|
| 1 | Earth work in surface excavation exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: |
| 2 | Providing and Laying cement Concrete 1:4:10(1cement:4 coarse sand(Zone-III):8graded stone aggregate 40 mm nominal size derived from natural resources) |
| 3 | Providing and Laying cement Concrete 1:1.5:3(1cement:1.5 coarse sand(Zone-III):3graded stone aggregate 40 mm nominal size derived from natural resources) in all works like walls, columns, abutments posts, pillats, attaches pilasters,excluding cost of centering shuttering, and reinforcement upto ground level and a height of 2.1 m above the Ground level |
| 4 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 5 | Providing & Laying in position plum concrete wall with hard stone boulders in retaining wall/breast wall/toe wall in foundation , plinth & superstructure upto all heights & levels, size and shape etc with Cement concrete of mix 1:3:6 (1 cement :2 sand: 6 gradedstone 20 mm nominal size)using maximum 40% hard stone boulders in plum concrete as per directions of EIC excludng cost of centering and shuttering |
| 6 | Centering & Shuttering for Retaing Walls |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, welding placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 8 | White Washing with lime to give three or morecoats to give an even shade |
| 9 | Painting with synthetic enamel paint of approved brand and manufacture of requied colour to give an even shade(one or more coats on old work |
| 10 | Repairs to platers of Thickness 12mm to 20 mm in patches of area 2.5 sqm or under including cutting the patch in proper shape, raking out joints, preparing and plastering the surface of the walls complete, including dumping of the rubbish to the dumping ground all complete to the direction of Engineer IN Charge with cement mortar 1:4(1 cemet : 4 coarse sand) |
| 11 | Structural Steel Work in built up sections framed work including cutting, hoisting, fixing in position, and applying a priming coat of approved steel primerusing structural steel etc In gratings, frames, guard bar, ladder,brackets , gates and similar works |