DG Set to panel board, with AMF Panel complete with relay and switch gears for automatic starting on main failure. The DG set shall be capable of operating in temp range of(-) 35° to (+) 35° C) at an altitude of 4200 mtr above mean sea level (MSL) complete with and including the following: 44 (A) PRIME MOVER :Diesel engine of suitable capacity coolant cooled type (use min DAFC 50%), Radiator mounted, closed circuit as per IS system having rated speed 1500 RPM. Engine shall be equipped with all standard fitting as per manufacturers recommendations and mounted on common base frame with following accessories/fittings:- (i) Fly wheel with housing.(ii) Air Cleaner - Oil bath type (iii) Corrosion resistors. (iv) Fuel filter, Oil filter (v) FIP system including pump injectors, solenold controls, nozzled governors etc. (vi) Oil cooler and oil pumps as applicable. (vii) Radiators fan belt. (viii) Water pump assembly including thermostat etc. 45 (ix) Silencer with buffers or expansion joints, tail piece duly insulated with asbestos lagging and sufficiently extended to carry exhaust outside the power house building/room. (x) Engine protection device against low lubricant oil pressure, high oil temperature, over speeding of engine.(xi) Battery charging ammeter. (xIi) Ignition key and starting with push button switch. (xiII) Eletronic governor controlling. (xIv) Cold starting kit fitting with engine. (xv) Anti vibration pads of required numbers.(xvi)12 Volts DC electrical starting equipment comprising of the following :- (a) 01 No 12 Volts 180 AH battery of make Exide/Amaron/Luminous maintenance free including of iron frame as directed at site by Engr-in-Charge. (b) Battery charging altemator with in built regulator. (c) Self Starter 12 V capacity.(d) Battery leads (copper cables) of suitable size with brass thembles and terminals.(B) ALTERNATOR : Alternator rating 125 KVA, 3 Phase, 50 cycles 415 volt, 4 wire supply at NTP 0.8 power factor running @ 1500 RPM, self regulated, mounted on a strong fabricated steel frame suitable for mounting on a permanent foundation to be coupled with above engine. The alternator shall be Relivent IS alongwith self regulated AVR system. 46 (C) GENERATOR MONITORING SYSTEM: Comprising of following :-(i) Microprocessor based genset controller for metering, monitoring, governing and protection.(ii) Engine protection for low lubrication oil pressure, high coolant temp (alarm and shutdown).(iii) Alternator protection parameters like under voltage, over current, under frequency, over frequency (alarm and shutdown).(iv) Data logging : Engine hours, control hours, engine start and recent fault codes.(v) Certifications : Certificates to meet the requirements of relevant ISO, CE, CSA and other equivalent.(D) ACOUSTIC ENCLOSURE : Enclosure is free standing floor mounted factory built and moduler in construction to facilitate easy assembly at work site will be drop over housing type. It will consist of acoustically treated panel housed in sheets steel will provide easy access for maintenance, repairs and operation be designed to meet MoEF/CPCB norms. The enclosure is custom built to suit conditions, with the following features. (i) Custom built product for various equipments, which ensure the optimum performance. (ii) Rugged in constuructions maintenance free and modular designs which facilitate easy at site.(iii) 16 SWG (1.6 mm) thick CRCA sheets to be used for enclosure panel to ensure longer life against weathering action. High quality fire retardent acoustic insulation material to be used for maximum sound absorption. Acoustic layers are supported by perforted sheets. (iv) Sheet metal components of the enclouser should undergo various stages of surface treatment prior to painting which leads to be better life of the enclouser against weathering action. (v) Special paint treatment with pure polyester powder/ epoxy to be provided for better weather resistance.(vi) Well designed ventilation system to be provided to pump up the heat in the chamber efficiently. 47 (vii) For effective acoustic/ weather sealing a special type weather sealing gaskets, new frame rubber gaskets to be used.(viii) Working space is to be provided around the equipment for easy maintenance/ repairs.(ix) Necessary cut out provision for entry and exit of fuel lines cable to be incorporated in the enclosure as per the requirement.(x) A see through transparent window (glass or acrylic) in front of engine panel to provide for monitering the operation.(xi) Ducting if required, bellows, mechanical hardware like locks, hinges, fasteners etc to be provided.(xii) Deliverables 75 dBA @ 1 mtr at full load under free field conditions. The temp inside the enclosure will be as per manufacturers recommendations above ambient temp.(xiii) The enclosure should provided with bulk head light fitting for inside illumination.(xiv) The battery should place inside the enclosure beside DG set on a suitable paltform.(xv) The DG set should be provided with external emergency stop push button.(xvi) The ecoustic enclosure part shall be of powder coated after pre-treatment process. The powder coating shade should be as per manufacturers design. The base frame should be painted with epoxy based black shade.(xvii) Make of enclosure : As per OEM. 48 (E)OTHER FITTINGS. (i) Battery Charger.Battery charger having electric circuit consiting of triodes, rectifier, capacitors and resistance etc. The battery charger should be able to charge the battery at all the time whenever electric supply given to battery charger through control panel or electric power point. (ii) FUEL TANK.Inbuilt fuel tank Cap for 12 hours running as per standard specifications of manufacturer includingoil level indicator etc. of manufacturer. (iii) Rubber matting Chequred of size 2 m x 1 m x 12 mm thick - 02 Nos. Note (i) Derating factor should be considered at the time of DG set testing as per OEM recommendations.(ii) The cost of foundation shall be deemed to be included in rates quoted by the contractor as per manufacturer design. (iii) DHPP for testing purpose shall be supplied by the contractor without any extra cost to Govt. (iv) The contractor shall arrange for artificial load (Water/Electric load) for final testing of DG Set at site and the cost is deemed to be including in above offer. (v) DLP for the period of two years as per manufactures mainr schedule and as directed by Engr-in-Charge is deemed to be includedin the offer.(vi) One set of latest Spare part catelogue with price, exploded view of parts and users manuel are deemed to be included in the offer.(vii) Rate quoted shall deemed to be inclusive of cable and termination from Generator to AMF Panel, with necessary holes to wall including making the distrubed surface good to meet the existing specification all as required at site complete all as specified.(viii) Civil Works : All civil works including PCC platform as per manufacturer design and related to foundations including of panel and Equipments including making food of existing disturbed surfaces during installation and commissioning of genset. The depth of the foundation shall be minimum 300 mm with antivibration pads or as recommended by the manufacturers. 49 Supply, installation, testing and commissioning of diesel engine driven genrating set of capacity62.5 developing 83 BHP, 415 Volts, 50Hz; 0.8 power factor, mounted on common base frame with flexible coupling, 1500 RPM at NTP with silencer pipe protected with asbestos rope independently supported from engine to outside of power house upto 1.00 metre, AVM pads, PCC 1:2:4 type B-1 (using 20 mm graded crushed stone aggregate) foundation as per manufacturers design, cold starting kit, battery start with suitable cables for connecting from DG Set to panel board, with ASAS Panel complete with relay and switch gears for automatic starting on main failure. The DG set shall be capable of operating in temp range of(-) 35° to (+) 35° C) at an altitude of 4200 mtr above mean sea level (MSL) complete with and including the following:(A) PRIME MOVER :Diesel engine of suitable capacity coolant cooled type (use min DAFC 50%), Radiator mounted, closed circuit as per IS system having rated speed 1500 RPM. Engine shall be equipped with all standard fitting as per manufacturers recommendations and mounted on common base frame with following accessories/fittings:- 50 (i) Fly wheel with housing.(ii) Air Cleaner - Oil bath type (iii) Corrosion resistors. (iv) Fuel filter, Oil filter (v) FIP system including pump injectors, solenold controls, nozzled governors etc. (vi) Oil cooler and oil pumps as applicable. (vii) Radiators fan belt. (viii) Water pump assembly including thermostat etc. (ix) Silencer with buffers or expansion joints, tail piece duly insulated with asbestos lagging and sufficiently extended to carry exhaust outside the power house building/room. (x) Engine protection device against low lubricant oil pressure, high oil temperature, over speeding of engine. (xi) Battery charging ammeter. (xIi) Ignition key and starting with push button switch. (xiII) Eletronic governor controlling. (xIv) Cold starting kit fitting with engine. (xv) Anti vibration pads of required numbers.(xvi)12 Volts DC electrical starting equipment comprising of the following :-(a) 01 No 12 Volts 180 AH battery of maintenance free including of iron frame as directed at site by Engr-in-Charge. (b) Battery charging altemator with in built regulator. (c) Self Starter 12 V capacity. (d) Battery leads (copper cables) of suitable size with brass thembles and terminals.(B) ALTERNATOR : Alternator rating 62.50 KVA, 3 Phase, 50 cycles 415 volt, 4 wire supply at NTP 0.8 power factor running @ 1500 RPM, self regulated, mounted on a strong fabricated steel frame suitable for mounting on a permanent foundation to be coupled with above engine. The alternator shall be Relivent IS alongwith self regulated AVR system. 51 (C) GENERATOR MONITORING SYSTEM: Comprising of following :-(i) Microprocessor based genset controller for metering, monitoring, governing and protection.(ii) Engine protection for low lubrication oil pressure, high coolant temp (alarm and shutdown).(iii) Alternator protection parameters like under voltage, over current, under frequency, over frequency (alarm and shutdown).(iv) Data logging : Engine hours, control hours, engine start and recent fault codes.(v) Certifications : Certificates to meet the requirements of relevant ISO, CE, CSA and other equivalent.(D) ACOUSTIC ENCLOSURE : Enclosure is free standing floor mounted factory built and moduler in construction to facilitate easy assembly at work site will be drop over housing type. It will consist of acoustically treated panel housed in sheets steel will provide easy access for maintenance, repairs and operation be designed to meet MoEF/CPCB norms. The enclosure is custom built to suit conditions, with the following features. (i) Custom built product for various equipments, which ensure the optimum performance. (ii) Rugged in constuructions maintenance free and modular designs which facilitate easy at site.(iii) 16 SWG (1.6 mm) thick CRCA sheets to be used for enclosure panel to ensure longer life against weathering action. High quality fire retardent acoustic insulation material to be used for maximum sound absorption. Acoustic layers are supported by perforted sheets. (iv) Sheet metal components of the enclouser should undergo various stages of surface treatment prior to painting which leads to be better life of the enclouser against weathering action. (v) Special paint treatment with pure polyester powder/ epoxy to be provided for better weather resistance.(vi) Well designed ventilation system to be provided to pump up the heat in the chamber efficiently.(vii) For effective acoustic/ weather sealing a special type weather sealing gaskets, new frame rubber gaskets to be used.viii) Working space is to be provided around the equipment for easy maintenance/ repairs.(ix) Necessary cut out provision for entry and exit of fuel lines cable to be incorporated in the enclosure as per the requirement.(x) A see through transparent window (glass or acrylic) in front of engine panel to provide for monitering the operation.(xi) Ducting if required, bellows, mechanical hardware like locks, hinges, fasteners etc to be provided.(xii) Deliverables 75 dBA @ 1 mtr at full load under free field conditions. The temp inside the enclosure will be as per manufacturers recommendations above ambient temp. 52 (xiii) The enclosure should provided with bulk head light fitting for inside illumination.(xiv) The battery should place inside the enclosure beside DG set on a suitable paltform.(xv) The DG set should be provided with external emergency stop push button.(xvi) The ecoustic enclosure part shall be of powder coated after pre-treatment process. The powder coating shade should be as per manufacturers design. The base frame should be painted with epoxy based black shade. (xvii) Make of enclosure : As per OEM.(E)OTHER FITTINGS. (i) Battery Charger.Battery charger having electric circuit consiting of triodes, rectifier, capacitors and resistance etc. The battery charger should be able to charge the battery at all the time whenever electric supply given to battery charger through control panel or electric power point. (ii) FUEL TANK.Inbuilt fuel tank Cap for 12 hours running as per standard specifications of manufacturer includingoil level indicator etc. of manufacturer. (iii) Rubber matting Chequred of size 2 m x 1 m x 12 mm thick - 02 Nos. 53 Note :(i) Derating factor should be considered at the time of DG set testing as per OEM recommendations.(ii) The cost of foundation shall be deemed to be included in rates quoted by the contractor as per manufacturer design. (iii) DHPP for testing purpose shall be supplied by the contractor without any extra cost to Govt. (iv) The contractor shall arrange for artificial load (Water/Electric load) for final testing of DG Set at site and the cost is deemed to be including in above offer.(v) DLP for the period of two years as per manufacturesmaint schedule and as directed by Engr-in-Charge deemed to be included in the above offer. (vi) One set of latest Spare part catelogue with price, exploded view of parts and users manuel are deemed to be included in the offer.(vii) Rate quoted shall deemed to be inclusive of cable and termination from Generator to AMF Panel, with necessary holes to wall including making the distrubed surface good to meet the existing specification all as required at site complete all as specified.(viii) Civil Works : All civil works including PCC platform as per manufacturer design and related to foundations including of panel and Equipments including making food of existing disturbed surfaces during installation and commissioning of genset. (ix) The size of the plateform shall be minimum 300mm below and 300mm above the ground level. 54 (CENTRAL HEATING SYSTEM)Oil Fired Hot Water Generator : Supply, Installation, Testing & Commissioningof Oil Fired Glycol based Hot water generator ofcap 3Lac Kcal/Hr usingHSD oil complete with combustion chamber and equipment automatic monoblock burner assembly, fire tubes, control panel with sequence controller, photo cell for flame failure, HT transfer electrodes, blower assembly, electric Panel, mounting frame, pressure gauges at inlet and outlet suitable for operation on 50 Hz, singlephase, 230 volts AC supply. The Burner should comply as per ISO or equivalent standard. Inlet temp of fluid should be as per site requirement and maximum outlet temp 90°C.The saftey valves for the Boiler are to be included in price. (For 2 Ladhak Scout) 55 (a) All neccassary accessories required for the proper fucntioning of Hot Water Genearator are included in price.(b) The prices should include lifting, shifting and positioning of units at Site.(c) Hot Water Genearator installation to done as per Manufacturer recommendation with all installation requirements i.e Foundation, Vibration Isolator,Insulationetc as recommended by Manufacturer for the Ambient Temperature of Site. ODU installation is included in ODU price which includes the Civil Struture, Mechanical Structureetc as recommended byManufacturer. Make of Boiler: Riello-- RTQ Series/Thermax-AMW Series/Ecoflam/Rapid Cool-RTC Series as per OEM of boiler. Note:- In 02 Nos working and 01 No standby configuration. 56 All as per srl item No-32.00 above but for Oil Fired Glycol based Hot water generator ofcap 2Lac Kcal/Hras per OEM of boiler. Note:- In 02 Nos working and 01 No standby configuration. (For 193 Medium Regiment) 57 All as per srl item No-32.00 above but for Oil Fired Glycol based Hot water generator ofcap 4 Lac Kcal/Hr. Make Of Burner: Riello/Ecoflam. Note:- In 02 Nos working and 01 No standby configuration. (For 09 post) 58 FLUE GAS EXHAUST PIPE:Supply, Installation, Testing & Commissioningof MS Flue Gas Exhaust Pipe as per site condition with header made out of 3 mm thick MS sheet, minimum 1.2 m above the highest point of the plant room and including connection from HOT Water generator to main vertical exhaust pipe fabricated from 3 mm MS sheet to be connected to common exhaust pipe header from 3 mm of suitable Diameter. The Hot water generators shall be connected to a independent flue gas exhaut pipe of suitable size and as per manufacturers guide lines. The portion of the flue gas exhaust pipe in side the building shall be insulated with 25 mm Mineral wool of 24 kg/cum with GI cladding of 26 gauge. Flue gas exhaust pipe ( item shall be complete with mounting/fixing arrangement) complete as per specified and recommandation of OEM in Consultantion with Engineer - In - Charge. 59 Flue gas exhaust pipe as per recommendation of OEM and site condition with Header for Pocket-1CHS plant Room 60 Flue gas exhaust pipe as per recommendation of OEM and site condition with Header for Pocket-2CHS plant Room. Note:- Pl ref Schedule drawings for the same. 61 Flue gas exhaust pipe as per recommendation of OEM and site condition with Header for Pocket-3CHS plant Room. Note:- Pl ref Schedule drawings for the same. 62 GLYCOL CIRCULATION CENTRIFUGAL PUMPS: Supply, Installation, Testing & Commissioning of PN16 ratedAxial Split Coupled Vertical Inline water pump set with CI casing, Bronze Impeller, SS Shaft and externally flushed outside type balanced mechanical seal and non overloading motor, as per specifications and drawings. with Suitable HP, TEFC squirrel cage induction motor with EFF1 type class F insulation, Motor shall be rating of IP 55, operating on 415 ±10% volts, 3 phase, 50Hz AC Supply. The external flush line must be used for the purpose of heat dissipation from the mechanical seal.Pumps with performance characteristics as given below:The internal components of pumps including mechanical seal shall be suitable to sustain a fluid temperature of -25 Degree Celcius to 120 Degree Celcius. Vendor shall be provide antivibration arrangement for pumps . The scope also shall include following below mentioned: 63 (i) Electrical by pass starter for pump set (ii) 25 mm thick polyviny nitrile rubber insulation duly cladded between aluminium sheets of 0.5mm thickness and properly clamped to pump.(iii) 3 Nos.- 150 mm dia type pressure gauges(iv) Mounting frame with antivibration pads (In case pumps are inline, anti vibration system shall be as per Manufacturers recommendation)(v) RCC/Cement concrete foundation for the pump unit. (In case pumps are inline, foundation shall be as per Manufacturers recommendation). (vi) Pump capacity are as under:(vii) Capacityand pump headnot less than flow 175 USGPM , Head 35 mtr for pocket - 1CHSeach including the triple duct valve and End Suction guide. Make of Pump: Armstrong / Xylem /Grundfoss/Wilo. Note:- In 02 Nos working and 01 No standby configuration.. 64 All as per srl item No-36.00 above but for capacityand pump headnot less than flow 80 USGPM , Head 30 mtr for pocket - 2CHS.Note:- In 02 Nos working and 01 No standby configuration. 65 All as per srl item No-3 above but for capacityand pump headnot less than flow 250 USGPM , Head 35 mtr for pocket - 3CHS. Note:- In 02 Nos working and 01 No standby configuration. 66 EXPANSION TANK and Pressurisation Unit: Supply, Installation, Testing and commissioning of INSULATED PRESSURISED CLOSED WATER EXPANSION TANK suitable for total volume ofGlycol - Water Solution, circuit along with necessary accessories such as along with necessary accessories such as 2 Nos pumps (1working +1standby) with Pressure Transmitter andinterconnecting Pipe & Isolating Valve complete with piping connections, safety relief valve, drain valve, pressure gauge, automatic air purging arrangement, etc.with Pressure Transmitter andinterconnecting Pipe & Isolating Valve complete with piping connections, safety relief valve, drain valve, pressure gauge, automatic air purging arrangement, etc. The tank shall be pre-charged. Expansion tank Shall be with replaceable heavy duty butyl rubber bladder. The tankconnections should be as per OEM recommendationsand 20 mm drain and charging valve connection to facilitate the on site charging of nitrogen in the tank. The tank shall be fitted with lifting rings and a floor mounting skirt for vertical installation. The tank must be constructed in accordance with IS-STANDARD 2825-1969 (withlates Revision)and Rated at PN 16 and ASME Stamped. The complete system shall be sourced from single manufacturer and supplied and installed with all accessories and safety fixtures required for proper functioning of the complete hydronic system. The tank shall be duly painted in approved colour shall be complete with pressure switches and power distribution and control panelIP55 Control Panel, Pressure Transmitter, interconnecting piping & wiring. (Tank capacity 500 Ltrs). Hot Glycol - Water closed vessel pressurized expansion tank as described above shall be duly Insulated with 50 mm thick PUF/Nitrile Rubber insulating material or Equivalent U valueInsulating Material and cladded with aluminium Sheet (20G). 67 Expansion Tank of 500 Lts capacity for pocket -1 68 Expansion Tank of 500 Lts capacity for pocket -2 69 Expansion Tank of 500 Lts capacity for pocket -3 70 PRESSURIZATION UNIT: for Pump Set -02 Nos (Ref. Point 4) with Control Panel and accessories for pocket -1 71 PRESSURIZATION UNIT: for Pump Set -02 Nos (Ref. Point 4) with Control Panel and accessories for pocket -2 72 PRESSURIZATION UNIT: for Pump Set -02 Nos (Ref. Point 4) with Control Panel and accessories for pocket -3 73 Make Up TANK: Supply, installation, testing and commissioning of factory made Make up Water Tank, Rectangular/Circular shape, of 4 mm thick MS sheet (IS 2062), of capacity of 550 litrescomplete with inlet, outlet, overflow, drain pipe of MS and vent with flame arrestor. Tank will be provided with supports made out of minimum 50mm angle iron duly painted, to keep tank base at minimum (1000mm) above FFL. Service platform shall be provided as per recommendations of OEM. The tank shall be provided with remote indication of levels provided level switches for on-off operation of tranfer pump. Extra high level and extra low level alarm shall be provided. Tank and structure shall be painted with two coats of synthetic enamel paint over a coat of red oxide primer complete all as specified and directed.Make up Water tank as describedabove should beduly Insulated with 50 mm thick PUF/Nitrile Rubber insulating material and cladded with aluminium Sheet (20G). 74 DAY OIL STORAGE TANK/DIESEL TANK: Supply, installation, testing and commissioning ofDiesel tank, Rectangular/Circular shape of 4 mm thick MS sheet (IS 2062), of capacity of 550 litres complete with inlet, outlet, overflow, drain pipe of MS and vent with flame arrestor. Ttank will be provided with supports made out of minimum 50mm angle iron duly painted, keep tank base at minimum 1000 mm above FFL service platform shall be provided as per recommendatios of OEM. The tank shall be provided with remote indicationof levels provided with level switches for on-off operation of tranfer pump. Extra high level and Extra low level alarm shall be provided. Tank and structure shall be painted with two coats of synthetic enamel paint over a coat of red oxide primer complete all as specified and directed. 75 DIESEL CIRCULATING PUMP: DIESEL CIRCULATING PUMP: Supply, Erection, Testing and Commissioning ofTransfer pumps for the capacity of 5 LPM, 5 meter head for Diesel Oil transfer with base frame foundation, bolts coupling coupling guard,TEFC, (OEM design HP for the required Flowand Head ) andother accessories for proper function of the pump. 76 Supply, Installation, Testing and Commissioning ofCeiling Suspended Fan Coil Unit having casing with bottom return Air Plenum complete including Direct driven fan (three speed) motor, operated on 230 volts, single phase, 50Hz, AC supply. Unit to be provided with inbulit 2way valve withcordless remote. The Ball Valve with Strainer/ Shut off Value with Strainer at inlet and outlet of FCU should be provided. The Unit Capacityshould becalculated as per BIS/ Eurovent Standard/AHRI Certification method.The below desired capacity should be calculated at Altitude of 3650 mts above sea level. Capacity calculation sheet to be provided to Engineer in Charge. The below mentioned capacity is at INLET TEMP: 65 Degree Celcius , OUTLET TEMP: 55 Degree Celcius and Below Mention External Static Pressure (ESP).Minimum Capacity should be as following:-(a) Unit to be provided with electronic Thermostat having LCD and touch button. It has to based on microprocessor operations which can realize intelligent control of room temperature. It shall also have RS485 Modbus communication function or Bacnet for BMS control.(b) Unit to be installed with Ball Valve and Auto Air vent. The desired U trap should be given as per the site Requirement. 77 1.5/2.5 KW(External Static Pressure: 50 Pa) 78 5 KW(External Static Pressure: 50 Pa) 79 9 KW(External Static Pressure: 50 Pa) 80 12 KW(External Static Pressure: 100 Pa) 81 18 KW(External Static Pressure: 100 Pa) 82 26 KW(External Static Pressure: 100 Pa) 83 30 KW(External Static Pressure: 80 Pa)Makes of FCU:Daikin (FWW Series), Midea(MKT Series), Trane,York,Carrier,Sinko 84 Supplying, fixing, testing and commissioning ofHot water Glycol pipes (Pre-Insulated) of following sizes Pre - insulated MS pipe,Class C having minimum thicknes of PUF insulation as mentioned below and of density 36 Kg/Cum and 26 gauge GI/AL cladding complete suitable for above ground as per sizes shown.The pipes should be insulated with closed cell puf of density 36±2 Kg/Cum of below mentioned thickness. The Pipe should be workable in the temp. range of-50 Degree Celciusto120 Degreec Celcius. Note:-The Pipes size 150mm & below shall be M.S. ‘C’ class as per IS : 1239 and pipes size above 150mm shall be welded black steel pipe heavy class as per IS: 3589, from minimum 6.35mm thick M.S. Sheet for pipes upto 350 mm dia. And from minimum 7mm thick MS sheet for pipes of 400 mm dia and above. 85 Inside Building 150 mm bore with 36 mm PUF thicknes and 26 Gauge Aluminium Cladding 86 125 mm with 36 mm PUF thicknes and 26 Gauge Al Cladding. 87 100 mm with 36 mm PUF thicknes and 26 Gauge Al Cladding. 88 80 mm with 36 mm PUF thicknes and 26 Gauge Al Cladding. 89 65 mm with 36 mm PUF thicknes and 26 Gauge Al Cladding. 90 50 mm with 36 mm PUF thicknes and 26 Gauge Al Cladding. 91 40 mm with 36 mm PUF thicknes and 26 Gauge Al Cladding. 92 20 mm with 36 mm PUF thicknes and 26 Gauge Al Cladding. 93 Buried under ground/Exposed to Ambient:125 mm bore with 50 mm PUF thicknes and HDPE Cladding, 26 Gauge 94 100 mm bore with 50 mm PUF thicknes and HDPE Cladding, 26 Gauge 95 80 mm bore with 50 mm PUF thicknes and HDPE Cladding, 26 Gauge 96 Supply,Installation, Testing amd commissioning of PVC (minimum 15kg/sqcm pressure rated) drain water piping complete with fittings(elbows,tees, reducers,sockets,u trap etc.) supports, jointinginsulated with XLPE class O tubular insulation and any other item required to make the system compelete. Nominal diameters of pipein mms as inducated below:- 97 25 mm dia pipe, Insulation thickness - 19 mm 98 32 mm dia pipe, Insulation thickness - 19 mm 99 40 mm dia pipe, Insulation thickness - 19 mm 100 CABLE TRAYS:- Supplying and installing following size of perforated painted with powder coating M.S. cable trays with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling/Ground/wall with M.S. suspenders including bolts & nuts, painting suspenders etc. as required of size:- 101 150 mm width X 50 mm depth X 1.6 mm thickness 102 Duct and GrillsSupply, Installation, TestingBalancing & Commissioning of G.S.S rectangular/round ducting including plenum as reuired as per IS 655 - 2006 complete with gaskets, elbows, splitters, vanes, supports adjustable dampers, etc. as per approved drawings (Factory Fabricated) as recommended by OEM.The price shall include necessary scaffolding required for working at required height thikness of sheet 22 Gauge,hot dipped Galvanised with 120GSM Zinc coating. 103 Supply and fixing of acoustic lining of supply air duct and plenum with 15 mm thick Supply and Application of Acoustic Insulation with Engineered Nitrile Rubber open cell foam with Density 140 - 180 Kg/m3 passing Class 1 Fire Performance test as per BS 476 Part 7, Air Erosion test for10,000 fpm air velocity as per ASTMC 1071-05 and with built-in antimicrobial protection. The material should pass Fungi Resistance Test as per DIN EN ISO 846 Method A and Bacterial Resistance Test as per DIN EN ISO 846 Method C; to be applied using manufacturers recommended Rubber based Adhesive in a blend of solvents. 104 Supplying & fixing of powder coated extruded aluminium Supply Air Grills with aluminium volume control dampers as per specifications. 105 Supply and fixing ofFlexible connection Duct. 106 Valves:- Supplying, fixing, testing and commissioning of following diameter valves (PN-16 Rating) (Complete with Flanges integral or welded, fittings, Nuts, Bolts & Gaskets (PN-16 Rating), strainers (Complete with flanges integral or welded, fittings, Nuts, Bolts & Gaskets (PN-16 Rating), gauges etc for condenser water circulation as per specifications. Insulation thickness ofvalves should be equal to the Insulation of PUF and GI Cladding of Pipe Section as specified:- 107 Butterfly Valve ( Insulated Valves) with CI body SS disc nitrile sheet & O ring,complete with fittings, Nuts, Bolts & Gaskets of fwg size:- 108 125 mm dia Butterfly Valve 109 100 mm dia Butterfly Valve 110 80 mm dia Butterfly Valve 111 65 mm dia Butterfly Valve 112 20 mm dia Butterfly Valve 113 Y - STRAINER (Insulated Valves) of Ductile CI Body flanged ends with stainless steel strainer forhot water circulation including Insulation thickness ofvalves should be equal to the Insulation of PUF and AllGI Cladding of as directed by Engr-in-Charge pipe section as specified. 114 100 mm dia Y STRAINER 115 80 mm dia Y STRAINER 116 65 mm dia Y STRAINER 117 20 mm dia Y STRAINER 118 NON - RETURN VALVE (Insulated Valves) with duel plate of CI body SS plates vulcanized NBR seal flanged end & PN 16 pressure rating forhot water circulation includingInsulation thickness of valves should be equal to the Insulation of PUF and GI Cladding of Pipe Section as sepcified. 119 100 mm dia NRV 120 80 mm dia NRV 121 65 mm dia NRV 122 Automatic Air Purge Valves of size minimum 20mm for hot water circulation header as specified and required by Engineer In Charge. 123 Air Separator of fwg size:- 124 100 mm 125 80 mm 126 65 mm 127 SITC of water pressure gauge (100 mm Ø) bourdon type with brass ball valve of 3/8 Ø and SS tubing, socket.Range (0-50) / (0-100) as required at site or directed by Engineer In Charge. 128 SITC of Mercury in glass industrial thermometer in SS-304 casing with 0.5 C least count, range 0-80 C. Brass oil filled thermowell of 1/2 size as required by Engineer In Charge. 129 Electrical distribution Panel :-Supply, installation, commissioning and testing of factory made,CPRI approved LT panel for CHS plantindoor type made out of CRCA sheet 2 mm thick, frame factory fabricated with front and back openable double door with locking arrangement, with MS angle section 50x50x6 mm support, duly powder coated painting having thickness not less than 100 microns provided suitable gasket to make it dust and vermin proof, suitable for 3 Phase4 wire, 415 Volts, 50 Hz, AC supply system, floor mounted and grounting the legs of panel in PCC foundation 1:4:8 complete as all directed suitable for and including the following :- 130 INCOMERS(a) Bus Bar TPN aluminium extensible type main bus bars of minimum of400 A capacity (As per capacity of corresponding incoming / Bus couplers) , and auxilliary bus bars ofsuitable capacity with heat shrunk coloured sleeves and i/c SMC bus bars supports at required intervals complete for cross section, size supports & their spacing etc. for withstanding fault level of50kA .(b)MCCB 250 Amps, 415 Volt, 36 KA, 4 Pole, thermal magnetic release - 01 No for incoming (Extended Rotary Operating Handle, Phase Spreader links and Phase barriers.Make: Legrand/Schenider/Simens(c) Change over switch 250 Amps, with front handled operated 415 Volts, 4 pole (on load). Make: Legrand/Schenider/HavellsOUTGOINGS(c) MCB 16 Amp, 10KA, TPN - 02NosPressurization PUMPs /Diesel Pump/ Boiler pump(d) MCB 40 Amp, 10KA, TPN - 03 Nos for Pumps(e) MCB 16 Amp, 10KA, TPN EL - 02 No for Pressurization PUMPs /Diesel Pump/ Boiler pump(f) MCB 16 Amp, 10KA, SPN,- 30No for Bldg load. Makes of MCBs: Legrand/Schenider/Simens(h) LED Phase indication lamps (01 Set) with 2Amp back up MCB,Breaker ON/OFF indicating light with 2A MCB, test terminal block set, circuits as per standard practice, auxiliary contacts for positive interlocking of the breakers as required. - 2 Set(j) Digital Ammeter with in built ASS,metering C.T.sCAST RESIN type, 15VA, and accuracy class-1of 800/5A for measuring current in each phase - 01 Set.(l) All accessories prewired with appropriate size copper strip or wire and thimbles etc. all as required including foundations as per Manufacturers recommendations all as directed by Engnr-in-Charge.Note : Contractor will submit the drawing of panel to GE before execution for approval. 131 Electrical distribution Panel :-Supply, installation, commissioning and testing of factory made, CPRI approved LT panel forCHS Plant, ( 09 Post) indoor type made out of CRCA sheet 2 mm thick, frame factory fabricated with front and back openable double door with locking arrangement, with MS angle section 50x50x6 mm support, duly powder coated painting having thickness not less than 100 microns provided suitable gasket to make it dust and vermin proof, suitable for 3 Phase4 wire, 415 Volts, 50 Hz, AC supply system, floor mounted and grounting the legs of panel in PCC foundation 1:4:8 complete as all directed suitable for and including the following :- 132 INCOMERSa) Bus Bar TPN aluminium extensible type main bus bars of minimum of 400A capacity (As per capacity of corresponding incoming / Bus couplers) , and auxilliary bus bars ofsuitable capacity with heat shrunk coloured sleeves and i/c SMC bus bars supports at required intervals complete for cross section, size supports & their spacing etc. for withstanding fault level of50kA .(b)MCCB 250 Amps, 415 Volt, 36 KA, 4 Pole, thermal magnetic release - 01 No for incoming (Extended Rotary Operating Handle, Phase Spreader links and Phase barriers.Make: Legrand/Schenider/Simens(c) Change over switch250 Amps with front handled operated415 Volts, 4 pole (on load). Make: Legrand/Schenider/HavellsOUTGOINGS(c) MCB 16 Amp, 10KA, SPN - 04Nos Pressurization PUMPs /Diesel Pump/ Boiler pump(d) MCB 63 Amp, 10KA, TPN - 03 Nos for Pumps(e) MCB 16 Amp, 10KA, SPN EL - 40 No for FCU.(f) LED Phase indication lamps (01 Set) with 2Amp back up MCB,Breaker ON/OFF indicating light with 2A MCB, test terminal block set, circuits as per standard practice, auxiliary contacts for positive interlocking of the breakers as required. - 2 Set(g) Digital Ammeter voltmeter with in built ASS,metering C.T.sCAST RESIN type, 15VA, and accuracy class-1of 800/5A for measuring current in each phase - 01 Set.(h) All accessories prewired with appropriate size copper strip or wire and thimbles etc. all as required including foundations as per Manufacturers recommendations all as directed by Engnr-in-Charge.Note : Contractor will submit the drawing of panel to GE before execution for approval. 133 L.T. CABLES :- Supply & Laying/ fixing of following size XLPE insulated and PVC sheathed Copper conductor unarmoured as required of 1.1 KV grade complete as required.(ISI Marked) (in ground/in pipe/in duct/on surface/on cable tray). 134 4 Core x 10 Sqmm. ( Pump) 135 4 Core x 6 Sqmm (Pump) 136 2 Single corex 2.5 sq.mm. (FCU) 137 2 Core x 4 Sqmm (Boiler Pump) 138 EARTHING & MISCELLANEOUS ITEMEarthing complete with GIearth plate electrode of size 60cm X 60cm X 6mm buried directly in ground vertically at a depth not less than 2.25 metre below normal ground level with top edge of earth plate at a depth not less than 1.5 metre below normal ground level surrounded from all sides by 15 cm thick and packed layer of charcoal dust and common salt filling in alternate layers etc and connected to and including GI strip of size 32x6 mm up to 7.5 mtr by means of bolts, nuts, check nuts and washers made of brass and protected by light grade 40mm dia upto 7.5 mtr long GI pipe connected to main controlboard and GI pipe light grade 20mm bore for watering and including funnel, wire mesh, RCC pit cover 50mm thick and PCC chamber pit with PCC 1:2:4 type C2 (including excavation and earth work disposal of surplus soil to a distance not exceeding 50 metre) and testing making test point and testing after completion all as specified and shown on plate No 3 of SSR Part-I 2009 complete all as specified & directed by Engr-in-charge. 139 Supply and fixing rubber matting conforming to IS-15652-2006 complete as required. of size2m x 1m x 25 mmall as spfd and directed by Engr-in-Charge. 140 Glycol - Water SolutionSupplying of Ethylene glycol concentrate along with the necessary additives and inhibitor in cognition in sealed barrels complete all as directed.NOTE;- (i) The glycol concentrate shall be mixed with potable water supplied by contractor and filled in central heating system pipe line after proper leak test of entire circuit. The glycol water mixture ratio shall be 55:45 and freezing temperature shall be - 45 Degree Celcius (ii) First charge of glycol is included in the quoted rate. First Charge Include Charge in CHS pipe lineStorage Tank. for :- 144 Bulk Storage Tank:- Supply, installation, testing and connecteing with the system and commissioning of horizontal cylindical oil storage tank made out of mild steel design, temrature 30°C and design pressure atmosphare + static head of liquid, tank shall be complete with manhole, lifting lugs, earthing lugs, vent pipe, dip stick, inlet, outlet connections complete all as spfd and directed. Storage capacity (Normal 10 KL, gross cap (not exceeding 10000L, shall thickness-4mm, end plate thickness 6mm.