| 1 | Construction of Bus Shelter atVandhalaikudalur In vandhalaikudalurPanchayatEarth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., |
| 2 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., |
| 3 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for fillingetc.complete, |
| 4 | Supplying filling with filling sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete |
| 5 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4\"x41/4\"x2\" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. |
| 6 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGSmetal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., |
| 7 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. |
| 8 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,(below) |
| 9 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,(above) |
| 10 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyanceof all materials to site and labour charges for curing etc |
| 11 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. (Based on SoR 2024-25) |
| 12 | Weathering course with brick jelly lime concrete using 20mm brick jelly withpure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 andfinshed with one course of pressed tiles of size 20x20x2cm with cement |
| 13 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stoneM.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers |
| 14 | Ceramic tiles flooring laying with new ceramic tiles of size 305x305x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc |
| 15 | Dadooing of walls with colour glazed tiles of size 300x200x6 mmof best qualityincluding cost and conveyance of all materials to site and all labour charges etc |
| 16 | Distembering two coats oil bound distemberover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete ( Innerwall ) |
| 17 | Plastic Emulsion painting two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete ( outer wall ) |
| 18 | Providing Stainless Steel Name board Charges |
| 19 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |