| 1 | \"H\" Schedule |
| 2 | All in all comprehensive annual repair & maintenance ofinternal electric system & electric fixtures ofvarious buildings detailed at annexure -Eincludingrepair / replacement of wires switches, modular plates,modular switches, modular sockets all type of socket ,power sockets ,switch board ,all type MCB, TUBE LIGHTS, Ceiling electric fixtures, Ceiling fans,wall fans,fan regulators, exhaust fans, gysers, switchesINDUSTRIAL socket, bells when ever required and periodical servicing as per OEM\"s recommendations to meet out the efficient performance of the equipment excludingreplacement of internal cables either on surface or concealed of size more then 6.00 Sqm. The scope of work includes following........ |
| 3 | 1. Electric system of buildings shall be kept in functional condition through out the year. |
| 4 | 2. Replacement of material shall be of the same specification as originally fixed in the buildings. |
| 5 | 3.TUBE LIGHTS, Ceiling electric fixtures, requiring replacement shall be replaced with energy saver LED lights to give required illumination |
| 6 | 4. All repair/ Replacement work included in the item and no payment will be given by the University. All such expenses will be borne by the Contractor at his own cost. |
| 7 | 5. If internal cables either on surface or concealed of size more then 6.00 Sqm are damaged or requiring replacement shall be paid extra separately. |
| 8 | 6. Ifthere is any requirment ofnew electric points, new fixtures, new Ceiling fans,exhaust fans, gysers, switches & 4 pole MCB, INDUSTRIAL socketother than originally fixed/existingin the building than it will be paid separately . |
| 9 | 7.Contractor shall arrange at his cost for redressal of complaints at appropriate time regularly as per instructions of Engineer-In charge. A register shall be maintained at University office and complaint lodged must be attended by contractor within 24 hours, The person deputed by contractor shall attend the University office daily and comply the instructions and attend complaints regularly even after office hrs i.e. during night if it is required. |
| 10 | 8.Contractor will have to employ trained and qualified electricians for the work as per direction of engineer in charge as &when required even after office hrs i.e. during night |
| 11 | 9.Universityshall notbe responsible for any kind of accident during execution of work. |
| 12 | 10.Contractor will be responsible are arrangement of all T&P required for the work. |
| 13 | 11. Qouted rates shall include allall taxes like GST, Income tax, labour cess ,any other tax imposed by the govt time to time.No payment shall be made by the university on this account. |
| 14 | 12. Entireinternal electric system will be handed over to the contractor on as is where is basis(wetherfixtures/system are in working condition or not) and contractor has to visit all buildings to assess existing condition of the system before qouting rates. |
| 15 | 13.Contractor willalso be responsible for the Day to Day operation of D.G.Set placed near Saraswati Bhawan of the UniversityCampus as per requirements toensure uninterrupted electric supply for the Saraswati Bhawan. |
| 16 | All in all comprehensive annual repair &maintenance ofexternal electric system forvarious buildings detailed at annexure -Iincludingrepair / replacement ofall type MCB, volt meter, Ampere meter, Selector switch, wiring of panels, bas bar chambers, all size of luges, all electric panels etc. except electric cables of all sizes & making cable joints, main switch front or side handle, changeover switches shall be paid separately .. |
| 17 | 1. Electric system of campusshall be kept in functional condition through out the year. |
| 18 | 2. Replacement of material shall be of the same specification as originally fixed in the electric panels |
| 19 | 3. All repair/ Replacement work included in the item and no payment will be given by the University except mentioned in the item. All such expenses will be borne by the Contractor at his own cost. |
| 20 | 4. If externalcables either on surface or concealed of size more then 6.00 Sqm are damaged or requiring replacement shall be paid extra separately. |
| 21 | 5.Contractor shall arrange at his cost for redressal of complaints at appropriate time regularly as per instructions of Engineer-In charge. A register shall be maintained at University office and complaint lodged must be attended by contractor within 2 hours, The person deputed by contractor shall attend the University office daily and comply the instructions and attend complaints regularlyeven after office hrs i.e. during night if it is required to keep the system in functional condition. |
| 22 | 6.Contractor will have to employ trained and qualified electricians for the work as per direction of engineer in charge. |
| 23 | 7.Universityshall notbe responsible for any kind of accident during execution of work. |
| 24 | 8.Contractor will be responsible are arrangement of all T&P required for the work. |
| 25 | 9. Qouted rates shall include allall taxes like GST, Income tax, labour cess ,any other tax imposed by the govt time to time.No payment shall be made by the university on this account. |
| 26 | 10. Entireexternalelectric system will be handed over to the contractor on as is where is basis and contractor has to visit campusto assess existing condition of the system before qouting rates. |
| 27 | 11.Contractor will maintain cubical panel board and asscasories fitted in it. In case of any fault repair/replace of material will be done by the contractor at his own cost. No extra payment will be made on accountof material. |
| 28 | All in all comprehensive annual repair &maintenance ofexistingexternal street lightingsystemandexternal lighting system forvarious buildings having different type/wattes HPSV,IP-65,LED lights , flood lights, gate lights etc. of the entire universitycampusdetailed at annexure -Iincludingrepair / replacement ofall type MCB, Contact, wiring of panelsall size of luges, etc. except electric cables of all sizes & making cable joints,shall be paid separately .. |
| 29 | 1.existingexternal street lightingsystemandexternal lighting system for buildings shall be kept in functional condition through out the year. |
| 30 | 2. Replacement of material shall be of the same specification as originally fixed . |
| 31 | 3. All repair/ Replacement work included in the item and no payment will be given by the University except mentioned in the item. All such expenses will be borne by the Contractor at his own cost. |
| 32 | 4.Street light fixtures,lights over buildings,requiring replacement shall be replaced with energy saver LED lights to give required illumination by the contractor at his own cost |
| 33 | 5.At any moments minimum of 90% of total fixture must be in order. The defecctive fixture must be repaired within 2 days, failing which three times of the maintennance charges payable for each fixture for the month shall be panelised and recovered from be contractor. |
| 34 | 6.Contractor shall arrange at his cost for put on & off the street light fixture at appropriate time regularly as per instructions of Engineer-In charge. A register shall be maintained at University office and complaint lodged must be attended by contractor within 12 hours, The person deputed by contractor shall attend the University office daily and comply the instructions and attend complaints regularly even after office hrs i.e. during night if it is required to keep the system in functional condition. |
| 35 | 7.Contractor will have to employ trained and qualified electricians for the work. |
| 36 | 8.Universityshall notbe responsible for any kind of accident during execution of work. |
| 37 | 9.Contractor will be responsible for safety and security of fixtures and all concemed materials |
| 38 | 10.Contractor will be responsible forarrangement of all T&P required for the work. |
| 39 | 11.Cost of all labour and material like tube, rod, starter, ballast, choke, bulbwire etc.will be born by conctractor. All material required for the work shall beequivalent to same standarde as provided at start of work . |
| 40 | 12.No. Extra payment will be made for fixing/ removal of extra existing fixture in the University. |
| 41 | 13.Contractor will be responsible for any electricity through poles and be will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor. |
| 42 | 14.Contractor will maintain cubical panel board and asscasories fitted in it. In case of any fault repair/replace of material will be done by the contractor at his own cost. No extra payment will be made on accountof material. |