|
| 1 | Providing Reneval BTtoPagandai Vayalveli salai, Km 0/0 - 0/390 |
| 2 | Clearing the scrub jungles including all labour charges for all labour charges etc complete. |
| 3 | Km 0/0 - 0/390 |
| 4 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br |
| 5 | Km 0/0 - 0/390 |
| 6 | Advance patch work for making up the undulation in the existing B.Tsurface to an average thickness ofof 50mm using 45mm IRC size HBG metal |
| 7 | Km 0/0 - 0/390 |
| 8 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat |
| 9 | Km 0/0 - 0/390 |
| 10 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. |
| 11 | Km 0/0 - 0/390 |
| 12 | Provision for HM Stones of size 75 x 23 x 10 cm. |
| 13 | Provision for Citizencum Name board Charges |
| 14 | Provision for Photo |
| 15 | Providing Reneval BTtoMadhurapakkamBGroad, Km 0/0 - 0/210 |
| 16 | Clearing the scrub jungles including all labour charges for all labour charges etc complete. |
| 17 | Km 0/0 - 0/210 |
| 18 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br |
| 19 | Km 0/0 - 0/210 |
| 20 | Advance patch work for making up the undulation in the existing B.Tsurface to an average thickness ofof 50mm using 45mm IRC size HBG metal |
| 21 | Km0/0 - 0/210 |
| 22 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat |
| 23 | Km0/0 - 0/210 |
| 24 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rollingseparately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges formini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. |
| 25 | Km0/0 - 0/210 |
| 26 | Provision for HM Stones of size 75 x 23 x 10 cm. |
| 27 | Provision for Citizencum Name board Charges |
| 28 | Provision for Photo |
| 29 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |