| 1 | 1)Construction of Storage Godown in Ammapatti ( S.F No : 720 ) H/o Manakadavu |
| 2 | Earthwork excavation in all classes of soils and depositing on bank with initiallead and lift for foundation as per ss20B |
| 3 | Filling the basement with gravel including cost and conveyance and fillingcharges etc., as per std. Specification |
| 4 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost andconveyance of all matials to site and all labour charges etc., complete |
| 5 | Supplying and erecting centering for sides and soffits including support andstrutting up to 3.29m high for plane surface such as using mild steel sheets ofsize 90 x 40 cm and BG 10 stiffened with welded mild steel angle of size25x25x3mm for boarding laid over silver oak (country wood) joists of size10x6.50cm spaced at about 90 centre to centre and supported by casaurinaprops of 10 - 13cm dia spaced at 75cm c/c etc. complete.i) BGL |
| 6 | Column above grade beam |
| 7 | Roof slab |
| 8 | Supplying and fabrication of steel rods including cost & conveyance of steel asper std. Specification etc., complete |
| 9 | RCC 1:1.5:3 mix using 20 mm ISS HBG metal including cost & conveyance ofall materials to site and all labour charges etc., complete. i)BGL |
| 10 | ii) AGL |
| 11 | Brick work in c.m 1:5 mix using country bricks including cost & conveyance ofall materials to site and all labour charges etc., complete. |
| 12 | Weathering course in brick jelly lime concrete using broken brick jelly of size20mm uniform gauge in pure slaked lime (no crushed stone M.Sand to beused) to the proportion of brick jelly to lime being 32:12.5 by volume and laidover the RCC roof slab in a single layer of required slope and finished bybeating the concrete with wooden beaters of approved pattern, keeping thesurface constantly wet by sprinkling lime jaggery water, etc., complete as perstandard specification and as directed by the deparmental officers. |
| 13 | Finishing the top of roof with one course of machine pressed tiles of size20cmx20cmx20mm of approved quality laid in cement mortar 1:3 mix to 12mmthick mixed with water proofing compound confirming to ISS by 2% weightofcement used and the joint pointed neatly to full depth of tiles with same waterproofing compound with cement mortar, red oxide, etc., complete complyingwith std. Specifications. |
| 14 | Supplying and applying of two coats of putty of 3mm thick over the exposedRCC surface of ceiling including finishing the joints smoothy with grindingmachine and the surface shall be thoroughly cleaned out of dust and scrubbing.The Surface shall then be allowed to dry for atleast 48 hours. It shall then besand papered (waterproof abrasive sheet) to give a smooth and even surface.Any unevenness shall be made good by applying 1st coat of putty mixed withwater on the entire surface including filling up the undulations and applying 2ndcoat of putty after 6 hours of 1st coat of putty and then sand papering(waterproof abrasive sheet) the same after it is dry and finishing the surfacesmoothly, etc., complete complying with standard specifications and as directedby the Departmental Officers. [ The rates are inclusive of hire charges forgrinding machine with wheel, cost of sand paper (waterproof abrasive sheet),cost of putty blade, labour charges for grinding the joints and sand papering,two coat of putty, scrapping the putty area to level the surface smooth, etc.,complete]. The Putty shoule be got approved by the Executive Engineer beforeuse on work. |
| 15 | Providing Granolithic pattern flooring wioth cc 1:2:4 using 10-12mm HBG chipsas per standard specification |
| 16 | Plastering with cement mortar 1:5 mix to 12mm thick including cost andconveyance of all materials & all labour charges etc., complete. |
| 17 | Distembering two coats using best quality of oil bound distember including allcharges etc., |
| 18 | Painting two coats with ready mixed plastic emulsion of first class quality paintand of approved colour over a priming coat, including through scrapping cleanremoval of dirt etc., complete and including nessary plaster of paris puttiwhereever required.. |
| 19 | Painting two coats with enamel paint over new iron work including cost &conveyance of all materials to site and all labour charges etc., complete. |
| 20 | Supply and fixing of Rolling Shutter including cost and convyance of allmaerials to site and all labour charges etc., complete |
| 21 | Supply of MS Windows / Ventilators including cost and convyance of allmaerials to site and all labour charges etc., complete |
| 22 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |