| 1 | 1.Construction ofFunction (Vizha Medai) Stage Building at Radhanarasimapuram Govt Higher Secondary Schoolin RadhanarasimapuramPanchayat. |
| 2 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
| 3 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. |
| 4 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. |
| 5 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x41/4\"x21/4\" and conveyance of all materials to site and all labour charges etc complete |
| 6 | I.Foundation and Basement |
| 7 | II. Superstructure- Ground floor |
| 8 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ). |
| 9 | GRADE BEAM |
| 10 | I. RCCColumn |
| 11 | II. SUNSHADE |
| 12 | III. LINTELS, RCC SLABS,BEAMS, TEE or ELL BEAMS, |
| 13 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification. |
| 14 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls , sides and bottom of the slabs, beams etc., shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. |
| 15 | I. Upto Basement |
| 16 | II. Superstructure- Ground floor |
| 17 | Weathering course concrete (Brick jelly lime concrete) using 20mm Broken brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing, laying, and finishing etc., complete |
| 18 | Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm of approved quality laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement etc., complete |
| 19 | Supplying and applying of two coats of putty of3mmthickovertheexposedRCCsurfaceof ceilingincludingfinishingthejointssmoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. TheSurfaceshallthenbeallowedtodryfor atleast 48 hours.It shall then be sand papered (waterproofabrasive sheet) to give a smoothandevensurface. Anyunevenness shallbemadegoodbyapplying1stcoatof puttymixedwithwaterontheentiresurface includingfillinguptheundulationsand applying 2nd coat of putty after 6 hours of 1st coatofputtyandthensandpapering (waterproof abrasive sheet) the same after it is dryandfinishingthesurfacesmoothly,etc., completecomplyingwithstandard specifications and as directed by the DepartmentalOfficers.[Theratesareinclusive of hire charges for grinding machine |
| 20 | Plastering with CM 1:5,12mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. |
| 21 | paving the floor with cermic tilessize 300x200x6 mmof best qualityincluding cost and conveyance of all materials to site and all labour charges etc complete. |
| 22 | Fabrication and supply of mild Steel Doors and Windowsof any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete. |
| 23 | i. Steel Door D1 |
| 24 | Jolies |
| 25 | window |
| 26 | White washing two coats using best freshly burnt shell lime in all the floors including cost of lime, Blue, Fevicol type gum, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. |
| 27 | Exterior emulsion two coatsover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete |
| 28 | Painting two coats over new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., withbest approved best quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with stan |
| 29 | Supplying and fixingP.V.C rainwater down fall pipe of 100mm dia with necessary shoes, bends,& clamps etc., |
| 30 | Electrical Arrangements: |
| 31 | Light/ Fan Point SD 25 |
| 32 | Plug Point SD 38 |
| 33 | Ceiling Fan SD 107 |
| 34 | 4\" 18w Crystal Glass LED Tube Light Fitting M1274 |
| 35 | TNEB Meter Board |
| 36 | Service Connection SD 66 |
| 37 | Earth Connection SD 74 |
| 38 | Provision For Sockpit Arragement |
| 39 | Provision For Stainless Steel Hand rails |
| 40 | Provision For Stainless Steel& Writing NameBorad Charges |
| 41 | GST Amount for providing Service to Government Contract Works for the above works. { GST Amount is the Total GST Amount for overall quoted amountabove this row in column \"BB\" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |