| 1 | Construction of Community hall Building atOttapidaram Village in Ottapidarampanchayat |
| 2 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete |
| 3 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundationincluding dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification |
| 4 | Supplying and filling of conveyed earth with a lead of 1Km for basement filling |
| 5 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 6 | Brick work using country bricks of size 83/4\"x41/4\"x23/4\"in cement mortar 1:5 (One cement and fiveM.Sand) including curing neat finishing, etc., complete complying with standard specifiction. |
| 7 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification.(Contractor has to make his own arrangements for the supply of steel and binding wire) |
| 8 | Supplying and erection centering for sides and soffits inculdingetc complete., |
| 9 | Below Ground level |
| 10 | Above Ground level |
| 11 | Reinforced cement concrete 1:1½ :3 mix using 20 mmHBGSmetal inculding cost and coveyanceetc complete., |
| 12 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 13 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface ofceiling including finishing the joints smoothy with grinding machine and the surface shall bethoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. (Based on SoR 2024-25) |
| 14 | Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers. |
| 15 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stoneM.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers |
| 16 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum. |
| 17 | Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mmof approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification.(The make and brand of the tiles should be got approved by Executive Engineer before use on works) |
| 18 | Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers. |
| 19 | Supply & Fixing in position of Indian type Water closet 580 x 440mm of approved quality |
| 20 | Supply and fabricaiton of UPVC door including all coat and convyenace of all materials etc, complete |
| 21 | Supply and fixing of UPVC window of casement type from the profiel the size of outer frame 60mmx,58mm and shutter profile are reinforcement with g/1mm 125GSM and 100% corrosion free, the profiles are mutil chambered section with wall thick of 2mm the EPDM rubber covered with over all the edges of frame and shutter will be provided with expag multi power points licks and also it operated as handle . the corners and joints should be welded and cleaned, radiations fee pin headed or plain glass 4mm thick should be provideed to the sutter and it shouldnot allow leakage of water even at most ranging storms |
| 22 | Supplying and fixing PVC Rain water down fall pipes of following dia meter etc., complete. |
| 23 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 24 | Provision for Electrical arrangements |
| 25 | Wiringwith2x1.5sq.mm.PVCinsulatedunsheathedFRLSSCcopperconductorof1100VgradeinsuitablePVCrigidpipeonwallandceilingwithPVCaccessorieswithTWswitchboxwith5AFTswitchinflushwithwallcoveredwithhylumsheetof3mmthickwithpaintingofsuitablecolourforopenPVClight/fanpoint(forelectronicregulator)(5points per coil) -SD-22 |
| 26 | Wiringwith2x1.5sq.mmPVCinsulatedSCunsheathedFRLScopperconductorof1100VgradeinsuitablePVCrigidpipeonwallandceilingwithPVCaccessorieswith150x100x113mmTWswitchboxfor5A3pinnoninterlockingWallsocketwith5Aflushtypeswitchwithpaintingofsuitablecolourwithcontinuousearthwireconnectionof1.5sq.mm copper wire for open PVC plug point SD 36 |
| 27 | SupplyandfixingofTNEBmeterboardsuitablefor32Asinglephaseserviceconnectionwith32Afuseunit(500V)32Aneutrallinkandearthlink(1\"x1/8\"copperflat)onTWplankofsize375mmx300mmx19mmwithsupportingTWreepersof1\"thickaneithersidewithpaintingwithsuitableboltandnutsforfixingtheTWplankonwallwithearthconnectionandinterconnectionwith7/20PVCinsulatedcopperwirefromEBmetertofuseunitwith1No40Amp30MA Double Pole RCD / RCCB (Higher End) with suitable necessary connection SD no 125 |
| 28 | Supplyandrunof4of4sq.mm.PVCinsulatedSCunsheathedFRLScopperconductorof1100Vgradein25mmdiaGIpipe (Class \"B\") bent at both ends with necessary angle iron up right and end supports for mainsSD72 |
| 29 | Supplyandrunof4of4sq.mm.PVCinsulatedSCunsheathedFRLScopperconductorof1100Vgradeon7/20GIbearer wire for service connection mains-SD .67 |
| 30 | Supply and fixing of WT bulk head fitting with guard suitable with 7W / 9W LED bulb-SD 84 |
| 31 | Supplyandfixingofceilingfixture250/300mmcompletewithgalleryetcclearglassOpac/Crystalsuitablefor7W/9 W LED bulb with bulb SD-86 |
| 32 | Supplyandfixingof1200mm(48\")ACceilingfancompletewithsteppedelectronic300Wregulatorwith300mmdownrod on the existing clampSD 110 |
| 33 | Provision for Water Supply Arrangement |
| 34 | Provision for geological investigation charges etc complete |
| 35 | Drilling of borewell anywhere in Tamilnadu including transportation from one place to another in alluvial soil and overburden soil strata withbore of 140mm/150mm dia etc...complete |
| 36 | Drilling of borewell anywhere in Tamilnadu including transportation from one place to another inhard rock stratawith bore of 140mm/150mm dia etc...complete |
| 37 | 150 mm pvc casing pipe |
| 38 | Supply and delivery of Threephase submersible pumpset suitable for erection in to the borewell 3 HP(50x125 lpm xm) |
| 39 | Supply and delivery of Three phase Panel board with two level Guard and auto start |
| 40 | Labour charges for the erection of submersible pumpset in borewell including fixing and jointing submersible cable with proper clampsand earthing etc..complete |
| 41 | Supply and delivery of 4 sqmm PVC insulated and sheathed 3 core flat type copper cable |
| 42 | 63 mm PVC 4 Ksc |
| 43 | 50mm GI Pipe |
| 44 | 50 mm GM Gate Valve |
| 45 | 50 mm NRV |
| 46 | 40 mm HDPE hose |
| 47 | Nylon Rope |
| 48 | Service Wire SD 64 |
| 49 | Service Pipe SD 69 |
| 50 | Earthworkexcavation and depositing on bank with initial lead of 10m and lift of 2m in narrow trenches for laying of pipesin Hard stiff clay,stiff black cotton,hard red earth,shales,murram ,gravel,earth mixed with small sized boulders etc... |
| 51 | Laying offollowing pipes to proper line and level including jointing but excluding cost of pipes |
| 52 | Refilling the excavated earth after laying and joining of pipes including all labour charges etc..complete |
| 53 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} 18% |