| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared all labour charges, minor tools etc complete.The rate is inclusive of all consumable items andGST. |
| 2 | Painting Two coats with synthetic enamelpaint of approved brand and manufacture of required colour to give an even shade over the Wood/steel members, including cost of paint, brush, all other materials, scaffolding charges, all labour charges, transportation of all materials to work site and minor tools etc., complete. The rate is inclusive of all consumable items and GST. |
| 3 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 4 | Dismantling CC 1:2:4/1:3:6 or richer mix including disposal of dismantled materials with in a lead of 500 m including cost of all labour chargesminor tools etc. complete. The rate is inclusive of consumable items and GST |
| 5 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.including transportation charges of all materials to work site ,all labour charges and cost of minor tools etc. complete. The rate is inclusive of consumable items and GST |
| 6 | Providing and laying RCC 1:1.5:3 (1 Cement, 1.5 Mainland river sand and 3 Stone chips 20mm nominal size) works as directed by the EIC, including cost of cement (OPC Gr-43, IS 8112:1989), Mainland river sand and local stone chips, mixing of concrete, conveying and placing the same, consolidation and curing, cost of all other materials, hire charges of mixer machine, vibrator, transportation charges of all materials to work site, all labour charges, cost of minor tools etc complete. The rate is inclusive of all consumable items and GST. |
| 7 | Providing and fixing Tor steel reinforcement for R.C.C. work including cutting, bending, binding, and placing in position cost of binding wire, minor tools etc. complete.The rate is inclusive of all consumable items and GST. |
| 8 | Providing form work including centering shuttering so as to give rough finish strutting and propping etc., height of propping and centering below supporting floors to ceiling not exceeding 4m and removal of the same for in-situ reinforced cement concrete and plain cement concrete works, including cost of marine plywood 19mm thick and timber battens (Cat-II), transportation charges of all materials to worksite, all labour charges, cost of minor tools etc., complete. The rate is inclusive of all consumable items and GST. |
| 9 | Providing and fixing 20 cm thick masonry with Hollow block of size 0.40 X 0.20 X 0.20cm cast with Cement concrete1:3:6(one cement, three quarry dust and six 11.2 mm stone chips), curing, fixing with CM 1:4 in walls , including cost of cement with (OPC Gr-43, IS 8112:1989), Pulverised stone sand, all labour charges for casting, curing, walling, hire charges of Hollow block casting machine, cost of timber pallets,transportation charges of all materials to work site, all labour charges minor tools etc complete. The rate is inclusive of all consumable items and GST. |
| 10 | Making plinth protection 75 mm thick of cement concrete 1:3:6 (1 cement, 3 Pulverised sand, 6 graded stone aggregate 40 mm nominal size) including finishing the top smooth & finished with neat cement @ 9.76 kgs per 10.00 Sqm as directed by EIC, including cost of all labour charges, minor tools, GST,etc complete. |
| 11 | Providing and laying 12mm thick Cement plaster with 1:4(1 cement and 4Mainland River sand) including cost of cement,Mainland river sand, transportation charges of all materials to work site all labour charges, minor tools etc. complete.The rate is inclusive of all consumable items andGST. |
| 12 | Distempering with 1st quality acrylic distember (Ready mix) on Old work (Two coats) having VOC content less than 50 grams/ litre of approved brand and manufacture to give an even shade, including cost of all materials, labour charges,transportation of all materials to work site and minor tools etc., complete. The rate is inclusive of all consumable items and GST. |
| 13 | Providing and fixing Ist quality Vitreous Floor tiles (400 x 400 mm), thickness to be specified by the manufacturer) of approved make likelaid on 20mmm thick bed of cement mortar 1:4 (1 Cement, 4 mainland river sand) including pointing the joint with white cement and matching pigmet etc. complete., including cost of cement (OPC Gr-43, IS 8112:1989), river sand from mainland, transportation charges of all materials to work site, all labour charges, cost of minor tools etc., complete. The rate is inclusive of all consumable items and GST. |
| 14 | Providing and Fixingin frames, pannaled and Glazed Shutters For Door (Superior hardwood Cat-II Padauk Wood), windows and clestory windows including black enammeled Aluminium Butt Hinge 10cm with necessary screws excluding pannelling which will be paid for seperately. including cost of timber, Transportation Charges of all materials to work site, all labour charge, minor tools & plants and labour welfare cess etc., complete.The rate is inclusive of all consumable items and GST.35mm Thick. |
| 15 | Providing and fixing panneled or panneled and glazed shutters for doors, windows and clestory windows including black enammeled Aluminium Butt Hinge 10 cm with necessary screws excluding pannellingwhich will be paid for separately. The rate is inclusiveof all consumable item and GST. 35 MM Thick SHW |
| 16 | Providingand fixing Tarfelt Sheet in 12mm thick to stop leakage includingcost of tarfelt sheet, cost of all other materials, transportation charges, transportation charges of all labour chares, minor tools complete. The rate is inclusive of consumable items and GST. |
| 17 | Providing and fixing on wall face Non-plasticised PVC (Working pressure 4 Kgf per sqm) connecting pipe confirming to TS 4985, including jointing with seal ring confirming to IS 5382, leaving 10 mm gap for thermal expansion (110 mm Dia) as per the direction of EIC including cost of all labour charges, materials, transportation charges of materials to the work site, labour welfare cess and minor tools and plants and including GST etc., complete. |
| 18 | Providing and fixing Aluminium Handle 100 mm ISI marked anodised (AC10 as per IS 1868) transparent or dyed to required colour or shade with nuts and screws etc. complete.as directed by EIC, including cost of all labour charges, minor tools, GST, LWCetc complete. 100 mm |
| 19 | Providing and fixing Aluminium tower bolt ISI marked anodised (AC10 as per IS 1868) transparent or dyed to required colour or shade with nuts and screws etc. complete. as directed by EIC, including cost of all labour charges, minor tools, GST,LWC, etc complete.200 x 10 mm |
| 20 | Providing and fixing Sliding Door Bolt Aluminium ISI marked anodised (AC10 as per IS 1868) transparent or dyed to required colour or shade with nuts and screws etc. complete. as directed by EIC, including cost of all labour charges, minor tools, GST, LWC,etc complete. 250 x 16 mm |
| 21 | Providing and fixing of following G I Pipeof various size of ISI mark, including cost of all materials cost of all labour charges transportation charges of all materials to worksite and minor tools etc. complete. |
| 22 | G.I.Pipe 2 ½\" dia |
| 23 | G.I.Pipe 2 \" dia |
| 24 | G.I.Pipe 1 ½\" dia |
| 25 | G.I.Pipe 1\" dia |
| 26 | G.I.Pipe½\" dia |
| 27 | G.I.Pipe¾\" dia |
| 28 | Providing and fixing of following G I fitting of various size of ISI mark, including cost of all materials cost of all labour charges transportation charges of all materials to worksite and minor tools etc. complete. |
| 29 | Brass Bibcock ½\" dia |
| 30 | Brass Stop cock ½\" dia |
| 31 | PTMT Pillar cock½\" dia |
| 32 | FacilitationinOfficeworksinimplicationwith Un-Skilledmandays( 08 Hour Per day per No. ) forassistingin office worksat Building Sub-Division, ALHW,RangatBay . Worksincludes assisting in various works, like cleaning Division office, Sub-Division office, Watch & Ward duty for Division Office and AE Building Sub-Division Office, Watch & Ward of Guest Houseand Watch and Ward duty for Guest House at Long Island any other miscellaneous work that may be assigned from time to time as directed byEIC, including cost of all Labour charges, GST and LWC etc., complete. ( All multitask works). |
| 33 | FacilitationinOfficeworksinimplicationwith Semi Skilledmandays( 08 Hour Per day per No.) forassistingin office worksat Building Sub-Division, ALHW ,RangatBay . Works includes assisting in various office works , general office assistance ,Assistance in the Sub-Division, typing and drafting correspondence in English and Hindi, operation of various officeequipment like, photocopier, telephone, printer, stitching of files , distribution of office dak and files of general nature among the officers at the Building Sub-Division, Operating water pump, routine maintenence work of care taker for Guest House andany other miscellaneous work that may be assigned from time to time as directed byEIC, including cost of all Labour charges, GST and LWC etc., complete. (All multitask works). |
| 34 | FacilitationinOfficeworksinimplicationwith Skilledmandays ( 08 Hour Per day per No.) forassistingin office worksat Building Sub-Division, ALHW ,RangatBay . Works includes assisting in For repair of pipe lines from Moricedera water source etc. as & when required. Once in 15 days at the Building Sub-Divison Office andany other miscellaneous work that may be assigned from time to time as directed byEIC, including cost of all Labour charges, GST and LWC etc., complete. ( All multitask works). |
| 35 | FacilitationinOfficeworksinimplicationwith Highly Skilledmandays ( 08 Hour Per day per No.) forassistingin office worksat Building Sub-Division, ALHW ,RangatBay . Works includes assisting in various office and technical works , general office assistance in Civil, IT, and Electrical etc, to support in skill management and assistance in theBuilding Sub-Division Office, typingand drafting correspondences in English and Hindi, preparation of bills, preparing of estimate and generaltasks as directed by officers at the Building Sub-Divison Office andany other miscellaneous work that may be assigned from time to time as directed byEIC, including cost of all Labour charges, GST and LWC etc., complete. ( All multitask works). |
| 36 | FacilitationinOfficeworksinimplicationwith Un-Skilledmandays( 08 Hour Per day per No. ) forassistingin office works includes assisting in various works, like cleaning of the Rooms ,office premissess, Watch & Ward duty for ALHW Guest House at Long Islandincluding toilet cleaning and any other miscellaneous work that may be assigned from time to time as directed byEIC, including cost of all Labour charges, GST and LWC etc., complete. ( All multitask works). |