Construction of Forest Guard Quarter at Duda- 1 Earth workin excavation of foundation in hard soil or gravelly soil including dressing and leveling the bedand disposal of the excavated materials within initial leads and lifts as per direction of E.I.C. 2 Supplying & filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes,T&P etc complete. 3 Cement Concrete (1:3:6) using 40mmsize hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. 4 RRHG Stone masonry work using cm in 1:6 in foundation and plinthincluding watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete 5 R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete.- Coloumn Base 6 R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete.- Coloumn Super 7 R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete.- Plinth Beam 8 R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete.- Lintel 9 R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete.- Chajja 10 R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete.- Roof Slab 11 R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete.- Shelves 12 Providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge and cost and carriage of steel. etc. complete. 13 Brick work with Fly ash bricks 25cm x 12cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Super Structure including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. 14 25 mm thick grading plastering done over the roof slab using cm in 1:2:2 15 12mm thick C.P. in C.M.(1:6) over brick masonary to the smooth surface including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. 16 16mm thick C.P. in C.M.(1:6) over brick masonary to the smooth surface including watering, curing cost, carriage, royalty, and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. 17 6 mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chiping and slury treatment , watering, curing cost, carriage, royalty, and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. 18 Supplying, fitting and fixing vitrified tile (Plain)in floors of size 600mm x 600mm of approved make conformaing to IS : 13755 laid on 20 mm thick cement mortar (1:4) (1 cement :4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the worl all complete as per direction of E.I.C. (For New work only) 19 Providing fitting & fixing of ceramic wall tiles laid on 20 mm thick cement mortar (1:4) jointed with neat cement slurry & pigment . 20 Supplying, Fitting & fixing of M.S.window Grillsincluding cost of all materials, labour T&P, carriage& Fitting Chargesetc. complete. 21 Providing fitting & fixing Alluminium door for Lavatory including all cost of labour T & P hiring charges of Drilling Macjine labour charges etc. 22 Dressed seasoned sal wood (50mm. to 150mm. & upto 2.75m. long.) work framed and fixed (wrought and put up) in trusses, purlins, frames of doors, windows, ventilators and beams 23 32mm piasal wood or local Teak wood panelled shutters moulded panels with all labour, iron fittings, and wooden hinged cleats etc fitted and fixed complete in all respect. But excluding the cost of iron fittings 24 Distempering two coats to walls with distemper of approved shade on Newwork to give an even shade excluding cost of distemper. 25 Painting two coats with approved enamel paints of approved colour, shade over a coat ofprimer including sand papering, polishing the surface, cost, conveyances, taxes of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge. 26 Finishingto the exposed surfacesof wallwith weathercoat of anyapproved shadeon newwork 2 coats over a coat of wallprimer to give aneven shadeincludingcost of weathercoat all costof all laboursand T&Petc. complete . 27 GST (18%) 28 E.I Work 29 PH Work 30 Work Contigency