|
| 1 | SCHEDULE \"A\" PART-I : BOQ OF WORKS FOR B/R WORKS. |
| 2 | Preparation of old/ decorated plastered or unplastered surfaces of walls and applying one coat of white washing, complete all as specified and as directed. |
| 3 | Preparation of old/ decorated plastered or unplastered surfaces of walls and applying two coats of white washing, complete all as specified and as directed. |
| 4 | Preparation of old/ decorated plastered or unplastered surfaces of ceiling and applying one coat of white washing, complete all as specified and as directed. |
| 5 | Preparation of old/ decorated plastered or unplastered surfaces of walls and applying one coat of cement paint, complete all as specified and as directed. |
| 6 | Preparation of old/ decorated plastered or unplastered surfaces of walls including brooming down or steel wire brushing; scrapping down smoke soot, moulds, moss and efflorescent salts and trading oil and greasy spots and applying one coat of colour washing, complete all as specified and as directed. |
| 7 | Preparation of any type of surfaces by complete removal of existing treatment on plastered surfaces of walls and applying 2.0mm thick wall care putty for making even and smooth surfaces as preparatory work to surface before any type of painting, complete all as specified and as directed. |
| 8 | Preparation of old/ decorated, un-decorated, plastered surfaces of walls including complete removal of existing treatment and applying one coat of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over, complete all as specified and as directed. |
| 9 | Preparation of old/ decorated plastered or unplastered surfaces of walls including washing, rubbing down and stopping of distempered and painted surfaces and applying one coat of distemper oil emulsion, complete all as specified and as directed. |
| 10 | Preparation of old/ decorated plastered or unplastered surfaces of walls including washing, rubbing down and stopping of distempered and painted surfaces and applying two coats of distemper oil emulsion, complete all as specified and as directed. |
| 11 | Preparation of old painted wood/ wooden surfaces of any description, not otherwise described, over 10cm width or girth and applying one coat of synthetic enamel paint, complete all as specified and as directed. |
| 12 | Preparation of old painted wood/ wooden surfaces of any description, not otherwise described, over 10cm width or girth and applying two coats of synthetic enamel paint, complete all as specified and as directed. |
| 13 | Preparation of old painted steel surfaces of any description, not otherwise described, over 10cm width or girth including and applying one coat of synthetic enamel paint, complete all as specified and as directed. |
| 14 | Preparation of new plastered surfaces of walls and applying two coats of cement paint over one coat of lime wash, complete all as specified and as directed. |
| 15 | Writing letters or figures (Block, Roman, Italic or Indian) not exceeding 30 Cm high, paiting with synthetic enamel paint,of black and white colour, complete all as specified and directed.Note: Letters etc; shall be painted with thick paint, so that they stand out boldly and solidly without showing signs of brush marks, if necessary, they shall be repainted until the desired result is obtained. |
| 16 | Preparation of old surfaces of any description, over 10cm in width or girth, not otherwise described surfaces of any description wood, steel, iron, concrete, brick, stone, etc. and applying one coat of painting to floors with ready mixed paint, for use on floors; each coat, complete all as specified and as directed. |
| 17 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc, and rendering 15mm thick on fair faces of on brick masonry surfaces, in cement mortar 1:6, rendering is to be finished even and smooth (without using extra cement), complete all as specified and as directed. |
| 18 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc, and rendering 15mm thick on fair faces of on brick masonry surfaces, in cement mortar 1:4, rendering is to be finished even and smooth (without using extra cement), complete all as specified and as directed. |
| 19 | Preparation of new, plastered surfaces of walls and applying wall care putty, 2.0mm thick, as preparation of surfaces even and smooth before applying any type of paint or oil emulsion, complete all as specified and as directed. |
| 20 | Preparation of new plastered or unplastered surfaces of walls and applying two coats of distemper oil emulsion and including over one coat of chalk whiting, complete all as specified and as directed. |