|
| 1 | M&L for preparation of old painted surfaces by scraping down, cleaning and applying two coat of synthetic enamel paint to AC installation central type AC plant (package chiller water cooled) 2x50 TR all as existing colour code including sign writing as directed (AC installation comprising of compressors,mono block pumps & motors, condensers, pipe line, hot and cold pipe lines, cooling tower,AHUs, and display board) including marking direction of flow and writing SM / MES Nos of size not less than 25mm with black paint. Note : (i) Due care shall be taken to avoid paint sprinkles on glass parts, floor, air filter etc loose parts to be removed and re-fitted after cleaning (ii) Cleaning all paint sprinkles and marks shall be the responsibility of contractor. |
| 2 | Servicing and Overhauling of VRF type Air Conditioners of capacity 4.0 to 12.0 HP any make and each quarter including overhauling of connected indoor unit of various capacity complete including the following :- (a) Inspection taking down, opening (dismantling) ,washing the condensor and cooling coil complete with water by fixing indoor pvc jacket as required and cleaning with air blower and testing complete (b) Checking / examine operation of condensor, blower motor, cooling coil and checking the air circulation to ensure complete movement of working part trouble free (c) Inspection of leakage in system and removal obstruction if any (d) Inspecting all electrical connection and remove if any defects (e) Top up Refrigerent gas if required including replacement of minor parts capacitor /relay/fuse/connector/thimbles/Sensor/transformer etc.Including fixing of all the supply only items, from ser no 5 to 23.Note for item 2 to 4:- (a)Servicing of eqpts with authoried rep of bluestar/Carrier. (b)Rep of authoried agency daily reports to AGE E/M for checking of all VRF AC plant and complaint rectification. |
| 3 | Servicing and Overhauling of VRF type Air Conditioners of capacity 14.0 to 24.0 HP any make and each quater including overhauling of connected indoor unit of various capacity complete including the following :- (a) Inspection taking down, opening (dismantling) ,washing the condensor and cooling coil complete with water by fixing indoor pvc jacket as required and cleaning with air blower and testing complete (b) Checking / examine operation of condensor, blower motor, cooling coil and checking the air circulation to ensure complete movement of working part trouble free (c) Inspection of leakage in system and removal obstruction if any (d) Inspecting all electrical connection and remove if any defects (e) Top up Refrigerent gas if required.including replacement of minor parts capacitor /relay/fuse/connector/thimbles/Sensor/transformer etc. Including fixing of all the supply only items, from ser no 5 to 23. |
| 4 | Servicing and Overhauling of VRF type Air Conditioners of capacity 28.0 to 30.0 HP any make and each quater including overhauling of connected indoor unit of various capacity complete including the following :- (a) Inspection taking down, opening (dismantling) ,washing the condensor and cooling coil complete with water by fixing indoor pvc jacket as required and cleaning with air blower and testing complete (b) Checking / examine operation of condensor, blower motor, cooling coil and checking the air circulation to ensure complete movement of working part trouble free (c) Inspection of leakage in system and removal obstruction if any (d) Inspecting all electrical connection and remove if any defects (e) Top up Refrigerent gas if required.including replacement of minor parts capacitor /relay/fuse/connector/thimbles/Sensor/transformer etc. Including fixing of all the supply only items, from ser no 5 to 23. |
| 5 | Supply only VRF Outdoor unitPCB suitable for 18-28 HP make :-Caarrier/Bluestar complete all as specified and directed |
| 6 | Supply only VRF outdoor unit capacitor PCB upto 24 HP Complete all as specified and directed |
| 7 | Supply only Indoor Main PCB upto 18 HP complete all as specified and directed |
| 8 | Supply only Compressor range 12 HP as suitable complete all as specified and directed. |
| 9 | Supply only of Refrigerant Gas R410 complete all as specified and directed. |
| 10 | Supply only of Outdoor BLDC Motor as suitable size complete all as specified and diected. |
| 11 | Supply only indoor unit motor as suitable type complete all as specified and directed. |
| 12 | Supply only of outdoor LP switch as suitable size complete all as specified and directed. |
| 13 | Supply only of outdoor HP switchas suitable size complete all as specified and directed. |
| 14 | Supply only of outdoor expansion value as suitable size complete all as specified and directed. |
| 15 | Supply only of indoor expansion value as suitable size complete all as specified and directed. |
| 16 | Supply only of indoor power board as suitable size complete all as specified and directed. |
| 17 | Supply only of outdoor sensor Set as suitable size complete all as specified and directed. |
| 18 | Supply only of outdoor fan blade as suitable size complete all as specified and directed. |
| 19 | Supply only of indoor fan blade as suitable size complete all as specified and directed. |
| 20 | Supply only of outdoor power card as suitable size complete all as specified and directed. |
| 21 | Supply only of indoor gas sensor as suitable size complete all as specified and directed. |
| 22 | Supply only of indoor room sensor as suitable size complete all as specified and directed. |
| 23 | Supply only of indoor liquid sensor as suitable size complete all as specified and directed. |
| 24 | M&L for Servicing of FRP cooling tower of central type AC plant including, cleaning of inside of heads, pipe, nozzles, greasing/oiling of cooling towermotor with fan , cleaning inside tank etc and Cooling tower sprinklers, pipes, etc. shall be inspected and attended for proper spray and repair/replacement shall be done for which nothing extra be paid complete all as specified and directed. |
| 25 | M&L for overhauling & servicing ofAHUs Make ZECO capacity 15000 cfm and carry out of following tasks once in three months minimumand recordsbe maintained.:(i) Open fan section cover AHU; check belts for wear and tear. Replace if necessary, check bearings and alignment of belt drive. Refit the fan section.(ii)Inspect cables for loose/loaded terminal, rectify if necessary. (iii). Checking the system for leaks and then rectifying leaks, if any.(iv)Check AHU motor mounts for undue vibrations. Replace mounts if necessary.(v) Lubricating/greasingthe bearings of blower motor and replace bearing or bush if neccessary (vi) Carry out chemical cleaning AHU coils. (vii)The air handling unit filters shall be inspected and cleaned regularly. |
| 26 | M&L for overhauling and servicing of monoblock pump set of 5.0 or 7.5 HP capacity make kirloskar and carry out the following tasks all as specified and directed.(i). Disassemble the pump.(ii). Inspect it.(iii) Replace worn parts.(iv) checking water sealNote: Replacement of old bearing / bush and water seal complete as per existingare paid sepratily in Sch. |
| 27 | M&L for Isolating the shell and tube of condenser from water pipe line and de-scaling by circulating of concentrated solution of chemical descaler through condensers unit opening of headers and pouring acid inside tubes, cleaning by nylon brush form both side and removing complete scale from tubes and headers with proper care checking of leakage, replacement of headers gasket of both side connecting, testing including leakage detection in shell or tube condenser if any and rectification to be carried out with proper testing all as specified and directed by Engineer-in-Charge for the following :- Note : De-scalingsolutionshall be measured and paid separately as supply only under respective item of this sch. |
| 28 | M&L for servicing ofWater Cooled Scroll Chillerunits (Make: Bluestar & Model: XWCS4052AR2 ) with Micro Processor based control panel thesame shall be checked regularly for its satisfactory operation and if any electronic parts like PCB,displayunit,wiring fault etc are found defective the same shall have to be repaired/replaced by contractor in quoted rate.Note:contractor is rsponsible to attend break down immediately for above through out the contract period. |
| 29 | M&L for servicing ofhot water genrator (Make : Rapid cool and Model :RC-544) with control panel thesame shall be checked regularly for its satisfactory operation and if any electronic parts like PCB,displayunit,wiring fault etc are found defective the same shall have to be repaired/replaced by contractor in quoted rate.Note:contractor is rsponsible to attend break down immediately for above through out the contract period. |
| 30 | Supply and fixing in replacement ofAmmeter size 95mm digital type accuracy class 1.Make:AE / Enercon/L&T |
| 31 | Supply and fixing in replacement ofThermal over load relay range 0-10 amp .Make L&T or equivalent inLegrand |
| 32 | Supply and fixing in replacement ofSingle phase preventer as per sample with system supply 415 V AC 50 Hz make : Minilac/ L&T or equivalent inLegrand |
| 33 | Supply and fixing in replacement ofVolt meter size 95mm digital type accuracy class 1 Make:AE / Enercon. |
| 34 | Supply and fixing in replacement ofV Belt as per sample |
| 35 | Supply and fixing in replacement ofSensorfor cutt off switch |
| 36 | Supply only chemical descaler solution(have PH value less than 2.0 at 100% concentration) for cleaning of condensers. |
| 37 | Supply and filling Non Freezing polyolester lubricant oil(POE-160PZ)to top up the scroll compressor . Make :Denfoss/TOTALINE/MANEUROP) |
| 38 | Supply only Refrigerant gasR-407 in sealed gas cylinder. |
| 39 | Supply and fixing in replacement ofwater flow switch as per existing model. |
| 40 | Supply and fixing in replacement ofThermostatic expansion valves as per existing model. |
| 41 | S& F in replacement of Y strainer of of cooling tower as per existing sample |
| 42 | Supply and fixing in replacement ofstrainer filter for hot and cold pipe lines as per existing model. |
| 43 | Supply and fixing in replacement of dry type cleanable and easily maintainable AHUS air filter suported by GI wire as per existing sample of air handling unitcomplete all as directed by eng in charge. |
| 44 | Supply and fixing in replacement ofML-3 power contactor 3 phase Make L&T /Legrand or equivalent |
| 45 | Supply and fixing in replacement ofscroll compressor unit of Make: Danfoss andModel: SZ185S4RCincluding compressor oil of 12.5 TR capacity by cutting of suction and discharge lines, unscrewing the foundation nuts & bolts etc, supply and fixing of new scroll compressorunit of suitable make as existingby connecting suction and discharge lines with filling of refrigerant gas including welding/brazing work and tightening foundation nuts & bolts etc all as specified and directed.Note:- Refrigerant gas shall be measured and paid separately as supply only under respective item of this sch. |
| 46 | Supply and fixing in replacement of HEAT EXCHANGEPVC fills HONYCOMB TYPE OF SIZE 600X300X150 MM or nearest highersize for cooling tower of AC Plant. |
| 47 | M&L for rewinding of electric motor of AHUs/cooling tower /mono block pumpany make 3 phase, 415V, 7.5 or 5 HPwith PVC insulatedheavy duty superior qualitycopper winding wires of suitable gauge/size matching to existing, straightening and replacement of U/s spares,cleaning of stator slots properly by using adequate size of sand paper including insulating materials complete all as specified and directed. |
| 48 | Supply, fixing, jointing and testing 80 mm dia cast iron butter fly valve(ISI MARKED)flanged type completeall as specified and directed. Make :- Bir/Leader/ Kerloskar. |
| 49 | S&F in replacement of round flanged type heater U tube shaped 6 KW 240 volts, single phase 50 HZ complete all as specified and directed.Make: Daspass/Bajaj/Theeta. |
| 50 | S&F in replacement of water pressure gauge at suction and discharge side of pump in 4 inch round shape (0-100) LB/IN C2 with U or S shaped steel tube of 12mm dia approx length of 300 with pressure regulator valve brass connected with union reducer to the water supply line by making hole and welding and testing complete all as specified and directed. |
| 51 | S&F temperature meter 6 inch long for condenser suction and discharge as per existing model. |
| 52 | Supply only the following spare parts suitable for monoblock pumpof capacity 5 HP to 7.5 HP as per existing model complete all as specified. |
| 53 | a. Ball bearing |
| 54 | b. Fan cover |
| 55 | c. Impeller |
| 56 | d. Delivery casing |
| 57 | e. Saft ring |
| 58 | f.Gland |
| 59 | g.Bush |
| 60 | h. Rotor with Shaft |
| 61 | i. Stator |
| 62 | M&L for reapir of worn out shaft of monoblock pumps by welding or lathe maching or as required to remove the bearing endplayall as specified and directed by eng in charge |
| 63 | S&F in replacementMCB TP , 32-40 Amps, ,10 KA ,C curve 240volt grade completewithcontroller panelall as specified.Make Legrand or equivalent |
| 64 | S & F in replacementof 80 mm thick puff slab with aluminium sheets(Polyurathene foam with 1.2 mm thick aluminium chequred sheet) for floor insulation of cold room completeall as specified and directed.Make:- Awantika / blue star / Carrier / Ahata. |
| 65 | M&L for insulation of duct with 25mm thick thermocol, painting with black Japan paint, between GI wire mesh net including covering with aluminium sheet as per sample and making good as per existing complete with covering of all as directed by Engineer-in-charge. |