Bids Are Invited For Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Removal Of Back Pull Out Assembly And Installation Of Spare Back Pull Out Assembly Of Pump Having Motor Rating Up To 60 Kwe For Details Refer Boq Item N.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Decoupling Alignment And Coupling Of Pump And Motor Having Motor Rating Up To 60 Kwe For Details Refer Boq Item No 2 In Scope Of Work And One Bid Qty Is.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Overhauling Of Motor Of Rating From 30 Kwe To 60 Kwe For Details Refer Boq Item No 3 In Scope Of Work And One Bid Qty Is Equal To 1 No; As Per Scope Of .. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Overhauling Of Manual Operated Valve Or Overhauling Of Non Return Valve Or Overhauling Of Air Operated Piston/Flapper Type Actuator For Details Refer Bo.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Maintenance Of Actuator Of Control Valve Having Diaphragm For Details Refer Boq Item No 5 In Scope Of Work And One Bid Qty Is Equal To 2 Nos; As Per Sco.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Opening And Box Up Of Both Primary Sides (Hot Leg And Cold Leg) Man Hole Covers Of One Steam Generator For Details Refer Boq Item No 6 In Scope Of Work .. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Removal And Installation Of Secondary Side Hand Hole Covers Of Steam Generator For Isi And Water Jet Cleaning For Details Refer Boq Item No 7 In Scope .. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Primary Circulating Pump Thrust Bearing Overhauling For Details Refer Boq Item No 8 In Scope Of Work And One Bid Qty Is Equal To 1 No; As Per Scope Of W.. , Repair, 1 Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Preventive Maintenance Checks Of Primary Circulating Pump And Its Motor For Details Refer Boq Item No 9 In Scope Of Work And One Bid Qty Is Equal To 3 .. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Overhauling Of Electrical Actuator Operated /Piston Type Air Actuator Operated Valve For Details Refer Boq Item No 10 In Scope Of Work And One Bid Qty I.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Guide Nut Inspection Of Emergency Core Cooling System / Shut Down Cooling System Motorized Valve Having Valve Size 8 Inch To 12 Inch For Details Refer B.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Preventive Maintenance Checks Of Emergency Core Cooling System / Shut Down Cooling System Motorized Valve Having Size 8 Inch To 12 Inch For Details Refe.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Overhauling Of Control Valve With Valve Size Upto 6 Inches For Details Refer Boq Item No 13 In Scope Of Work And One Bid Qty Is Equal To 4 Nos; As Per S.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Preventive Maintenance Checks Of Primary Pressurizing Pump For Details Refer Boq Item No 14 In Scope Of Work And One Bid Qty Is Equal To 2 Nos; As Per S.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Preventive Maintenance Checks Of Manual Bellow Sealed Valve For Details Refer Boq Item No 15 In Scope Of Work And One Bid Qty Is Equal To 50 Nos; As Per.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Diaphragm Replacement Of Diaphragm Valve For Details Refer Boq Item No 16 In Scope Of Work And One Bid Qty Is Equal To 60 Nos; As Per Scope Of Work And .. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Replacement Or Cleaning Of Strainer/ Filter For Details Refer Boq Item No 17 In Scope Of Work And One Bid Qty Is Equal To 25 Inch Dia; As Per Scope Of W.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Replacement Of Relief Valve For Details Refer Boq Item No 18 In Scope Of Work And One Bid Qty Is Equal To 8 Nos; As Per Scope Of Work And Atc , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Flange Gasket Replacement And Tightening For Details Refer Boq Item No 19 In Scope Of Work And One Bid Qty Is Equal To 80 Inch Dia; As Per Scope Of Work.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Removal Of Snubbers (Having Approximate Weight Ranging From 10Kg To 80 Kg) For Testing And Installation After Testing For Details Refer Boq Item No 20 I.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Removal Of Steam Generator Snubber (Having Approximate Weight Of 500Kg) For Testing And Installation After Testing For Details Refer Boq Item No 21 In S.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; Replacement And Maintenance Of Primary Circulating Pump Motors Having Rating 2800 Kw For Details Refer Boq Item No 22 In Scope Of Work And One Bid Qty I.. , Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Rr Site 5 And 6; 2 Total Quantity :