Tender For Maintenance Of 9 Class Room Building At Government Higher Secondary School Peralam In Peralam Town Panchayat.; 1 Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS 20B and Sand, silt or other loose soil, wet sand, silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, cleaning and levelling the site etc., complete - Plinth Beam 2 Supplying and filling in foundation andbasement with Crushed Stone Dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. 3 Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification 4 Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9X43/8X 23/4 standard specification including finishing, curing, etc., complete complying with standard specification (Masonry projections wherever necessary for obtaining required elevation shall be done without extra cost) 5 Upto Basement 6 Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding, grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. 7 Special ceiling plastering in all floors and finishing the exposed surface of RCC items of work such as slab, beam, sunshade, facia, canopy slab, staircase waist slab, landing slab etc., with cement mortar 1:3 (One cement and three plastering sand (P- Sand)) 10mm thick including hacking the surfaces and providing cement mortar nosing, beading for sunshade, staircase, step, landing slab etc., including neat finishing and curing etc., complete complying with standard specification and as directed by the departmental officers. 8 Plastering with cement mortar 1:5 (One cement and five plastering sand (P- Sand)) 12mm thick in all floors including cost and conveyance of all materials to site etc,complete as per standard specifications 9 Weathering Course with broken brick jelly 20mm size pure slacked lime over R.C.C. roof slab the preparation of 32:12.5 for required depth and slope etc.complete. 10 Finishing the top of roof with one course of machine pressed tiles of size 200 mm x 200 mm x 20 mm of approved quality in Cement Mortar 1:3 (One Cement add three plastering sand (P- Sand)) 12 mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete 11 UPVC DoorSpecification: Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Doors of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window.The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from the Executive Engineer before use on work(PWD SOR 2020-2021, P.No 71, SI.No 247) 12 Supplying and fixing of UPVC (unplasticized polyvenyl chloride) windows of casement type opening from profole of outer frame 60mm x 58mm and shutter profile afre reinforced with GI/1mm 25gsm and 100 corrosion free the profile are multi chambered section with wall thick of 2mm the epdm rubber (black colour) covered with over all the edges of frameand shutter will be provided with spag multi power ponit locks and also it operates as handles the corners and joints to be welded and cleaned radiation free pin ended plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow the leakage of water even at most ranging of storms and should have key lockableaction security protected hingers strong locking system and as per noise and enenrgy loss 13 Manufacturing, Supplying and Fixing of Stainless Steel Hand rails for staircase using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick at required locations to a height of 900mm from finished floor level welded to 38mm dia Stainless Steel pipe post of 1.00mm thick as vertical at 900mm centre with 2 Nos. of 25mm dia intermediate horizontal stainless steel pipe of 1.60mm thick in between. The vertical pipe has to be welded to the 100 X 100 X 6mm MS base plate encased in the base concrete. The rate is inclusive of the charges for cutting, bending, welding, grinding, polishing, conveyance, electrical charges, etc. complete 14 Painting two coats of newly plastered wall surface with ready mixed exterior emulsion paint of first quality and of approved colour over a priming coat including preparing the surface, clean removal of dirt and including necessary plaster of paris putty wherever required etc., complete complying with standard specification. 15 Painting the new iron work with two coats of best pproved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat and including cost of painting materials, brushes, putty, preparation of surfaces and scaffolding charges etc., complete complying with standard specification and as directed by the departmental officer. 16 Laying with new C.C. Laminated tiles (Like Dora tiles Eurocon tiles etc),(anti skid) of 20mm thick of approved spl quality and set in Cement Mortar 1:3 (1 of cement and 3 of M- Sand ) 20mm. Thick using river M- Sand and pointing with colour cement using at the rate of 0.40 kg/M2 and mixing with colour pigment at the rate of 0.3 Kg/M2 including finishing complete with Standard Specification and as directed by the DePart ofmental Officers etc.,