|
| 1 | Maintenance |
| 2 | 13.88:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. |
| 3 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer |
| 4 | 13.109.2:Finishing walls with water proofing cement paint of required shade :Old work (one or more coats @ 2.20 kg/10 sqm) complete. |
| 5 | 13.99.1:Painting with synthetic enamel paint of approved brand and manufacture ofrequired colour to give an even shade :One or more coats on old work |
| 6 | 10.25.2:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 7 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 8 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 9 | 11.20.4:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Ordinary cement without any pigment |
| 10 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work |
| 11 | OD277237/2025-2026:Providing and fixing PVC pipes includes jointing of pipes with one step PVC solvent cement & testing of joints complete as per dirrection of engineer in charge 25mm dia 10kgf/cm2(MODIFIED 50.18.9.3.2 WITHOUT TRENCHING AND REFILLING ) |
| 12 | OD277238/2025-2026:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. 40 mm dia 10Kgf/cm2 MODIFIED ITEM 50.18.9.5.1 (without trenching and refilling) |
| 13 | OD277239/2025-2026:Providing and fixing PVC pipes including of pipes with one step PVC solvent cement & resting of joints complete as per direction of engineer in charge . 63mm dia 6kgf/cm2 (Modified 50.18.9.7.1 without trenching and refillng) |
| 14 | OD277240/2025-2026:Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil. and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m: All kinds of soil - Pipes, cables etc, not exceeding 80 mm dia |